Residential Building Permit in Orem, Utah
Required for new residential construction, additions, and structural alterations in Orem.
Verified 2026-06-27 · Source
When you need this permit
- Project valuation over $500
- New construction or structural modification
- Changes to electrical, plumbing, or mechanical systems
Required documents
- Req
Building Plans
Complete construction drawings to scale (floor plans, elevations, sections, structural details). Most Utah jurisdictions now require a single PDF set uploaded through their online permit portal.
- Req
Site Plan
Property survey showing setbacks and building footprint
- Req
Energy Compliance
REScheck or equivalent energy calculation
- Req
Engineered Truss Plans
Sealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit (valuation-based) | $86 (up to $1,300); $86 + $3/each $100 over $1,300 (to $2,000); $107 + $11/each $1,000 over $2,000 (to $40,000); $525 + $9/each $1,000 over $40,000 (to $100,000); $1,065 + $7/each $1,000 over $100,000 (to $500,000); $3,865 + $5/each $1,000 over $500,000 (to $1,000,000); $20,354 + $2/each $1,000 over $5,000,000 | — |
| Residential Plan Review | 65% of building permit fee | — |
| Simple/Duplicate Plan Review | 25% of building permit fee | — |
| Re-Inspection | $75 per hour | — |
| After-Hours Inspection | $75 per hour (2-hour minimum) | — |
| State Surcharge | 1% of permit fee | — |
Review timeline
~10–21 business days
Typical estimate — confirm current times with the Orem building department
Inspection process
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
Tips
- Orem requires full online submittal for building permits through their Development Services portal.
- Schedule inspections by calling (801) 229-7198.
- All plans must be submitted digitally — paper submissions are not accepted.
Frequently asked questions
- How do I apply for a residential building permit in Orem?
- Orem requires all building permit applications to be submitted online through their Development Services portal. Paper submissions are not accepted. Contact (801) 229-7060 for assistance.
- How long does permit review take in Orem?
- Orem does not publish a fixed plan-review turnaround. Across Utah jurisdictions, residential plan review typically runs about 2-4 weeks, but times vary with project scope and department workload — confirm current timelines with the Orem building department before you submit.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
- Orem City Building Safety Division — official building department
- Orem City Consolidated Fee Schedule
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Orem building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Orem
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.