Electrical Permit — Orem, Utah · Requirements sheet
Verified 2026-07-16 · Source: https://orem.gov/buildingpermits/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electrical Permit in Orem, Utah
Required for new electrical installations, panel upgrades, circuit additions, wiring for additions or remodels, and any work involving the electrical system. All submittals online via CityInspect portal. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit — Orem's FY 2025-2026 Adopted Budget fee schedule does not publish a separate EV-specific fee line item; the standard Table 3B fixture/circuit-based fee applies.
Verified 2026-07-16 · Source
When you need this permit
- Online account at utah.cityinspect.com
- Permit application submitted electronically with description of work and fixture/circuit counts
- Licensed electrical contractor required for commercial work; owner-builder allowed for primary residence Owner-builder
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Valuation/fixture-based fee. The Orem City FY 2025-2026 Adopted Budget (orem.gov, p. Show full citationHide
Valuation/fixture-based fee. The Orem City FY 2025-2026 Adopted Budget (orem.gov, p. 204) lists 'Electrical Only Permit — $40 Base Fee + as applicable from Table 3B, 1997 UAC w/2023 revisions.' Table 3B fees are calculated based on number and type of electrical fixtures, circuits, and services.Review timeline
Inspection process
- 1
Rough-in Electrical
Before walls are closed; inspect wiring, junction boxes, grounding
- 2
Final Electrical
All electrical work complete including fixtures, panels, and connections
See the full Orem inspection guide — scheduling & re-inspection fees →
Tips
- Electrical permits are required even when work is part of a larger building permit — each trade is permitted separately unless combined in a single building permit application.
- Solar PV and EV charger installations require a separate electrical permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-16.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Orem building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Orem's permit history is searchable by address
26,615 permits in our copy of Orem's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Orem has issued.
26,519 of these 26,615 permits — 99.6% — carry an issued date, and those run from 2002 to 2026. The remaining 96 have no date at all.
Other permits in Orem
Electrical Permit in other cities
Compare electrical permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Orem project checklist
Describe your project once and get every permit, document, and fee it triggers in Orem — in one checklist. Free, for any city and any number of projects.
Get started →