Skip to main content
PermitBase

Commercial Tenant Improvement / Tenant Finish Permit in South Salt Lake, Utah

Required for commercial tenant improvement and tenant finish work in South Salt Lake, reviewed against the city's own published Tenant Improvement Plan Submittal Checklist. Fees use the same city-wide valuation formula as new commercial construction (Consolidated Fee Schedule § 3.11.040.A) — South Salt Lake does not publish a separate tenant-improvement-specific fee tier.

Verified 2026-07-19 · Source

When you need this permit

  • Commercial tenant improvement or remodel work regulated by the city's adopted IBC (Municipal Code § 8.10.010)
  • Building Permit Application submitted through the city's Building Permits process
  • Tenant Improvement Plan Submittal Checklist items addressed: floor plan showing adjacent tenants and existing conditions, exit doors and egress paths, fire-rated/occupancy separation walls with through-penetration protection (UL system numbers), differentiation between new and existing construction, room finish flame-spread ratings, seismic bracing for suspended ceilings, and — for spaces over 3,000 sq ft — a Utah State registered architect stamp on all plan sheets

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (Building Fee + Plan Check Fee + State Surcharge Fee)South Salt Lake Consolidated Fee Schedule § 3.11.040.A — same city-wide valuation formula used for new commercial construction and residential permits; no separate tenant-improvement-specific fee tier is published.
Building Fee (B) = local multiplier x Gross ICCBVD Valuation; Plan Check Fee (P) = B x 0.65; State Surcharge Fee (Y) = B x 0.01; Total = B + P + Y
Additional Plan Review (beyond initial + 2 reviews)South Salt Lake Consolidated Fee Schedule § 3.11.040.A.
$56.00/hour
Inspection Re-FeeSouth Salt Lake Consolidated Fee Schedule § 3.11.040.A.
$56.00

Review timeline

Plan reviewSouth Salt Lake’s published plan-review target
15–15 business days

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in South Salt Lake?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Framing / Fire-Rated Assembly

    Occupancy separation and fire-rated wall assemblies, through-penetration protection, and seismic bracing for suspended ceilings verified before close-in, per the Tenant Improvement Plan Submittal Checklist.

  2. 2

    MEP Rough-In

    Electrical, plumbing, and mechanical rough-in verified against the submitted load calculations, isometric drawing, and fixture locations.

  3. 3

    Fire System

    Deferred-submittal fire sprinkler and fire alarm systems, where applicable, per the checklist's Fire section.

  4. 4

    Final

    Scheduled by calling (801) 483-6032; Certificate of Occupancy/Completion issued once compliant.

See the full South Salt Lake inspection guide — scheduling & re-inspection fees →

Tips

  • Tenant spaces over 3,000 sq ft require a Utah State registered architect's original wet stamp and signature on all plan sheets, per South Salt Lake's Tenant Improvement Plan Submittal Checklist.
  • The checklist requires showing the location of other tenants adjacent to the area of improvement and the existing floor plan before changes.
  • South Salt Lake does not publish a tenant-improvement-specific fee tier — the same Building Fee + Plan Check Fee (65%) + State Surcharge Fee (1%) formula applies as new commercial construction.
  • Fire-rated wall and through-penetration protection details (UL system numbers) are explicitly required on tenant improvement plans.

Frequently asked questions

South Salt Lake requires a commercial tenant improvement / tenant finish permit for: Commercial tenant improvement or remodel work regulated by the city's adopted IBC (Municipal Code § 8.10.010); Building Permit Application submitted through the city's Building Permits process; Tenant Improvement Plan Submittal Checklist items addressed: floor plan showing adjacent tenants and existing conditions, exit doors and egress paths, fire-rated/occupancy separation walls with through-penetration protection (UL system numbers), differentiation between new and existing construction, room finish flame-spread ratings, seismic bracing for suspended ceilings, and — for spaces over 3,000 sq ft — a Utah State registered architect stamp on all plan sheets. If your project isn't listed, confirm with South Salt Lake Community Development Department, Building Permits Division at (801) 483-6063, ext. 2 before starting work.

South Salt Lake does not publish a tenant-improvement-specific fee table — tenant improvement permits use the same city-wide formula as new commercial construction (Consolidated Fee Schedule § 3.11.040.A): Building Fee (B) = local multiplier x Gross ICC Building Valuation Data valuation, plus a Plan Check Fee of 65% of B and a State Surcharge Fee of 1% of B.

