Saratoga Springs' Planning Department requires a Change of Use Permit under Land Development Code § 19.13.06 whenever an existing structure or site converts from its current or previous use to a different or new activity that falls under a different use category in the Chapter 19.04 use tables. This is a Planning-level staff review process (with Planning Director sign-off, per § 19.13.06(4)), distinct from a Building Department 'Certificate of Occupancy' — the city's Consolidated Fee Schedule and Land Development Code contain no standalone 'Certificate of Occupancy' permit or fee line item; occupancy is instead certified as the final inspection step within the city's building permit process (see the 'Final / Certificate of Occupancy' inspection on this jurisdiction's residential and commercial building permit entries). If the new use requires physical/site changes (e.g., increased parking, exterior alterations), a separate site plan amendment is also required.

Verified 2026-07-22 · Source

When you need this permit

  • The proposed new use must be a permitted use in the applicable zone per the Chapter 19.04 use tables — a use not listed as permitted in the zone is not eligible for a Change of Use Permit, per LDC § 19.13.06(3)(d)
  • Signage and parking for the new use must comply with all standards in place at the time of conversion, per LDC § 19.13.06(3)(b)
  • If the existing use is a legal nonconforming use, a new use with the same or lower parking requirement may convert without additional conditions; a new use with a higher parking requirement must meet the increased parking standard, per LDC § 19.13.06(3)(b)(i)
  • Increased parking requirements or external changes to the site or structure required by the new use trigger a separate site plan amendment, per LDC § 19.13.06(3)(c)
  • Application and all required documents submitted via the CityWorks Public Portal (cityworks.saratogasprings-ut.gov/publicaccess), Planning category

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Change of Use Permit Review Fee
Saratoga Springs 'Change of Use Application Requirements' document (Revised 2.3.2026): 'REVIEW FEES: $250... Show full citationSaratoga Springs 'Change of Use Application Requirements' document (Revised 2.3.2026): 'REVIEW FEES: $250... (Includes 2 reviews; additional reviews $100 each).' Independently cross-verified in the city's Consolidated Fee Schedule (saratogasprings-ut.gov/DocumentCenter/View/131), Community Development / Calculated Fees section, page 17: 'Change of Use Permit — $250, Staff Reviews – 2, [additional] $100.'
$250.00 (includes 2 staff reviews)
Additional Review Fee (beyond the 2 included staff reviews)Change of Use Application Requirements (Revised 2.3.2026) and Consolidated Fee Schedule, Community Development / Calculated Fees section, both list $100 per additional staff review beyond the 2 included in the base $250 fee.
$100 per additional review

Review timeline

Plan reviewSaratoga Springs’s published plan-review target
10–12 business days

How long did your Change of Use Permit permit actually take in Saratoga Springs?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Saratoga Springs inspection guide — scheduling & re-inspection fees →

    Tips

    • There is no standalone 'Certificate of Occupancy' permit or fee in Saratoga Springs — occupancy sign-off happens as the final inspection within the Building Department's building permit process, not as a separate Planning product.
    • A Change of Use Permit only covers the use conversion itself; if the new use requires more parking or any exterior/site changes, a separate site plan amendment is also required per LDC § 19.13.06(3)(c).
    • The $250 review fee includes 2 staff reviews; a Comment Review Meeting (CRM) can be requested after comments are sent, and additional reviews beyond the included 2 cost $100 each.
    • A use that does not fall under a permitted use in the Chapter 19.04 use tables for the applicable zone is not eligible for a Change of Use Permit — confirm zoning eligibility with the Planning Department before applying.
    • Submit through the CityWorks Public Portal (cityworks.saratogasprings-ut.gov/publicaccess), Planning category, Change of Use application type; contact Planning at 801-766-9793 ext. 155 or Planning@SaratogaSprings-UT.gov with questions.

    Frequently asked questions

    Saratoga Springs requires a change of use permit for: The proposed new use must be a permitted use in the applicable zone per the Chapter 19.04 use tables — a use not listed as permitted in the zone is not eligible for a Change of Use Permit, per LDC § 19.13.06(3)(d); Signage and parking for the new use must comply with all standards in place at the time of conversion, per LDC § 19.13.06(3)(b); If the existing use is a legal nonconforming use, a new use with the same or lower parking requirement may convert without additional conditions; a new use with a higher parking requirement must meet the increased parking standard, per LDC § 19.13.06(3)(b)(i); Increased parking requirements or external changes to the site or structure required by the new use trigger a separate site plan amendment, per LDC § 19.13.06(3)(c); Application and all required documents submitted via the CityWorks Public Portal (cityworks.saratogasprings-ut.gov/publicaccess), Planning category. If your project isn't listed, confirm with City of Saratoga Springs Building Department (Community Development) at (801) 766-6507 before starting work.

