Mechanical / HVAC Permit in Eloy, Arizona

Required for heating, ventilation, and air conditioning installations in Eloy, governed by the 2018 International Mechanical Code (IMC) as adopted by the City. New/replacement HVAC must meet the City's amended minimum efficiency thresholds (16 SEER, 78%/80% AFUE).

Verified 2026-08-21 · Source

When you need this permit

  • Mechanical permit required for new heating/AC units, new locations or ductwork/curbing, fireplace inserts/replacement, firepits/BBQs/outdoor kitchens with gas connections, and new or replacement wall/ground-mounted equipment
  • Governed by the 2018 IMC as adopted by the City of Eloy
  • New and replacement HVAC equipment must be sized per ACCA Manual J, S, and D (load calculation, equipment selection, duct design); minimum 16 SEER for air conditioning equipment; minimum 78% AFUE (weatherized) / 80% AFUE (non-weatherized) for gas heating equipment
  • New rooftop or attic-space units require a Roof System Confirmation (sealed engineer letter or truss manufacturer verification letter) and RESCheck for all new mechanical units
  • Correct ROC license class must be listed for the specific mechanical work being performed Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Minimal Permit — Mechanical permit, improvement valuation less than $500
City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees — the FY 2025-2026 mechanical issuance fee and per-unit fee schedule (HVAC… Show full citationCity of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees — the FY 2025-2026 mechanical issuance fee and per-unit fee schedule (HVAC change-outs, combination units, ductwork, air-conditioning and furnace lines) were deleted in their entirety in the FY 2026-2027 schedule ('Deleted to simplify the Fee Schedule and incorporated into the Minimal Permits') and replaced by flat minimal-permit fees plus the general valuation table for larger jobs
$70.00
Combination Building Permit (any combination of Building, Electrical, Mechanical, or Plumbing permit types), improvement valuation less than $1,000City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees
$92.50
Mechanical work with improvement valuation of $500 or moreCity of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026) — with the former mechanical unit-fee schedule deleted, mechanical permits above the minimal-permit threshold are billed on the general valuation-based Building Permit Fee table
Per the Residential and Commercial Permit Fees valuation table ($70.00 minimum for $1-$500; $70.00 + $4.50 per $100 to $2,000; scaling tiers as published)

Review timeline

Plan reviewEloy’s published plan-review target
25–90 business days

How long did your Mechanical / HVAC Permit permit actually take in Eloy?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified, efficiency ratings confirmed (16 SEER / 78-80% AFUE minimums)

See the full Eloy inspection guide — scheduling & re-inspection fees →

Tips

  • Eloy's published minimum efficiency thresholds (16 SEER for AC, 78% AFUE weatherized / 80% AFUE non-weatherized gas heating) are stricter than the unamended 2018 IECC baseline — confirm equipment specs meet these before purchase.
  • New rooftop or attic HVAC units require a Roof System Confirmation (sealed engineer letter or truss manufacturer letter) verifying the roof can support the new unit — this is commonly missed on straightforward change-outs that add curbing or relocate equipment.
  • The FY 2026-2027 fee schedule (effective July 1, 2026) deleted the dedicated HVAC change-out, combination-unit, and ductwork fee lines — a typical residential HVAC change-out is now billed as a Minimal Mechanical Permit ($70.00 under $500 improvement valuation, $92.50 combined with other trades under $1,000) or on the general valuation-based fee table.

Frequently asked questions

Eloy requires a mechanical / hvac permit for: Mechanical permit required for new heating/AC units, new locations or ductwork/curbing, fireplace inserts/replacement, firepits/BBQs/outdoor kitchens with gas connections, and new or replacement wall/ground-mounted equipment; Governed by the 2018 IMC as adopted by the City of Eloy; New and replacement HVAC equipment must be sized per ACCA Manual J, S, and D (load calculation, equipment selection, duct design); minimum 16 SEER for air conditioning equipment; minimum 78% AFUE (weatherized) / 80% AFUE (non-weatherized) for gas heating equipment; New rooftop or attic-space units require a Roof System Confirmation (sealed engineer letter or truss manufacturer verification letter) and RESCheck for all new mechanical units; Correct ROC license class must be listed for the specific mechanical work being performed. If your project isn't listed, confirm with City of Eloy Community Development Department — Building Safety Division at 520-466-2578 before starting work.

In Eloy, the published Minimal Permit — Mechanical permit, improvement valuation less than $500 is: $70.00. Additional published fees: Combination Building Permit (any combination of Building, Electrical, Mechanical, or Plumbing permit types), improvement valuation less than $1,000 — $92.50; Mechanical work with improvement valuation of $500 or more — Per the Residential and Commercial Permit Fees valuation table ($70.00 minimum for $1-$500; $70.00 + $4.50 per $100 to $2,000; scaling tiers as published). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Eloy's published plan-review target for a mechanical / hvac permit is 25–90 business days.

