EV Charger / EVSE Permit in Saratoga Springs, Utah

Saratoga Springs City's Consolidated Fee Schedule has no distinct "EV Charger" or "EVSE" line item — confirmed via a full-text search of the entire document. EV charger/EVSE installation falls under the city's standard Electrical Permit process: a $22.00 Issuance of Electrical Permit Fee (not charged when the electrical permit is issued together with a building permit), plus a 25% Plan Review Fee and 1% State of Utah Inspector Training Fee. The city's separate EVSE Charging Stations page describes only its own public charging stations ($1.00/hour usage rate) and does not address private installation permitting.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Saratoga Springs
  • Work performed per Saratoga Springs' adopted electrical code

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Issuance of Electrical Permit FeeSaratoga Springs Consolidated Fee Schedule (Res. R21-46, 7-6-21), Building — Electrical Permit Fees: "Issuance of each Electrical Permit Fee — $22.00/each." Not charged when the electrical permit is issued in conjunction with a building permit. No distinct EV Charger or EVSE fee category exists anywhere in the schedule (confirmed via full-text search).
$22.00 each
Plan Review FeeSaratoga Springs Consolidated Fee Schedule, Other Inspection Fees.
25% of the electrical permit fee
State of Utah Inspector Training FeeSaratoga Springs Consolidated Fee Schedule, Other Inspection Fees.
1% of permit fee

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Saratoga Springs?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Inspection of the charger circuit, panel, and grounding by Saratoga Springs City.

See the full Saratoga Springs inspection guide — scheduling & re-inspection fees →

Tips

  • Saratoga Springs has no separate EV Charger fee category — file under the standard Electrical Permit ($22.00 issuance fee, waived if bundled with a building permit).
  • Don't confuse the city's public EVSE Charging Stations page (describing its own $1.00/hour public chargers) with private installation permitting — that page does not cover permits.

Frequently asked questions

Saratoga Springs requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Saratoga Springs; Work performed per Saratoga Springs' adopted electrical code. If your project isn't listed, confirm with City of Saratoga Springs Building Department (Community Development) at (801) 766-6507 before starting work.

No. Saratoga Springs has no distinct EV Charger fee category; EVSE installation is billed under the standard $22.00 Electrical Permit issuance fee, plus a 25% Plan Review Fee, unless the electrical work is bundled into a building permit.

Saratoga Springs does not publish a plan-review timeline for this permit. Contact City of Saratoga Springs Building Department (Community Development) at (801) 766-6507 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Saratoga Springs requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical Inspection. Schedule each through City of Saratoga Springs Building Department (Community Development) ((801) 766-6507).

Apply through City of Saratoga Springs Building Department (Community Development) at 319 S Saratoga Rd, Saratoga Springs, UT 84045. Phone: (801) 766-6507, email: BuildingApps@saratogaspringscity.com. Office hours: Mon–Thu 7:00 AM – 6:00 PM; Fri 8:00 AM – 5:00 PM (limited inspections on Fridays). Official information: https://www.saratogasprings-ut.gov/201/Building.

Saratoga Springs, Utah has adopted: GOVERNING LAW: Utah Code § 15A-2-103 (le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html), version effective 7/1/2026 (amended by Ch. 47, 2026 General Session), sets the statewide-mandatory construction code suite (Utah Code § 15A-1-204 — binds every municipality; local amendments permitted, a different edition is not). Saratoga Springs' 'Current Versions of the Codes Utilized for Inspections' list (saratogasprings-ut.gov/201/Building) still displays the pre-7/1/2026 edition list for every code except NEC; re-checked live 2026-07-16, page text is byte-identical to the earlier fetch. State law governs regardless of the page's lag; each line below states current law first, then the page's as-published (stale) text.; 2024 International Building Code (IBC), with Utah state amendments — per Utah Code § 15A-2-103(1)(a), effective 7/1/2026. Saratoga Springs' Building Department page still lists '2021 Edition of the International Building Code (IBC)' (live re-check 2026-07-16).; 2021 International Residential Code (IRC), with Utah state amendments, plus Appendix AQ of the 2021 IRC — per Utah Code § 15A-2-103(1)(b)/(c); this edition did NOT change in the 7/1/2026 flip. Matches Saratoga Springs' Building Department page, which lists '2021 Edition of the International Residential Code (IRC)' (live re-check 2026-07-16).; 2024 International Plumbing Code (IPC), with Utah state amendments — per Utah Code § 15A-2-103(1)(d), effective 7/1/2026. Saratoga Springs' page still lists '2021 Edition of the International Plumbing Code (IPC)' (live re-check 2026-07-16).; 2024 International Mechanical Code (IMC), with Utah state amendments — per Utah Code § 15A-2-103(1)(e), effective 7/1/2026. Saratoga Springs' page still lists '2021 Edition of the International Mechanical Code (IMC)' (live re-check 2026-07-16).; 2024 International Fuel Gas Code (IFGC), with Utah state amendments — per Utah Code § 15A-2-103(1)(f), effective 7/1/2026. Saratoga Springs' page still lists '2021 Edition of the International Fuel Gas Code (IFGC)' (live re-check 2026-07-16).; 2024 International Energy Conservation Code (IECC), one statewide edition (no residential/commercial split), with Utah state amendments — per Utah Code § 15A-2-103(1)(h), effective 7/1/2026. Saratoga Springs' Building Department page still lists '2021 Edition of the International Energy Conservation Code (IECC)' (live re-check 2026-07-16). SEPARATELY, and unrelated to the 2026 flip: the city's Additional Building Permit Requirements page (saratogasprings-ut.gov/221) specifies energy compliance via '2015 Utah REScheck' for residential and ComCheck for commercial — this REScheck vintage reference is a PRE-EXISTING stale citation (predates the 2026 flip) relative to even the prior 2021 IECC citation on the Building Department page; both are reproduced here as independently published by the city, not corrected.; 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective 7/1/2026. Not mentioned on Saratoga Springs' Building Department page, Obtaining a Building Permit page, or Consolidated Fee Schedule as of live re-check 2026-07-16; added here as a statute-sourced omission (applies statewide regardless of city publication), not fabricated.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective 7/1/2026. Not mentioned on any Saratoga Springs source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.; Modular Building Institute (MBI) Standards 1200 and 1205 — per Utah Code § 15A-2-103(1)(o), statewide-mandated for modular units. Not mentioned on any Saratoga Springs source reviewed as of live re-check 2026-07-16; added as a statute-sourced omission.; 2021 International Fire Code (IFC) — per Saratoga Springs Building Department page (live re-check 2026-07-16, unchanged). NOTE: Utah Code § 15A-2-103 does NOT adopt the IFC — the IFC is separately governed under Title 15A Chapter 5, outside the scope of this section. Saratoga Springs' own listing of an IFC edition alongside its § 15A-2-103 code list is therefore not itself governed by § 15A-2-103; reproduced here as the city's own published statement, not corrected or reclassified.; 2023 National Electrical Code (NEC) — per Saratoga Springs Building Department page, consistent with Utah Code § 15A-2-103(1)(g) statewide adoption; this edition did NOT change in the 7/1/2026 flip and Saratoga Springs' page already correctly reflects it (live re-check 2026-07-16) — no correction needed here.; Utah Code Title 15A (State Construction and Fire Codes Act) governs statewide code adoption; as an incorporated Utah city, Saratoga Springs administers its own Building Department as a compliance agency under Utah Code § 15A-1-202.. Local amendments apply — see the Saratoga Springs overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Saratoga Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.