    $250.00, which includes 2 staff reviews; additional reviews beyond that are $100 each, per the city's Change of Use Application Requirements and Consolidated Fee Schedule.

    The city states the first round of comments is anticipated within 10-12 business days after the application is routed to staff following fee payment; large or complex projects may take longer, with the City notifying the applicant of any extended review period.

    You'll need: Change of Use Application & Checklist; Acknowledgement & Certification. Depending on your project, Saratoga Springs may also ask for: Parking Requirement Documentation. See the required-documents checklist on this page for details on each.

    Apply through City of Saratoga Springs Building Department (Community Development) at 319 S Saratoga Rd, Saratoga Springs, UT 84045. Phone: (801) 766-6507, email: BuildingApps@saratogaspringscity.com. Office hours: Mon–Thu 7:00 AM – 6:00 PM; Fri 8:00 AM – 5:00 PM (limited inspections on Fridays). Official information: https://www.saratogasprings-ut.gov/201/Building.

    Saratoga Springs, Utah has adopted: GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). Saratoga Springs' 'Current Versions of the Codes Utilized for Inspections' list (saratogasprings-ut.gov/201/Building) still displays the pre-7/1/2026 edition list for every code except NEC; State law governs regardless of the page's lag; each line below states current law first, then the page's as-published (stale) text.; 2024 International Building Code (IBC), with Utah state amendments — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Saratoga Springs' Building Department page still lists '2021 Edition of the International Building Code (IBC)' (live re-check 2026-07-16).; 2021 International Residential Code (IRC), with Utah state amendments, plus Appendix AQ of the 2021 IRC — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches Saratoga Springs' Building Department page, which lists '2021 Edition of the International Residential Code (IRC)' (live re-check 2026-07-16).; 2024 International Plumbing Code (IPC), with Utah state amendments — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Saratoga Springs' page still lists '2021 Edition of the International Plumbing Code (IPC)' (live re-check 2026-07-16).; 2024 International Mechanical Code (IMC), with Utah state amendments — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Saratoga Springs' page still lists '2021 Edition of the International Mechanical Code (IMC)' (live re-check 2026-07-16).; 2024 International Fuel Gas Code (IFGC), with Utah state amendments — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Saratoga Springs' page still lists '2021 Edition of the International Fuel Gas Code (IFGC)' (live re-check 2026-07-16).; 2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split), with Utah state amendments — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Saratoga Springs' Building Department page still lists '2021 Edition of the International Energy Conservation Code (IECC)' (live re-check 2026-07-16). SEPARATELY, and unrelated to the 2026 flip: the city's Additional Building Permit Requirements page (saratogasprings-ut.gov/221) specifies energy compliance via '2015 Utah REScheck' for residential and ComCheck for commercial — this REScheck vintage reference is a PRE-EXISTING stale citation (predates the 2026 flip) relative to even the prior 2021 IECC citation on the Building Department page; both are reproduced here as independently published by the city, not corrected.; 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Not mentioned on Saratoga Springs' Building Department page, Obtaining a Building Permit page, or Consolidated Fee Schedule as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Not mentioned on any Saratoga Springs source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.; Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned on any Saratoga Springs source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.; 2021 International Fire Code (IFC) — per Saratoga Springs Building Department page (live re-check 2026-07-16, unchanged). NOTE: Utah Code § 15A-2-103 does NOT adopt the IFC — the IFC is separately governed under Title 15A Chapter 5, outside the scope of this section. Saratoga Springs' own listing of an IFC edition alongside its § 15A-2-103 code list is therefore not itself governed by § 15A-2-103; reproduced here as the city's own published statement, not corrected or reclassified.; 2023 National Electrical Code (NEC) — per Saratoga Springs Building Department page, consistent with Utah Code § 15A-2-103(1)(g) statewide adoption; this edition did NOT change in the 7/1/2026 flip and Saratoga Springs' page already correctly reflects it (live re-check 2026-07-16) — no correction needed here.; Utah Code Title 15A (State Construction and Fire Codes Act) governs statewide code adoption; as an incorporated Utah city, Saratoga Springs administers its own Building Department as a compliance agency under Utah Code § 15A-1-202.. Local amendments apply — see the Saratoga Springs overview page for the full list.

    No. The city's Consolidated Fee Schedule and Land Development Code contain no standalone Certificate of Occupancy permit or fee; occupancy is certified as the final inspection step of the Building Department's building permit process. A separate Change of Use Permit (Planning Department, LDC § 19.13.06) is required when an existing structure or site converts to a new use category, regardless of whether a building permit is also needed.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-22.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Saratoga Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Saratoga Springs's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Saratoga Springs yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Saratoga Springs lands. Privacy.