Roofing Permit in Orem, Utah

Required for full roof replacement (tear-off and re-roof) and new roof installations. Like-for-like shingle-over-shingle repairs on small areas may not require a permit — contact the Building Safety Division to confirm. Valuation is based on ICC BVT or cost of materials and labor.

Verified 2026-07-16 · Source

When you need this permit

  • Online account at utah.cityinspect.com
  • Permit application submitted electronically with scope of roofing work and materials
  • Total square footage and number of layers being removed

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Roofing Permit (valuation-based, Table 3A)Valuation-based fee, assessed per Table 3A on ICC BVT project valuation — same tier schedule as the standard building permit (see residential-building-permit permit type for full tier breakdown). Re-verified 2026-07-01: live Orem City FY 2025-2026 Adopted Budget (orem.gov, p. 204) confirms all building permit types (including re-roofing, a structural building-permit scope) are assessed 'Table 3A, 1997 Uniform Administrative Code (UAC) w/2023 revisions' on BVT valuation; no separate flat re-roofing fee is published because roofing is not a distinct fee category — it is billed as a standard building permit.
Based on ICC BVT valuation — see building permit fee table (Table 3A, 1997 UAC w/2023 revisions)
Plan ReviewOrem City FY 2025-2026 Adopted Budget, Building Safety Plan Review (p. 205).
Lesser of 65% of permit fee or actual cost

Review timeline

Plan reviewTypical estimate — confirm current times with the Orem building department
~3–10 business days

How long did your Roofing Permit permit actually take in Orem?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Roofing

    Completed roof installation including flashing, valleys, and penetrations

See the full Orem inspection guide — scheduling & re-inspection fees →

Tips

  • Confirm with the Building Safety Division whether your roofing project requires a permit — small repairs may be exempt.
  • All submittals must be done online; the city does not accept walk-in applications.

Frequently asked questions

Yes. A complete tear-off and re-roof requires a building permit in Orem. Contact the Building Safety Division at (801) 229-7198 for questions about smaller repairs.

In Orem, the published Roofing Permit (valuation-based, Table 3A) is: Based on ICC BVT valuation — see building permit fee table (Table 3A, 1997 UAC w/2023 revisions). Additional published fees: Plan Review — Lesser of 65% of permit fee or actual cost. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a roofing permit in Orem typically runs 3–10 business days. This is an estimate, not a published figure — confirm current review times with Building Safety Division at (801) 229-7198.

You'll need: Permit Application. See the required-documents checklist on this page for details on each.

Orem requires 1 inspection(s) for a roofing permit, in order: Final Roofing. Schedule each through Building Safety Division ((801) 229-7198).

Apply through Building Safety Division at 56 North State St., 2nd Floor, Orem, UT 84057. Phone: (801) 229-7198, email: help@orem.gov. Office hours: Monday–Friday, 8:00 AM–5:00 PM. Official information: https://orem.gov/buildingpermits/.

Orem, Utah has adopted: 2021 International Residential Code (IRC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)); 2024 International Building Code (IBC), including Appendices C and J — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect July 1, 2025 – June 30, 2026 (Utah Code § 15A-2-103(1)(a)); 2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect July 1, 2025 – June 30, 2026 (Utah Code § 15A-2-103(1)(e)); 2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect July 1, 2025 – June 30, 2026 (Utah Code § 15A-2-103(1)(d)); 2021 International Fire Code (IFC) — effective July 1, 2025 (not adopted under Utah Code § 15A-2-103, which does not list an IFC edition; edition unconfirmed for the current period); 2023 National Electrical Code (NEC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(g)); 2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect July 1, 2025 – June 30, 2026 (Utah Code § 15A-2-103(1)(f)); 2024 International Energy Conservation Code (IECC) — currently in effect as of July 1, 2026, superseding the 2021 IECC that was in effect July 1, 2025 – June 30, 2026 (Utah Code § 15A-2-103(1)(h)); Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — currently in effect as of July 1, 2026, superseding the 2021 ISPSC that was in effect July 1, 2025 – June 30, 2026 (Utah Code § 15A-2-103(1)(n)); 2006 Uniform Wildlife Conservation Code (UWUIC); 2009 ANSI A117.1 Accessible and Usable Buildings and Facilities. Local amendments apply — see the Orem overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Orem building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.