Commercial Tenant Improvement / Tenant Finish Permit in South Salt Lake, Utah
Required for commercial tenant improvement and tenant finish work in South Salt Lake, reviewed against the city's own published Tenant Improvement Plan Submittal Checklist. Fees use the same city-wide valuation formula as new commercial construction (Consolidated Fee Schedule § 3.11.040.A) — South Salt Lake does not publish a separate tenant-improvement-specific fee tier.
Verified 2026-07-19 · Source
When you need this permit
- Commercial tenant improvement or remodel work regulated by the city's adopted IBC (Municipal Code § 8.10.010)
- Building Permit Application submitted through the city's Building Permits process
- Tenant Improvement Plan Submittal Checklist items addressed: floor plan showing adjacent tenants and existing conditions, exit doors and egress paths, fire-rated/occupancy separation walls with through-penetration protection (UL system numbers), differentiation between new and existing construction, room finish flame-spread ratings, seismic bracing for suspended ceilings, and — for spaces over 3,000 sq ft — a Utah State registered architect stamp on all plan sheets
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Framing / Fire-Rated Assembly
Occupancy separation and fire-rated wall assemblies, through-penetration protection, and seismic bracing for suspended ceilings verified before close-in, per the Tenant Improvement Plan Submittal Checklist.
- 2
MEP Rough-In
Electrical, plumbing, and mechanical rough-in verified against the submitted load calculations, isometric drawing, and fixture locations.
- 3
Fire System
Deferred-submittal fire sprinkler and fire alarm systems, where applicable, per the checklist's Fire section.
- 4
Final
Scheduled by calling (801) 483-6032; Certificate of Occupancy/Completion issued once compliant.
See the full South Salt Lake inspection guide — scheduling & re-inspection fees →
Tips
- Tenant spaces over 3,000 sq ft require a Utah State registered architect's original wet stamp and signature on all plan sheets, per South Salt Lake's Tenant Improvement Plan Submittal Checklist.
- The checklist requires showing the location of other tenants adjacent to the area of improvement and the existing floor plan before changes.
- South Salt Lake does not publish a tenant-improvement-specific fee tier — the same Building Fee + Plan Check Fee (65%) + State Surcharge Fee (1%) formula applies as new commercial construction.
- Fire-rated wall and through-penetration protection details (UL system numbers) are explicitly required on tenant improvement plans.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Salt Lake building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in South Salt Lake.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in South Salt Lake
Commercial Tenant Improvement / Tenant Finish Permit in other cities
Compare commercial tenant improvement / tenant finish permit fees across Utah →
Look up this fee in a different city →