You'll need: City of Eloy Building Permit Application (Mechanical); Minimal Mechanical Permit Only Checklist; Manual J, S, and D Load Calculations. See the required-documents checklist on this page for details on each.

Eloy requires 2 inspection(s) for a mechanical / hvac permit, in order: Rough-In, Final. Schedule each through City of Eloy Community Development Department — Building Safety Division (520-466-2578).

Apply through City of Eloy Community Development Department — Building Safety Division at 595 N. C Street, Suite 102, Eloy, AZ 85131. Phone: 520-466-2578, email: Inspections@EloyAZ.gov. Office hours: Monday - Friday, 8 a.m. - 5 p.m. Building/electrical/mechanical/plumbing permit applications and Right-of-Way/On-Site Civil Permit applications are submitted electronically through the City's iworq permit portal (eloypermits.portal.iworq.net); plan submittals must be PDF format, layers flattened, 50 MB maximum file size. Inspection Line: 520-464-3179. Permit Technicians: Chris Encisco (cencisco@eloyaz.gov), Nadine Diaz (ndiaz@eloyaz.gov).. Official information: https://eloyaz.gov/138/Building-Safety.

Eloy, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. § 9-802, adoption of public records/technical codes by reference). The City of Eloy independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division under Chapter 5 (Building Regulations) of the Eloy City Code; it does not defer permitting to Pinal County. Source: City of Eloy Ordinance No. 20-900 (adopted December 14, 2020), adopting the City of Eloy Building Code pursuant to A.R.S. § 9-802; Eloy City Code § 5-3, Adoption of Codes.; 2018 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-3 and § 5-8, Amendments to the 2018 International Building Code). Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025), Part II.; 2018 International Residential Code (IRC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-9, Amendments to the 2018 International Residential Code). Governs one- and two-family dwelling construction. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025).; 2018 International Energy Conservation Code (IECC), adopted by reference with City of Eloy amendments; governs residential energy compliance (prescriptive, UA trade-off/RES-check, or performance path). Minimum HVAC efficiencies published by the Building Safety Division: 16 SEER minimum for air conditioning equipment (R403.3.1.2.1 amended, stricter than the unamended IECC baseline), 78% AFUE minimum for weatherized gas heating equipment and 80% AFUE for non-weatherized equipment. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part II §§ X.g-X.h and XV.a.; 2018 International Existing Building Code (IEBC), adopted and amended by the Mayor and Council of the City of Eloy; applies to reconstruction, alteration, relocation, enlargement, replacement, repair, equipment, use/occupancy, and demolition of existing buildings or structures. Source: City of Eloy Ordinance No. 20-900.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference; swimming pool/spa barrier and enclosure/safety-device requirements administered consistent with Arizona Revised Statutes § 36-1681, as amended. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 IRC Minimum Submittal Checklist, Part II § I.y.; 2018 International Fire Code (IFC), enforced by the Eloy Fire District for fire sprinkler and life-safety requirements; a copy of the approved Eloy Fire District Permit is a required submittal item for residential building permits. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part III item 23.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference with City of Eloy amendments (note: electrical code cycle is one edition behind the 2018 ICC set). Source: City of Eloy Building Safety Division page (eloyaz.gov/138/Building-Safety); City of Eloy Ordinance No. 20-900.; City of Eloy Code, Chapter 5 (Building Regulations), including § 5-3 (Adoption of Codes), § 5-5 (Building Code Administration), § 5-8 (Amendments to the 2018 International Building Code), and § 5-9 (Amendments to the 2018 International Residential Code) — the operative local amendment layer over the adopted ICC model codes. Copies of all amendments are kept on file with the City Clerk and the Community Development Department. Source: Eloy, AZ Code of Ordinances (codelibrary.amlegal.com/codes/eloyaz).; Manufactured/factory-built homes and park models are regulated by the State of Arizona Department of Housing for construction/installation standards and licensing (permit fees for mobile homes are adopted from and updated annually by the State of Arizona Department of Housing); the City of Eloy separately charges local hook-up fees (sewer, water, electrical connections) for site placement. Source: City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Mobile Home Licensing Fees and Mobile Home hook-up sections.. Local amendments apply — see the Eloy overview page for the full list.

A minimum of 16 SEER for air conditioning equipment, and 78% AFUE (weatherized) or 80% AFUE (non-weatherized) for gas heating equipment, sized per ACCA Manual J and S, per the City of Eloy's 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025).

Sources & verification

Verified against official sources. Last reviewed 2026-08-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Eloy's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Eloy yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Eloy lands. Privacy.