South Salt Lake's published plan-review target for a commercial tenant improvement / tenant finish permit is 15–15 business days.

You'll need: Building Permit Application; Tenant Improvement Plan Submittal Checklist; ComCheck Reports. Depending on your project, South Salt Lake may also ask for: Architect Stamp (spaces over 3,000 sq ft). See the required-documents checklist on this page for details on each.

South Salt Lake requires 4 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Framing / Fire-Rated Assembly, MEP Rough-In, Fire System, Final. Schedule each through South Salt Lake Community Development Department, Building Permits Division ((801) 483-6063, ext. 2).

Apply through South Salt Lake Community Development Department, Building Permits Division at 220 E Morris Avenue, Suite 150, South Salt Lake, UT 84115. Phone: (801) 483-6063, ext. 2, email: permits@sslc.gov, per the official Building Permit Application PDF (revised 05/01/26, sslc.gov/DocumentCenter/View/246); the Building Permits page (sslc.gov/215/Building-Permits) also offers a web contact form. Planning Division: planning@sslc.gov, confirmed via the official ADU Handbook (checked 2026-07-23).. Office hours: Mon–Fri 8:00 AM – 5:00 PM, per South Salt Lake's official Building Department contact listing. Inspection scheduling by phone at (801) 483-6032; Right-of-Way, Demolition, and Sign Permits handled via ext. 3.. Official information: https://sslc.gov/215/Building-Permits.

South Salt Lake, Utah has adopted: International Building Code (IBC) and International Residential Code (IRC), as adopted by the State of Utah and published by the International Code Council (ICC), adopted as the Building Code of South Salt Lake City together with Utah Administrative Code Rule R156-56, per South Salt Lake Municipal Code § 8.10.010 (Ord. No. 2020-06, § VI, 6-3-2020). Local amendments include: Appendix J of the 2012 IBC adopted with an added grading-permit requirement (§8.10.010.A); Appendix P of the 2006 IRC adopted (§8.10.010.B).; International Fire Code (IFC), as adopted by the State of Utah and published by ICC, adopted as the Fire Code of South Salt Lake City, including Appendix D, per Municipal Code § 8.10.020.; International Mechanical Code (IMC) and International Fuel Gas Code (IFGC), as adopted by the State of Utah and published by ICC, adopted as the Mechanical Code of South Salt Lake City, per Municipal Code § 8.10.040.; International Plumbing Code (IPC), as adopted by the State of Utah and published by ICC, adopted as the city's Plumbing Code, with Sections 106.1 and 107.1 of the 2012 IPC locally amended to require permits/fees per the consolidated fee schedule, per Municipal Code § 8.10.070.; National Electrical Code (NEC), as adopted by the National Fire Protection Association and the State of Utah, adopted as the Electrical Code of South Salt Lake City including all city and state amendments, per Municipal Code § 8.10.080.; Uniform Housing Code, 1997 edition (International Conference of Building Officials), adopted as the Housing Code of South Salt Lake City, per Municipal Code § 8.10.050.; Uniform Administrative Code (International Conference of Building Officials) adopted, with fee chapters applied only to the extent they do not conflict with South Salt Lake's own code, per Municipal Code § 8.10.060.; Uniform Code for Building Conservation (International Conference of Building Officials), adopted with all appendices, per Municipal Code § 8.10.090.; Uniform Code for the Abatement of Dangerous Buildings, 1997 edition (International Conference of Building Officials), adopted per Municipal Code § 8.10.100.; All technical codes above are adopted by reference except where they conflict with Utah Code Title 15A and the technical codes adopted therein (the statewide framework), per Municipal Code § 8.10.010.F.. Local amendments apply — see the South Salt Lake overview page for the full list.

Per the city's official Tenant Improvement Plan Submittal Checklist, plans must show the floor plan with adjacent tenants and existing conditions, exit doors and egress paths, occupancy/fire-rated separation walls with UL-listed through-penetration protection, room finishes with flame-spread ratings, seismic bracing for suspended ceilings, and — for spaces over 3,000 sq ft — a Utah State registered architect's stamp.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the South Salt Lake building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in South Salt Lake.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.