Mechanical / HVAC Permit in Eloy, Arizona

Required for heating, ventilation, and air conditioning installations in Eloy, governed by the 2018 International Mechanical Code (IMC) as adopted by the City. New/replacement HVAC must meet the City's amended minimum efficiency thresholds (16 SEER, 78%/80% AFUE).

Verified 2026-07-07 · Source

When you need this permit

  • Mechanical permit required for new heating/AC units, new locations or ductwork/curbing, fireplace inserts/replacement, firepits/BBQs/outdoor kitchens with gas connections, and new or replacement wall/ground-mounted equipment
  • Governed by the 2018 IMC as adopted by the City of Eloy
  • New and replacement HVAC equipment must be sized per ACCA Manual J, S, and D (load calculation, equipment selection, duct design); minimum 16 SEER for air conditioning equipment; minimum 78% AFUE (weatherized) / 80% AFUE (non-weatherized) for gas heating equipment
  • New rooftop or attic-space units require a Roof System Confirmation (sealed engineer letter or truss manufacturer verification letter) and RESCheck for all new mechanical units
  • Correct ROC license class must be listed for the specific mechanical work being performed Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Issuance of Mechanical PermitCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Mechanical Permit Fees
$30.00 plus additional fee per item constructed/installed
Supplemental permit (original not expired/cancelled/finaled)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$9.00
HVAC Change-outs per unit excluding ductwork (includes plan review fee) — Residential (R-3)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$120.00
HVAC Change-outs per unit excluding ductwork (includes plan review fee) — All othersCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$90.00
Combination units (heating and cooling) — Residential (R-3)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$150.00
Combination units (heating and cooling) — All othersCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$135.00
If ductwork is being replaced (additional)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$180.00
Air Conditioning, Single-Family (per unit, with or without ductwork including associated electrical work)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Air Conditioning unit fee
$25.00
Installation/relocation of forced-air or gravity furnace/burner, up to 100,000 Btu/hCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule (over 100,000 Btu/h is $18.20)
$14.80

Review timeline

Plan reviewEloy’s published plan-review target
25–90 business days

How long did your Mechanical / HVAC Permit permit actually take in Eloy?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified, efficiency ratings confirmed (16 SEER / 78-80% AFUE minimums)

See the full Eloy inspection guide — scheduling & re-inspection fees →

Tips

  • Eloy's published minimum efficiency thresholds (16 SEER for AC, 78% AFUE weatherized / 80% AFUE non-weatherized gas heating) are stricter than the unamended 2018 IECC baseline — confirm equipment specs meet these before purchase.
  • New rooftop or attic HVAC units require a Roof System Confirmation (sealed engineer letter or truss manufacturer letter) verifying the roof can support the new unit — this is commonly missed on straightforward change-outs that add curbing or relocate equipment.
  • The 'HVAC Change-outs' fee already includes the plan review fee; ductwork replacement is billed as a separate additional line item ($180) on top of the unit change-out fee.

Frequently asked questions

Eloy requires a mechanical / hvac permit for: Mechanical permit required for new heating/AC units, new locations or ductwork/curbing, fireplace inserts/replacement, firepits/BBQs/outdoor kitchens with gas connections, and new or replacement wall/ground-mounted equipment; Governed by the 2018 IMC as adopted by the City of Eloy; New and replacement HVAC equipment must be sized per ACCA Manual J, S, and D (load calculation, equipment selection, duct design); minimum 16 SEER for air conditioning equipment; minimum 78% AFUE (weatherized) / 80% AFUE (non-weatherized) for gas heating equipment; New rooftop or attic-space units require a Roof System Confirmation (sealed engineer letter or truss manufacturer verification letter) and RESCheck for all new mechanical units; Correct ROC license class must be listed for the specific mechanical work being performed. If your project isn't listed, confirm with City of Eloy Community Development Department — Building Safety Division at 520-466-2578 before starting work.

In Eloy, the published Issuance of Mechanical Permit is: $30.00 plus additional fee per item constructed/installed. Additional published fees: Supplemental permit (original not expired/cancelled/finaled) — $9.00; HVAC Change-outs per unit excluding ductwork (includes plan review fee) — Residential (R-3) — $120.00; HVAC Change-outs per unit excluding ductwork (includes plan review fee) — All others — $90.00; Combination units (heating and cooling) — Residential (R-3) — $150.00; Combination units (heating and cooling) — All others — $135.00; If ductwork is being replaced (additional) — $180.00; Air Conditioning, Single-Family (per unit, with or without ductwork including associated electrical work) — $25.00; Installation/relocation of forced-air or gravity furnace/burner, up to 100,000 Btu/h — $14.80. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Eloy's published plan-review target for a mechanical / hvac permit is 25–90 business days.

