Sign Permit in Peoria, Arizona
A sign permit is required for new or modified signage in Peoria. The permit includes a plan review fee due at time of application and separate sign area and inspection fees calculated by staff during review. Sign permits are issued through the Planning Division. Illuminated building-mounted wall signs and freestanding monument signs require a planning inspection. A planning inspection for all sign types requires emailing daytime (and nighttime if illuminated) photos. Inspections are conducted via online scheduling at devservices.peoriaaz.gov.
Verified 2026-06-29 · Source
When you need this permit
- Submit a sign permit application to the Planning Division (623-773-7200)
- Plan review fee due at time of submittal; sign area fees and inspection fees are calculated by staff and due before permit issuance
- After permit approval: inspection scheduling via online portal or email; for illuminated and freestanding monument signs, schedule via devservices.peoriaaz.gov; for all sign types, email daytime (and nighttime if illuminated) photos for final planning inspection
Required documents
- Req
Sign Permit Application
Available from the Planning Division (Planning & Community Development Department)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan review fee | $30 | Peoria Development Fee Schedule, Rev. 9/2025, Section I — 'Sign Permits: Plan Review Fee: $30'. |
| Sign permit extension | $100 | Peoria Development Fee Schedule, Rev. 9/2025, Section I — 'Sign Permit Extension: $100'. |
| Sign area fee — 0 to 32 sq ft | $70 | Peoria Development Fee Schedule, Rev. 9/2025, Section I. |
| Sign area fee — 33 to 48 sq ft | $80 | Peoria Development Fee Schedule, Rev. 9/2025, Section I. |
| Sign area fee — over 49 sq ft | $120 | Peoria Development Fee Schedule, Rev. 9/2025, Section I. |
| Sign electrical inspection fee | $75 | Peoria Development Fee Schedule, Rev. 9/2025, Section I — 'Sign Inspection Fees: Electrical Inspection: $75'. |
| Sign footing inspection fee | $75 | Peoria Development Fee Schedule, Rev. 9/2025, Section I — 'Sign Inspection Fees: Footing Inspection: $75'. |
Review timeline
~5–12 business days
Typical estimate — confirm current times with the Peoria building department
Inspection process
- 1
Footing Inspection (freestanding signs)
Footing inspection for freestanding monument signs before concrete placement.
- 2
Final / Planning Inspection
Final planning inspection required for all sign types; email daytime (and nighttime if illuminated) photos for sign types; illuminated and freestanding signs are inspected via online scheduling at devservices.peoriaaz.gov.
Tips
- Sign permits are administered by the Planning Division (623-773-7200), not Building Development.
- The plan review fee ($30) is due at application; sign area and inspection fees are calculated later and due before permit issuance.
- For the final planning inspection, email daytime (and nighttime if illuminated) photos — contact the Planning Division for submission email.
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
- City of Peoria Development & Engineering Department — Building Development — official building department
- Development Fee Schedule (Rev. 9/2025) — PDF | City of Peoria (current official)
- Inspections | City of Peoria (Wayback June 2025)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Peoria building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Peoria
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.