Eloy building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Eloy, Arizona.

Verified 2026-07-07 · Source

How to schedule

Inspections are requested through the building department below.

Address
595 N. C Street, Suite 102, Eloy, AZ 85131
Phone
520-466-2578
Office hours
Monday - Friday, 8 a.m. - 5 p.m. Building/electrical/mechanical/plumbing permit applications and Right-of-Way/On-Site Civil Permit applications are submitted electronically through the City's iworq permit portal (eloypermits.portal.iworq.net); plan submittals must be PDF format, layers flattened, 50 MB maximum file size. Inspection Line: 520-464-3179. Permit Technicians: Chris Encisco (cencisco@eloyaz.gov), Nadine Diaz (ndiaz@eloyaz.gov).

Inspection sequence

Applies to: Certificate of Occupancy / Change of Occupancy

  1. 1

    City Engineer sign-off

    Public Works/Engineering approval (520-466-3082)

  2. 2

    Planning / Zoning sign-off

    Planning and Zoning approval (520-466-2578)

  3. 3

    Eloy Fire District sign-off

    Fire District approval (520-466-3544)

  4. 4

    Water / Sewer sign-off

    Water/Sewer approval (520-464-1392)

  5. 5

    Water Dept. sign-off

    Water Department approval (520-466-9201)

  6. 6

    Building Inspector final inspection

    Cannot be conducted until all other department approvals are received

  7. 7

    Chief Building Official final sign-off

    Issues the Certificate of Occupancy once all approvals and the final inspection are complete

Applies to: Fire Sprinkler & Fire Alarm Permit (Eloy Fire District)

  1. 1

    Preliminary Plan Review

    Initial Fire District review of submitted plans/drawings

  2. 2

    Final Plan Review

    Final Fire District plan approval before permit issuance

  3. 3

    Inspection — Access

    Conducted prior to combustibles being allowed on the property

  4. 4

    Inspection — Construction

    In-progress construction inspection of the fire protection system

  5. 5

    Inspection — Final (Acceptance/Final Testing)

    Final acceptance testing of the installed fire alarm or fire sprinkler system; call the Fire District (520-466-3544) for inspection or reinspection

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation/Footing

    Before concrete pour; verifies 12-inch minimum footing depth and reinforcing per City of Eloy amendments (R403.1 amended)

  2. 2

    Framing

    Structural framing, connections, and egress per 2018 IRC and City of Eloy design criteria

  3. 3

    Rough Mechanical/Electrical/Plumbing

    Ductwork, wiring, and piping inspected before concealment

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; Certificate of Occupancy issued per building ($30 R-3 single-family)

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions

  2. 2

    Framing

    Structural connections to the existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed, panel labeled, protections verified per 2017 NEC

Applies to: EV Charger / EVSE Permit (Dedicated Fee Category — Amount Unpublished)

  1. 1

    Rough-In

    Charger circuit wiring and box placement before walls are closed, if applicable

  2. 2

    Final

    EVSE installed, GFCI/disconnect and connections verified per 2017 NEC Article 625

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified, efficiency ratings confirmed (16 SEER / 78-80% AFUE minimums)

Applies to: Plumbing Permit

  1. 1

    Underground/Rough-In

    Sewer, drainage, vent, water, and gas distribution systems inspected before burial or concealment

  2. 2

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified per 2017 NEC

Final inspection only: Demolition Permit, Re-Roofing Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Eloy building permits

Get alerts for Eloy

We'll email you when Eloy's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.