EV Charger / EVSE Permit in Unincorporated Uintah County, Utah

Uintah County does not publish a distinct EV charger / EVSE permit type or fee line item. Directly read the complete 'Permit Fee by Activity & Flat Fee' table of the county's official Fee Schedule (Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1, enacted 8/12/2025, Book 1921 Page 869) on 2026-07-20 — it lists 26 specific activity/flat-fee line items (residential electrical service upgrade or replacement, temporary power pedestals, agricultural electrical service, commercial/utility equipment and commercial electrical service, solar, wind/radio towers, cell towers, etc.) and contains no 'EV,' 'electric vehicle,' or 'charging station' line item anywhere in the table. EV charger / EVSE installation is therefore billed as ordinary electrical work under the same Electrical Permit that governs residential electrical service upgrades and replacements.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Uintah County — falls under the county's general Electrical Permit (residential electrical service upgrade/replacement, or commercial/utility electrical service for non-residential installations)
  • Completed Electrical, Mechanical and Plumbing Building Permit Application listing the electrical contractor and license number
  • Compliance with the 2023 NEC, which remains current statewide per Utah Code § 15A-2-103(1)(g)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential Electrical Service Upgrade or Replacement (applies to residential EV charger/EVSE)Uintah County Fee Schedule, Uintah County Code § 3.30.010 (Ord. 08-06-2025 O1, enacted 8/12/2025, Book 1921 Page 869) — Permit Fee by Activity & Flat Fee table. No distinct EV-charger line item exists in this table (confirmed by directly reading the complete table on 2026-07-20), so a residential EV charger installation is billed under this same flat-fee electrical line item, consistent with this file's existing electrical-permit entry.
$50.00
Commercial/Utility Equipment and Commercial Electrical Service (applies to commercial EV charger/EVSE)Uintah County Fee Schedule, Ord. 08-06-2025 O1, Book 1921 Page 869 — same table; applies to a commercial-property EV charger installation.
$200.00
Inspection/Re-Inspection FeeUintah County Fee Schedule, Ord. 08-06-2025 O1.
$50.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Uintah County building department
~10–14 business days

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Uintah County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, boxes, and panel/circuit installed before walls are closed, where applicable.

  2. 2

    Final

    Charger installed and operational, GFCI/AFCI protection verified where required, circuit labeled.

See the full Unincorporated Uintah County inspection guide — scheduling & re-inspection fees →

Tips

  • Uintah County's Permit Fee by Activity & Flat Fee table has no EV-charger-specific line item — a residential EV charger installation is billed at the same flat $50 fee as any other residential electrical service upgrade or replacement.
  • For a commercial property, an EV charger installation falls under the $200 Commercial/Utility Equipment and Commercial Electrical Service flat fee.
  • The 2023 National Electrical Code (statewide) governs the installation, even though the county's own Building Code page still lists the 2020 NEC.

Frequently asked questions

Unincorporated Uintah County requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Uintah County — falls under the county's general Electrical Permit (residential electrical service upgrade/replacement, or commercial/utility electrical service for non-residential installations); Completed Electrical, Mechanical and Plumbing Building Permit Application listing the electrical contractor and license number; Compliance with the 2023 NEC, which remains current statewide per Utah Code § 15A-2-103(1)(g). If your project isn't listed, confirm with Uintah County Community Development — Building Division at (435) 781-5336 before starting work.

$50 flat fee for a residential installation (same as a residential electrical service upgrade/replacement), or $200 flat fee for a commercial installation, per the Uintah County Fee Schedule (Ord. 08-06-2025 O1, enacted 8/12/2025).

Plan review for an ev charger / evse permit in Unincorporated Uintah County typically runs 10–14 business days. This is an estimate, not a published figure — confirm current review times with Uintah County Community Development — Building Division at (435) 781-5336.

You'll need: Electrical, Mechanical and Plumbing Building Permit Application. Depending on your project, Unincorporated Uintah County may also ask for: Electrical Single-Line Diagram / Plan. See the required-documents checklist on this page for details on each.

Unincorporated Uintah County requires 2 inspection(s) for an ev charger / evse permit, in order: Rough-In, Final. Schedule each through Uintah County Community Development — Building Division ((435) 781-5336).

Apply through Uintah County Community Development — Building Division at 152 East 100 North, Vernal, UT 84078. Phone: (435) 781-5336. Official information: https://www.uintah.gov/departments/a_-_e_departments/community_development/building_permits.php.

Unincorporated Uintah County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Uintah County's own Building Code page (uintah.gov, live-checked 2026-07-16) is UNCHANGED and still states '2021 International Building Codes Effective July 1, 2023' — the county page has not been updated for either the 2021→2023 language it already had wrong stylistically or the 2024 statewide edition now in force; the statute governs.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on Uintah County's own Building Code page, added here per statute.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here.; 2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition previously listed here.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition previously listed here. Uintah County's FAQ page ('Do I need a permit for my building? It's portable on a skid?' article, live-checked 2026-07-16) is UNCHANGED and still cites 'Chapter 14 of the 2018 International Existing Building Code (IEBC)' and '2018 International Building Code (IBC)' / '2015 International Residential Code (IRC)' / 'IRC 2015 or IBC 2018' for relocated/moved structures — this is now a much larger lag (2015/2018 editions vs. the current 2024/2021 statewide editions) than previously flagged; the FAQ page's separate 'When are building permits required' article also still cites 'IBC 2015 & IRC 2015' verbatim. The statute governs; Uintah County's FAQ page has not been updated to reflect any statewide code cycle since at least 2015/2018.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition previously listed here.; 2023 National Electrical Code (NEC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition. Uintah County's Building Code Information page (live-checked 2026-07-16) is UNCHANGED and still lists '2020 National Electrical Code (NEC) Effective July 1, 2021' — that page remains not updated; the statewide 2023 NEC is the legally in-force edition per the statute.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification — the flip anticipated by this file's prior 'Effective July 1, 2026' note has now occurred and is confirmed live. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Uintah County's own Building Code page and FAQ page were both live-checked 2026-07-16 and remain unchanged/stale exactly as previously found (in the FAQ's case, considerably staler than previously documented — see the IEBC entry above) — the statute is cited directly as governing throughout, per this file's established recovery-avenue policy.. Local amendments apply — see the Unincorporated Uintah County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Uintah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.