Commercial / Multifamily Building Permit in Peoria, Arizona

Required for new commercial construction, tenant improvements, commercial shells, and multi-family residential projects in Peoria. Commercial plan review must be completed before permits are issued. The plan review process ensures compliance with adopted codes. Plans and permit applications are submitted online at devservices.peoriaaz.gov using the appropriate commercial application (400NC for new commercial, 400TI for tenant improvements, 400CofO for Certificate of Occupancy only). Commercial plan review timelines are 18 business days for new commercial (1st submittal), 12–16 days for shells, and 12 days for tenant improvements.

Verified 2026-06-29 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building permit — valuation-basedTiered valuation-based fee from Development Fee Schedule, Section VI. Examples from the valuation table: tenant improvement (major) = 40% of original building area valuation; tenant improvement (minor) = 20% of original building area valuation. Commercial/office buildings (V-B, 'Other' column): $58/sq ft. Restaurants: $77/sq ft. Retail/stores: $45/sq ft. Warehouses: $25.50/sq ft.Peoria Development Fee Schedule, Rev. 9/2025. 'Building Shell Only' is 80% of full valuation. Tenant Improvement major = 40% of original building area value; minor = 20%.
Plan check fee65% of the building permit feePeoria Development Fee Schedule, Rev. 9/2025.
Final Certificate of Occupancy$173Peoria Development Fee Schedule, Rev. 9/2025 — 'Final Certificate of Occupancy (C of O): $173'.
Tenant Improvement — C of O only building permit$259Peoria Development Fee Schedule, Rev. 9/2025.
60-day Temporary, Conditional & Partial C of O$1,150Peoria Development Fee Schedule, Rev. 9/2025.
Expedited plan check / inspections (minimum $1,000)200% of calculated fee (minimum $1,000)Peoria Development Fee Schedule, Rev. 9/2025 — 'Expedited Plan Check/Inspections (min $1,000): 200% of calculated fee'.

Review timeline

1218 business days

Peoria’s published plan-review target

Inspection process

  1. 1

    Foundation / Structural

    Foundation and rough structural inspections during construction per approved plans

  2. 2

    Rough Trades

    Rough plumbing, mechanical, and electrical before concealment

  3. 3

    Final / Certificate of Occupancy

    Final inspection of all code-required construction; Certificate of Occupancy issued upon approval

Tips

Frequently asked questions

What is the self-certification pilot program in Peoria?
The self-certification program eliminates building plan review for qualifying tenant improvement permits by licensed design professionals who hold ICC Building Plans Examiner Certification and have completed Peoria-required training. Eligible projects must be non-residential, two stories or less, 15,000 sq ft or less, and not include H occupancy. Permits can be issued within three business days. Source: City of Peoria Plan Review and Building Permits page.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Peoria building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Peoria

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.