EV Charger / EVSE Permit (Dedicated Fee Category — Amount Unpublished) — Eloy, Arizona · Requirements sheet
Verified 2026-08-21 · Source: https://eloyaz.gov/DocumentCenter/View/9028/Consolidated-Rate-and-Fee-Schedule-FY-26-27
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit (Dedicated Fee Category — Amount Unpublished) in Eloy, Arizona
Required for installation of a Level 2 (or higher) electric vehicle charger/EVSE in Eloy, governed by the 2017 NEC (Article 625) as adopted by the City. History: the FY 2025-2026 schedule carried a NAMED 'Electrical Vehicle Charging Stations (Residential) - per station' fee row whose dollar cell was genuinely blank in both the January 12, 2026 and February 16, 2026 amended versions — a confirmed gap in the City's own document. The Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026) DELETED that row outright, with the stated justification that it was not applicable to plan review fees and was duplicative of the electrical line-item fees — so an EV charger circuit is now simply ordinary electrical work: a flat $70.00 Minimal Electrical Permit when the improvement valuation is under $500 ($92.50 as a combination permit under $1,000), or the general valuation-based fee table above that. The City's Minimal Electrical Only Permit Checklist (rev. 05/25/2026) explicitly lists 'EV charger' among the equipment types requiring Load Calculations under the general 'Adding Circuits or Outlets' electrical-permit submittal category.
Verified 2026-08-21 · Source
When you need this permit
- Electrical permit required for the EV charger circuit installation, filed via the City's iworq electronic permit portal
- Load Calculations required for the EV charger circuit, per the City's Minimal Electrical Only Permit Checklist (rev. 05/25/2026), 'Adding Circuits or Outlets' section
- Electrical schematic/floor plan showing new and existing circuit/outlet locations, circuit amperage, and GFCI/AFCI requirements
- Correct ROC (Registrar of Contractors) license class must be listed for the electrical work being performed Contractor
- Governed by the 2017 NEC as adopted by the City of Eloy, including Article 625 (Electric Vehicle Power Transfer System)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees. Show full citationHide
City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees. The named 'Electrical Vehicle Charging Stations (Residential) - per station' row — which carried a blank fee cell in both the January 12, 2026 and February 16, 2026 amended FY 2025-2026 schedules — was DELETED in the FY 2026-2027 schedule with the stated justification that it was duplicative of the electrical line-item fees; EV charger circuits are now billed as ordinary electrical workReview timeline
Inspection process
- 1
Rough-In
Charger circuit wiring and box placement before walls are closed, if applicable
- 2
Final
EVSE installed, GFCI/disconnect and connections verified per 2017 NEC Article 625
See the full Eloy inspection guide — scheduling & re-inspection fees →
Tips
- The FY 2025-2026 schedule's named 'Electrical Vehicle Charging Stations (Residential) - per station' row (which never carried a published dollar figure) was deleted in the Adopted FY 2026-2027 schedule as duplicative of the electrical line-item fees — a residential EV charger circuit is now billed as ordinary electrical work, typically the flat $70.00 Minimal Electrical Permit for improvement valuations under $500.
- The City's own Minimal Electrical Only Permit Checklist explicitly names 'EV charger' as requiring Load Calculations under its general 'Adding Circuits or Outlets' electrical-permit category.
- The former $30.00 electrical issuance fee and per-item unit fees were deleted in FY 2026-2027 — for jobs at or above $500 improvement valuation the general valuation-based permit fee table applies instead ($70.00 minimum).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-21.
Fee schedules
Checklists & handouts
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Eloy's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Eloy yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Eloy lands. Privacy.
Other permits in Eloy
EV Charger / EVSE Permit (Dedicated Fee Category — Amount Unpublished) in other cities
Compare ev charger / evse permit (dedicated fee category — amount unpublished) fees across Arizona →
Look up this fee in a different city →