Change of Use / Certificate of Occupancy Permit in Unincorporated Uintah County, Utah
Required for a change in use or occupancy classification of an existing building in unincorporated Uintah County, and covers the Certificate of Occupancy sign-off that closes out any building, commercial, tenant-improvement, or change-of-use permit before the space may be occupied. Uintah County's Fee Schedule (Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1, enacted 8/12/2025) prices two distinct change-of-use scenarios: (1) 'Change in Use of Occupancy' for a previously-approved building, billed at a flat $0.40 per square foot across all occupancies (Building Permit Fees table); and (2) 'Change of use for a non-approved (unconfirmed) building,' billed 'as per new occupancy classification' — i.e., at the applicable per-square-foot rate for the new occupancy type from the same table (Permit Fee by Activity & Flat Fee table), ranging $0.40-$1.25/sq ft depending on classification. No standalone Certificate of Occupancy application fee is separately published; a CO is issued as part of the final inspection sign-off on the underlying permit.
Verified 2026-07-22 · Source
When you need this permit
- Change in use or occupancy classification of an existing, previously-approved commercial or other non-residential building — billed at a flat $0.40/sq ft across all occupancies
- Change of use for a building whose existing use was never officially approved or confirmed by the county — billed 'as per new occupancy classification' at the applicable per-square-foot rate for the new use
- Compliance review for the new use under the currently adopted IBC (2024 IBC per Utah Code § 15A-2-103(1)(a)), including egress, occupant load, and fire separation for the new occupancy
- Final inspection and Certificate of Occupancy issuance before the new use may commence
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Life-Safety / Occupancy Compliance Inspection
County inspector verifies the space meets IBC requirements for the new occupancy classification — egress, occupant load, fire separation — before sign-off.
- 2
Final Inspection / Certificate of Occupancy
All work required by the permit is complete; a Certificate of Occupancy is issued before the new use may commence, consistent with this file's other final-inspection entries.
See the full Unincorporated Uintah County inspection guide — scheduling & re-inspection fees →
Tips
- Uintah County prices a change of use differently depending on whether the building's CURRENT use was ever officially approved: a previously-approved building changing use is a flat $0.40/sq ft across all occupancies, while a building whose existing use was never confirmed by the county is billed 'as per new occupancy classification' — i.e., the full per-square-foot Building Permit Fees rate for the new use (up to $1.25/sq ft for Hazardous/Institutional).
- There is no standalone Certificate of Occupancy application or fee — a CO is issued as the final sign-off on the underlying building, commercial, tenant-improvement, or change-of-use permit once all required inspections pass.
- A change of use that adds plumbing, mechanical, or electrical service to space that previously lacked it triggers the separate flat tiered fee ($150-$400 by square footage) documented in this file's commercial-tenant-improvement-permit entry, in addition to the change-of-use fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Uintah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Uintah County
Change of Use / Certificate of Occupancy Permit in other cities
Compare change of use / certificate of occupancy permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Uintah County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Uintah County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →