EV Charger / EVSE Permit in Unincorporated Uintah County, Utah
Uintah County does not publish a distinct EV charger / EVSE permit type or fee line item. Directly read the complete 'Permit Fee by Activity & Flat Fee' table of the county's official Fee Schedule (Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1, enacted 8/12/2025, Book 1921 Page 869) on 2026-07-20 — it lists 26 specific activity/flat-fee line items (residential electrical service upgrade or replacement, temporary power pedestals, agricultural electrical service, commercial/utility equipment and commercial electrical service, solar, wind/radio towers, cell towers, etc.) and contains no 'EV,' 'electric vehicle,' or 'charging station' line item anywhere in the table. EV charger / EVSE installation is therefore billed as ordinary electrical work under the same Electrical Permit that governs residential electrical service upgrades and replacements.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Uintah County — falls under the county's general Electrical Permit (residential electrical service upgrade/replacement, or commercial/utility electrical service for non-residential installations)
- Completed Electrical, Mechanical and Plumbing Building Permit Application listing the electrical contractor and license number
- Compliance with the 2023 NEC, which remains current statewide per Utah Code § 15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring, boxes, and panel/circuit installed before walls are closed, where applicable.
- 2
Final
Charger installed and operational, GFCI/AFCI protection verified where required, circuit labeled.
See the full Unincorporated Uintah County inspection guide — scheduling & re-inspection fees →
Tips
- Uintah County's Permit Fee by Activity & Flat Fee table has no EV-charger-specific line item — a residential EV charger installation is billed at the same flat $50 fee as any other residential electrical service upgrade or replacement.
- For a commercial property, an EV charger installation falls under the $200 Commercial/Utility Equipment and Commercial Electrical Service flat fee.
- The 2023 National Electrical Code (statewide) governs the installation, even though the county's own Building Code page still lists the 2020 NEC.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Uintah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Uintah County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Uintah County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Uintah County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →