EV Charger / EVSE Permit (Dedicated Fee Category — Amount Unpublished) in Eloy, Arizona

Required for installation of a Level 2 (or higher) electric vehicle charger/EVSE in Eloy, governed by the 2017 NEC (Article 625) as adopted by the City. History: the FY 2025-2026 schedule carried a NAMED 'Electrical Vehicle Charging Stations (Residential) - per station' fee row whose dollar cell was genuinely blank in both the January 12, 2026 and February 16, 2026 amended versions — a confirmed gap in the City's own document. The Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026) DELETED that row outright, with the stated justification that it was not applicable to plan review fees and was duplicative of the electrical line-item fees — so an EV charger circuit is now simply ordinary electrical work: a flat $70.00 Minimal Electrical Permit when the improvement valuation is under $500 ($92.50 as a combination permit under $1,000), or the general valuation-based fee table above that. The City's Minimal Electrical Only Permit Checklist (rev. 05/25/2026) explicitly lists 'EV charger' among the equipment types requiring Load Calculations under the general 'Adding Circuits or Outlets' electrical-permit submittal category.

Verified 2026-08-21 · Source

When you need this permit

  • Electrical permit required for the EV charger circuit installation, filed via the City's iworq electronic permit portal
  • Load Calculations required for the EV charger circuit, per the City's Minimal Electrical Only Permit Checklist (rev. 05/25/2026), 'Adding Circuits or Outlets' section
  • Electrical schematic/floor plan showing new and existing circuit/outlet locations, circuit amperage, and GFCI/AFCI requirements
  • Correct ROC (Registrar of Contractors) license class must be listed for the electrical work being performed Contractor
  • Governed by the 2017 NEC as adopted by the City of Eloy, including Article 625 (Electric Vehicle Power Transfer System)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Minimal Permit — Electrical permit, improvement valuation less than $500 (typical residential EV charger circuit)
City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees. Show full citationCity of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees. The named 'Electrical Vehicle Charging Stations (Residential) - per station' row — which carried a blank fee cell in both the January 12, 2026 and February 16, 2026 amended FY 2025-2026 schedules — was DELETED in the FY 2026-2027 schedule with the stated justification that it was duplicative of the electrical line-item fees; EV charger circuits are now billed as ordinary electrical work
$70.00
Combination Building Permit (any combination of Building, Electrical, Mechanical, or Plumbing permit types), improvement valuation less than $1,000City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees
$92.50
EV charger work with improvement valuation of $500 or moreCity of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026) — the former electrical issuance-plus-unit-fee model was deleted in FY 2026-2027
Per the Residential and Commercial Permit Fees valuation table ($70.00 minimum for $1-$500; $70.00 + $4.50 per $100 to $2,000; scaling tiers as published)

Review timeline

Plan reviewEloy’s published plan-review target
25–90 business days

How long did your EV Charger / EVSE Permit (Dedicated Fee Category — Amount Unpublished) permit actually take in Eloy?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Charger circuit wiring and box placement before walls are closed, if applicable

  2. 2

    Final

    EVSE installed, GFCI/disconnect and connections verified per 2017 NEC Article 625

See the full Eloy inspection guide — scheduling & re-inspection fees →

Tips

  • The FY 2025-2026 schedule's named 'Electrical Vehicle Charging Stations (Residential) - per station' row (which never carried a published dollar figure) was deleted in the Adopted FY 2026-2027 schedule as duplicative of the electrical line-item fees — a residential EV charger circuit is now billed as ordinary electrical work, typically the flat $70.00 Minimal Electrical Permit for improvement valuations under $500.
  • The City's own Minimal Electrical Only Permit Checklist explicitly names 'EV charger' as requiring Load Calculations under its general 'Adding Circuits or Outlets' electrical-permit category.
  • The former $30.00 electrical issuance fee and per-item unit fees were deleted in FY 2026-2027 — for jobs at or above $500 improvement valuation the general valuation-based permit fee table applies instead ($70.00 minimum).

Frequently asked questions

Eloy requires an ev charger / evse permit (dedicated fee category — amount unpublished) for: Electrical permit required for the EV charger circuit installation, filed via the City's iworq electronic permit portal; Load Calculations required for the EV charger circuit, per the City's Minimal Electrical Only Permit Checklist (rev. 05/25/2026), 'Adding Circuits or Outlets' section; Electrical schematic/floor plan showing new and existing circuit/outlet locations, circuit amperage, and GFCI/AFCI requirements; Correct ROC (Registrar of Contractors) license class must be listed for the electrical work being performed; Governed by the 2017 NEC as adopted by the City of Eloy, including Article 625 (Electric Vehicle Power Transfer System). If your project isn't listed, confirm with City of Eloy Community Development Department — Building Safety Division at 520-466-2578 before starting work.

Under the Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), a typical residential EV charger circuit is billed as a Minimal Electrical Permit at a flat $70.00 (improvement valuation under $500), $92.50 as a combination permit with other trades (under $1,000), or on the general valuation-based fee table for larger jobs. The FY 2025-2026 schedule's dedicated EV-charging-station row — which never carried a published dollar figure — was deleted in FY 2026-2027 as duplicative of the electrical fees.

Eloy's published plan-review target for an ev charger / evse permit (dedicated fee category — amount unpublished) is 25–90 business days.

You'll need: City of Eloy Building Permit Application (Electrical); Minimal Electrical Only Permit Checklist. See the required-documents checklist on this page for details on each.

Eloy requires 2 inspection(s) for an ev charger / evse permit (dedicated fee category — amount unpublished), in order: Rough-In, Final. Schedule each through City of Eloy Community Development Department — Building Safety Division (520-466-2578).

Apply through City of Eloy Community Development Department — Building Safety Division at 595 N. C Street, Suite 102, Eloy, AZ 85131. Phone: 520-466-2578, email: Inspections@EloyAZ.gov. Office hours: Monday - Friday, 8 a.m. - 5 p.m. Building/electrical/mechanical/plumbing permit applications and Right-of-Way/On-Site Civil Permit applications are submitted electronically through the City's iworq permit portal (eloypermits.portal.iworq.net); plan submittals must be PDF format, layers flattened, 50 MB maximum file size. Inspection Line: 520-464-3179. Permit Technicians: Chris Encisco (cencisco@eloyaz.gov), Nadine Diaz (ndiaz@eloyaz.gov).. Official information: https://eloyaz.gov/138/Building-Safety.

Eloy, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. § 9-802, adoption of public records/technical codes by reference). The City of Eloy independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division under Chapter 5 (Building Regulations) of the Eloy City Code; it does not defer permitting to Pinal County. Source: City of Eloy Ordinance No. 20-900 (adopted December 14, 2020), adopting the City of Eloy Building Code pursuant to A.R.S. § 9-802; Eloy City Code § 5-3, Adoption of Codes.; 2018 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-3 and § 5-8, Amendments to the 2018 International Building Code). Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025), Part II.; 2018 International Residential Code (IRC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-9, Amendments to the 2018 International Residential Code). Governs one- and two-family dwelling construction. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025).; 2018 International Energy Conservation Code (IECC), adopted by reference with City of Eloy amendments; governs residential energy compliance (prescriptive, UA trade-off/RES-check, or performance path). Minimum HVAC efficiencies published by the Building Safety Division: 16 SEER minimum for air conditioning equipment (R403.3.1.2.1 amended, stricter than the unamended IECC baseline), 78% AFUE minimum for weatherized gas heating equipment and 80% AFUE for non-weatherized equipment. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part II §§ X.g-X.h and XV.a.; 2018 International Existing Building Code (IEBC), adopted and amended by the Mayor and Council of the City of Eloy; applies to reconstruction, alteration, relocation, enlargement, replacement, repair, equipment, use/occupancy, and demolition of existing buildings or structures. Source: City of Eloy Ordinance No. 20-900.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference; swimming pool/spa barrier and enclosure/safety-device requirements administered consistent with Arizona Revised Statutes § 36-1681, as amended. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 IRC Minimum Submittal Checklist, Part II § I.y.; 2018 International Fire Code (IFC), enforced by the Eloy Fire District for fire sprinkler and life-safety requirements; a copy of the approved Eloy Fire District Permit is a required submittal item for residential building permits. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part III item 23.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference with City of Eloy amendments (note: electrical code cycle is one edition behind the 2018 ICC set). Source: City of Eloy Building Safety Division page (eloyaz.gov/138/Building-Safety); City of Eloy Ordinance No. 20-900.; City of Eloy Code, Chapter 5 (Building Regulations), including § 5-3 (Adoption of Codes), § 5-5 (Building Code Administration), § 5-8 (Amendments to the 2018 International Building Code), and § 5-9 (Amendments to the 2018 International Residential Code) — the operative local amendment layer over the adopted ICC model codes. Copies of all amendments are kept on file with the City Clerk and the Community Development Department. Source: Eloy, AZ Code of Ordinances (codelibrary.amlegal.com/codes/eloyaz).; Manufactured/factory-built homes and park models are regulated by the State of Arizona Department of Housing for construction/installation standards and licensing (permit fees for mobile homes are adopted from and updated annually by the State of Arizona Department of Housing); the City of Eloy separately charges local hook-up fees (sewer, water, electrical connections) for site placement. Source: City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Mobile Home Licensing Fees and Mobile Home hook-up sections.. Local amendments apply — see the Eloy overview page for the full list.

Yes. The City's Minimal Electrical Only Permit Checklist (rev. 05/25/2026) explicitly lists 'EV charger' among equipment types requiring Load Calculations under the 'Adding Circuits or Outlets' electrical-permit submittal category.

Eloy's permit history isn't searchable here yet