Commercial Tenant Improvement / Tenant Finish Permit in Unincorporated Uintah County, Utah

Required for tenant improvement / tenant finish work inside an existing commercial building in unincorporated Uintah County — the interior build-out that follows a 'Shell Only' permit, or a remodel/change of use of existing commercial space. Uintah County's Building Permit Fees table separately prices a 'Shell Only (prior to tenant build-out)' rate of $0.35/sq ft for all occupancies, a general 'Remodeling' rate of $0.40/sq ft (minimum fee $200) for all occupancies, a 'Change in Use of Occupancy' rate of $0.40/sq ft, and — where plumbing, mechanical, or electrical is being added to a building that previously lacked those systems — a flat tiered fee ($150 for 0-1,499 sq ft, $300 for 1,500-4,999 sq ft, $400 for 5,000+ sq ft).

Verified 2026-07-19 · Source

When you need this permit

  • Tenant improvement / tenant finish build-out of previously shelled commercial space, remodel of existing commercial space, or change of use/occupancy
  • Two complete, legible, to-scale sets of building plans (minimum 11x17), designed to the currently adopted IBC
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
  • For scope adding plumbing, mechanical, or electrical to space that previously lacked such facilities: plans showing the new systems

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Shell Only (prior to tenant build-out), All Occupancies — per square foot
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16. This is the Occupancy Type 'All Occupancies / Shell Only (prior to tenant build-out) / $0.35' row.
$0.35 per sq ft
Remodeling, All Occupancies — per square foot
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16. Occupancy Type 'All Occupancies / Remodeling / $0.40 (Min. fee $200)' row.
$0.40 per sq ft (Minimum fee $200)
Change in Use of Occupancy, All Occupancies — per square foot
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16. Occupancy Type 'All Occupancies / Change in Use of Occupancy / $0.40' row.
$0.40 per sq ft
Finishing or Unfinished Basements, All Occupancies
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16. Occupancy Type 'All Occupancies / Finishing or Unfinished Basements / Difference between multipliers' row.
Difference between multipliers
Adding Plumbing, Mechanical or Electrical to a Building Without Such Facilities
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16. 'Permit Fee by Activity & Flat Fee' table.
$150 (0-1,499 sq ft); $300 (1,500-4,999 sq ft); $400 (5,000 sq ft and over)
Minimum Building Permit Fee
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16.
$50.00
Plan Check Fee
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16, 'Review of Plans' table.
Up to 65% of the building permit fee
Remodel Fire Review
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16. 'Fire District Fees,' Commercial Fire Review/Inspection table: 'Remodel Fire Review — $70.00.'
$70.00
Remodel Fire Inspection
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16. 'Fire District Fees,' Commercial Fire Review/Inspection table: 'Remodel Fire Inspection — $60.00.'
$60.00
Re-Inspection Fee
Uintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. Show full citationUintah County Fee Schedule — Uintah County Code § 3.30.010, Ordinance No. 08-06-2025 O1 (recorded Entry 2025004950, Book 1921, Pages 865-880, enacted 8/12/2025) — 'Community Development Fee Schedule,' Building Permit Fees (occupancy-classification table) and Fire District Fees sections, pages 4-5 of 16.
$50.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Uintah County building department
~10–14 business days

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Unincorporated Uintah County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In (Framing/Electrical/Plumbing/Mechanical)

    Scope-dependent rough-in inspection of new interior partitions, wiring, piping, or ductwork before walls are closed.

  2. 2

    Remodel Fire Review / Inspection

    For occupancies requiring fire suppression or alarm review on remodel scope, per the county's Fire District Fees schedule ($70 review, $60 inspection).

  3. 3

    Energy Efficiency (Insulation) Inspection

    Where the scope affects building envelope insulation or mechanical/water-heating efficiency.

  4. 4

    Final Inspection

    All work required by the building permit is complete; a Certificate of Occupancy or occupancy sign-off is required before the space may be used.

See the full Unincorporated Uintah County inspection guide — scheduling & re-inspection fees →

Tips

  • A commercial shell building is permitted separately at $0.35/sq ft ('Shell Only, prior to tenant build-out'); the subsequent tenant build-out is then priced as either 'Remodeling' ($0.40/sq ft, $200 minimum) or under the applicable occupancy classification rate, depending on scope — confirm which applies with the Building Official.
  • If the tenant space previously had no plumbing, mechanical, or electrical service, adding those systems is a flat tiered fee ($150-$400 by square footage) rather than the per-square-foot Remodeling rate.
  • Remodel-scope commercial work incurs its own, lower Fire District Fees ($70 review + $60 inspection) compared to new construction ($90 review + $80 inspection).

Frequently asked questions

Unincorporated Uintah County requires a commercial tenant improvement / tenant finish permit for: Tenant improvement / tenant finish build-out of previously shelled commercial space, remodel of existing commercial space, or change of use/occupancy; Two complete, legible, to-scale sets of building plans (minimum 11x17), designed to the currently adopted IBC; Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures); For scope adding plumbing, mechanical, or electrical to space that previously lacked such facilities: plans showing the new systems. If your project isn't listed, confirm with Uintah County Community Development — Building Division at (435) 781-5336 before starting work.

General remodeling of existing commercial space is $0.40 per square foot with a $200 minimum fee; a 'Shell Only' permit prior to tenant build-out is $0.35 per square foot; change of occupancy use is $0.40 per square foot. Adding plumbing, mechanical, or electrical service to space that lacked it is a flat tiered fee ($150-$400 by size). A plan check fee of up to 65% of the building permit fee also applies. Source: Uintah County Fee Schedule, Ordinance No. 08-06-2025 O1 (enacted 8/12/2025).

Plan review for a commercial tenant improvement / tenant finish permit in Unincorporated Uintah County typically runs 10–14 business days. This is an estimate, not a published figure — confirm current review times with Uintah County Community Development — Building Division at (435) 781-5336.

You'll need: Commercial Tenant Improvement / Remodel Building Permit Application; Two Complete Sets of Building Plans, Stamped by a Utah Licensed Architect or Engineer (where scope requires); Proof of Ownership or Tenant Authorization. See the required-documents checklist on this page for details on each.

Yes. Remodel Fire Review is $70.00 and Remodel Fire Inspection is $60.00, compared to $90.00 and $80.00 respectively for new commercial construction, per the county's Fire District Fees schedule.

Apply through Uintah County Community Development — Building Division at 152 East 100 North, Vernal, UT 84078. Phone: (435) 781-5336. Official information: https://www.uintah.gov/departments/a_-_e_departments/community_development/building_permits.php.

Unincorporated Uintah County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition. Uintah County's own Building Code page (uintah.gov) still states '2021 International Building Codes Effective July 1, 2023' — the county page has not been updated for the 2024 statewide edition now in force; the statute governs.; 2021 International Residential Code (IRC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on Uintah County's own Building Code page, added here per statute.; 2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition.; 2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition.; 2024 International Fuel Gas Code (IFGC) — current statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition — current statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition.; 2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); this supersedes the 2021 edition. Uintah County's FAQ page ('Do I need a permit for my building? It's portable on a skid?' article) still cites 'Chapter 14 of the 2018 International Existing Building Code (IEBC)' and '2018 International Building Code (IBC)' / '2015 International Residential Code (IRC)' / 'IRC 2015 or IBC 2018' for relocated/moved structures — a substantial lag (2015/2018 editions vs. the current 2024/2021 statewide editions); the FAQ page's separate 'When are building permits required' article also still cites 'IBC 2015 & IRC 2015' verbatim. The statute governs; Uintah County's FAQ page has not been updated to reflect any statewide code cycle since at least 2015/2018.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(n); supersedes the 2021 edition.; 2023 National Electrical Code (NEC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition. Uintah County's Building Code Information page is UNCHANGED and still lists '2020 National Electrical Code (NEC) Effective July 1, 2021' — that page remains not updated; the statewide 2023 NEC is the legally in-force edition per the statute.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification — the flip anticipated by the prior 'Effective July 1, 2026' note has now occurred and is confirmed live. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Uintah County's own Building Code page and FAQ page were both live-checked 2026-07-16 and remain unchanged/stale exactly as previously found (in the FAQ's case, considerably staler than previously documented — see the IEBC entry above) — the statute is cited directly as governing throughout, per the established recovery-avenue policy.. Local amendments apply — see the Unincorporated Uintah County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Uintah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Uintah County.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.

Property Access

Unincorporated Uintah County's permit history is searchable by address

3,137 permits on record for Unincorporated Uintah County, 2019–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.

98% of Unincorporated Uintah County's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.

Start your 7-day free trial7 days free for new customers, then $79/mo · the guide above stays free