Skip to main content
PermitBase

South Salt Lake building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for South Salt Lake, Utah.

Last verified 2026-07-23 · Source · Embed this page’s badge · Version history

Building department

Address
220 E Morris Avenue, Suite 150, South Salt Lake, UT 84115
Phone
(801) 483-6063, ext. 2
Office hours
Mon–Fri 8:00 AM – 5:00 PM, per South Salt Lake's official Building Department contact listing. Inspection scheduling by phone at (801) 483-6032; Right-of-Way, Demolition, and Sign Permits handled via ext. 3.

Inspection guide

See how inspections work in South Salt Lake — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • International Building Code (IBC) and International Residential Code (IRC), as adopted by the State of Utah and published by the International Code Council (ICC), adopted as the Building Code of South Salt Lake City together with Utah Administrative Code Rule R156-56, per South Salt Lake Municipal Code § 8.10.010 (Ord. No. 2020-06, § VI, 6-3-2020). Local amendments include: Appendix J of the 2012 IBC adopted with an added grading-permit requirement (§8.10.010.A); Appendix P of the 2006 IRC adopted (§8.10.010.B).
  • International Fire Code (IFC), as adopted by the State of Utah and published by ICC, adopted as the Fire Code of South Salt Lake City, including Appendix D, per Municipal Code § 8.10.020.
  • International Mechanical Code (IMC) and International Fuel Gas Code (IFGC), as adopted by the State of Utah and published by ICC, adopted as the Mechanical Code of South Salt Lake City, per Municipal Code § 8.10.040.
  • International Plumbing Code (IPC), as adopted by the State of Utah and published by ICC, adopted as the city's Plumbing Code, with Sections 106.1 and 107.1 of the 2012 IPC locally amended to require permits/fees per the consolidated fee schedule, per Municipal Code § 8.10.070.
  • National Electrical Code (NEC), as adopted by the National Fire Protection Association and the State of Utah, adopted as the Electrical Code of South Salt Lake City including all city and state amendments, per Municipal Code § 8.10.080.
  • Uniform Housing Code, 1997 edition (International Conference of Building Officials), adopted as the Housing Code of South Salt Lake City, per Municipal Code § 8.10.050.
  • Uniform Administrative Code (International Conference of Building Officials) adopted, with fee chapters applied only to the extent they do not conflict with South Salt Lake's own code, per Municipal Code § 8.10.060.
  • Uniform Code for Building Conservation (International Conference of Building Officials), adopted with all appendices, per Municipal Code § 8.10.090.
  • Uniform Code for the Abatement of Dangerous Buildings, 1997 edition (International Conference of Building Officials), adopted per Municipal Code § 8.10.100.
  • All technical codes above are adopted by reference except where they conflict with Utah Code Title 15A and the technical codes adopted therein (the statewide framework), per Municipal Code § 8.10.010.F.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
0units

0 buildings · $0 valuation

Trailing 12 months
284units

12 of 12 months reported · #26 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
0units

0 buildings · $0 valuation

5 month(s) reported to Census

Full year 2025
292units

38 buildings · $98.9M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • South Salt Lake commits to a 15-business-day review of complete building permit applications, with comments emailed to the applicant contact; applications expire after 180 days, per the city's official Building Permits page and FAQ — this is one of the few UT jurisdictions in this dataset with a published, verified plan-review turnaround figure.
  • The city runs a dual fee structure: most new construction/additions/remodels use a valuation-based Building Permit Fee formula (Building Fee x local multiplier from ICC Building Valuation Data, plus a 65% Plan Check Fee and 1% State Surcharge), while many common trade replacements and simple projects (fences, reroofs, demolition, signs, AC/furnace/water-heater swaps) use flat 'over the counter' fees instead, per Consolidated Fee Schedule § 3.11.040.A.
  • Fence permits are only required for masonry fences (any height) or fences over 6 feet (any material) — a wood fence under 6 feet needs no permit at all, per the official Building Permits FAQ. Height caps per Municipal Code § 17.07.060.E (confirmed live 2026-07-23): front yards 4 feet, corner side yards 6 feet, rear yards 6 feet — there is no code provision for an 8-foot fence in any yard.
  • ADUs require a 4-step approval chain — Predevelopment Application, evidence of owner-occupancy, Building Permit, and (if rented) Rental Business License — plus impact/utility-connection fees, and are capped at one Internal + one External ADU per lot with mandatory owner-occupancy and a Short-Term Rental ban, per Municipal Code § 17.04.030.B and the city's official ADU Handbook.
  • Starting construction before permit issuance triggers an additional fee equal to 100% of the Building Fee on top of the normal permit cost, separate from any citation or criminal-penalty exposure, per the Consolidated Fee Schedule and the Building Permits FAQ.
  • Right-of-Way, Demolition, and Sign Permits are routed through a dedicated ext. 3 contact line distinct from the main Building Permits desk, per the official staff directory.
  • South Salt Lake's adopted code stack is a mix of vintages — a 2012 IBC Appendix J amendment and a 2006 IRC Appendix P adoption sit alongside the general 'as adopted by the State of Utah' IBC/IRC/IMC/IPC/NEC references — so always confirm current edition specifics against the live State of Utah Title 15A framework rather than assuming a single edition year applies citywide.
  • No jurisdiction-published review-timeline figure was found for the flat-fee 'over the counter' permit types (fence, reroof, demolition, sign, and routine trade replacements) — these may in practice be issued same-day/same-visit, but that is not confirmed in writing, so reviewTimelineDays is honestly left null with a note for each rather than assumed equal to the general 15-business-day complete-application figure.
  • 2026-07-23 full spot-audit: all 18 previously cited sources were re-fetched and were readable. The Consolidated Fee Schedule § 3.11.040 (Building Permit formula, all Over-the-Counter flat fees, all three impact fees including the Culinary Water Impact Fee, Fire Marshal Inspection fees) and Chapter 8.10 code-adoption text were re-checked verbatim against the live Municode page and matched this dataset exactly — no drift found there, and both impact-fee subsections are already codified through their most recent amending ordinances (Ord. No. 2024-11, 7-31-2024 for drinking-water impact fees; Ord. No. 2025-17, 5-28-2025 for wastewater impact fees), so no silently-superseded impact-fee document was found. Two real drifts WERE found and corrected: (1) the fence height table had an unsupported '8 feet in side/rear yards with a permit' figure that does not exist in the live Municipal Code § 17.07.060.E (current code: front 4 ft / corner side 6 ft / rear 6 ft, no side-yard or 8-ft provision), most recently amended by Ord. No. 2025-32 (7-9-2025); (2) Municipal Code § 17.04.030.B was amended by Ordinance No. 2026-12 to remove its ADU numeric development standards (lot size/width/size/height/parking) in favor of a cross-reference to § 17.07.060.I-J, where those standards (unchanged in substance) now live — this dataset's ADU citations were updated accordingly.

Comparable nearby cities

Taylorsville
Both in Salt Lake County11 shared permit types~4 mi away
Compare fees →
Salt Lake City
Both in Salt Lake County11 shared permit types~5 mi away
Compare fees →
West Jordan
Both in Salt Lake County11 shared permit types~9 mi away
Compare fees →