You'll need: City of Eloy Building Permit Application (Mechanical); Minimal Mechanical Permit Only Checklist; Manual J, S, and D Load Calculations. See the required-documents checklist on this page for details on each.

Eloy requires 2 inspection(s) for a mechanical / hvac permit, in order: Rough-In, Final. Schedule each through City of Eloy Community Development Department — Building Safety Division (520-466-2578).

Apply through City of Eloy Community Development Department — Building Safety Division at 595 N. C Street, Suite 102, Eloy, AZ 85131. Phone: 520-466-2578, email: Inspections@EloyAZ.gov. Office hours: Monday - Friday, 8 a.m. - 5 p.m. Building/electrical/mechanical/plumbing permit applications and Right-of-Way/On-Site Civil Permit applications are submitted electronically through the City's iworq permit portal (eloypermits.portal.iworq.net); plan submittals must be PDF format, layers flattened, 50 MB maximum file size. Inspection Line: 520-464-3179. Permit Technicians: Chris Encisco (cencisco@eloyaz.gov), Nadine Diaz (ndiaz@eloyaz.gov).. Official information: https://eloyaz.gov/138/Building-Safety.

Eloy, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. § 9-802, adoption of public records/technical codes by reference). The City of Eloy independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division under Chapter 5 (Building Regulations) of the Eloy City Code; it does not defer permitting to Pinal County. Source: City of Eloy Ordinance No. 20-900 (adopted December 14, 2020), adopting the City of Eloy Building Code pursuant to A.R.S. § 9-802; Eloy City Code § 5-3, Adoption of Codes.; 2018 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-3 and § 5-8, Amendments to the 2018 International Building Code). Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025), Part II.; 2018 International Residential Code (IRC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-9, Amendments to the 2018 International Residential Code). Governs one- and two-family dwelling construction. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025).; 2018 International Energy Conservation Code (IECC), adopted by reference with City of Eloy amendments; governs residential energy compliance (prescriptive, UA trade-off/RES-check, or performance path). Minimum HVAC efficiencies published by the Building Safety Division: 16 SEER minimum for air conditioning equipment (R403.3.1.2.1 amended, stricter than the unamended IECC baseline), 78% AFUE minimum for weatherized gas heating equipment and 80% AFUE for non-weatherized equipment. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part II §§ X.g-X.h and XV.a.; 2018 International Existing Building Code (IEBC), adopted and amended by the Mayor and Council of the City of Eloy; applies to reconstruction, alteration, relocation, enlargement, replacement, repair, equipment, use/occupancy, and demolition of existing buildings or structures. Source: City of Eloy Ordinance No. 20-900.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference; swimming pool/spa barrier and enclosure/safety-device requirements administered consistent with Arizona Revised Statutes § 36-1681, as amended. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 IRC Minimum Submittal Checklist, Part II § I.y.; 2018 International Fire Code (IFC), enforced by the Eloy Fire District for fire sprinkler and life-safety requirements; a copy of the approved Eloy Fire District Permit is a required submittal item for residential building permits. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part III item 23.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference with City of Eloy amendments (note: electrical code cycle is one edition behind the 2018 ICC set). Source: City of Eloy Building Safety Division page (eloyaz.gov/138/Building-Safety); City of Eloy Ordinance No. 20-900.; City of Eloy Code, Chapter 5 (Building Regulations), including § 5-3 (Adoption of Codes), § 5-5 (Building Code Administration), § 5-8 (Amendments to the 2018 International Building Code), and § 5-9 (Amendments to the 2018 International Residential Code) — the operative local amendment layer over the adopted ICC model codes. Copies of all amendments are kept on file with the City Clerk and the Community Development Department. Source: Eloy, AZ Code of Ordinances (codelibrary.amlegal.com/codes/eloyaz).; Manufactured/factory-built homes and park models are regulated by the State of Arizona Department of Housing for construction/installation standards and licensing (permit fees for mobile homes are adopted from and updated annually by the State of Arizona Department of Housing); the City of Eloy separately charges local hook-up fees (sewer, water, electrical connections) for site placement. Source: City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (effective February 16, 2026), Mobile Home Licensing Fees and Mobile Home hook-up sections.. Local amendments apply — see the Eloy overview page for the full list.

A minimum of 16 SEER for air conditioning equipment, and 78% AFUE (weatherized) or 80% AFUE (non-weatherized) for gas heating equipment, sized per ACCA Manual J and S, per the City of Eloy's 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025).

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.