Skip to main content
PermitBase

Electrical Permit in Eloy, Arizona

Required for electrical installation, alteration, or repair work in Eloy, governed by the 2017 National Electrical Code (NEC) as adopted by the City. Billed per a detailed unit/system fee schedule covering fixtures, services, and appliance circuits, in addition to a flat permit-issuance fee.

Verified 2026-07-07 · Source

When you need this permit

  • Electrical permit required for repair/replacement, added circuits/outlets, new service entrances/upgrades, and new electric meters
  • Governed by the 2017 NEC as adopted by the City of Eloy
  • Correct ROC (Registrar of Contractors) license class must be listed for the specific electrical work being performed Contractor
  • Electrical schematic/floor plan required showing circuit locations, GFCI/AFCI requirements, and appliance requirements for specialized equipment (spas, pumps, etc.)
  • Load calculations required for EV chargers, hot tubs, HVAC equipment, workshop equipment, and subpanels
  • One-line diagram required for service entrance sections (SES) and subpanels on new service/upgrade work; electrical services over 400 amps require an Arizona-engineer-sealed plan review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Issuance of each electrical permitCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Electrical Permit Fees
$30.00 plus additional fee per item constructed/installed
Supplemental permit (original not expired/cancelled/finaled)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$9.00
Receptacle/Switch/Light Outlets, first 20 fixtures, eachCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule (additional fixtures $0.73 each)
$1.10
For services of 600 volts or less, up to 200 amperesCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule
$30.50
For services of 600 volts or less, over 200 to 1,000 amperesCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule
$62.15
For services over 600 volts and over 1,000 amperesCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Unit Fee Schedule
$124.30
Electrical services of 400 amperes or larger (plan review, engineer-sealed plans required)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$100.00
Temporary Electrical Service or Panel Upgrade, per panelCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$90.00

Review timeline

Plan reviewEloy’s published plan-review target
25–90 business days

How long did your Electrical Permit permit actually take in Eloy?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed, panel labeled, protections verified per 2017 NEC

See the full Eloy inspection guide — scheduling & re-inspection fees →

Tips

  • The $30 electrical permit issuance fee is separate from and in addition to the applicable Unit Fee Schedule amounts for the specific work performed.
  • Electrical services of 400 amps or larger require plans sealed by an Arizona-registered engineer and carry a dedicated $100 plan review fee, on top of the applicable service-size unit fee.
  • Minimal/single-trade electrical permits are classified under the City's general 'Residential' A.R.S. § 9-835 timeframe (25 administrative + 65 substantive staff review days) absent a published faster single-trade track; simple over-the-counter items are typically issued much faster once administrative completeness clears.

Frequently asked questions

Eloy requires an electrical permit for: Electrical permit required for repair/replacement, added circuits/outlets, new service entrances/upgrades, and new electric meters; Governed by the 2017 NEC as adopted by the City of Eloy; Correct ROC (Registrar of Contractors) license class must be listed for the specific electrical work being performed; Electrical schematic/floor plan required showing circuit locations, GFCI/AFCI requirements, and appliance requirements for specialized equipment (spas, pumps, etc.); Load calculations required for EV chargers, hot tubs, HVAC equipment, workshop equipment, and subpanels; One-line diagram required for service entrance sections (SES) and subpanels on new service/upgrade work; electrical services over 400 amps require an Arizona-engineer-sealed plan review. If your project isn't listed, confirm with City of Eloy Community Development Department — Building Safety Division at 520-466-2578 before starting work.

Per the City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule: $30.50 for services 600 volts or less up to 200 amps, $62.15 for 201-1,000 amps, and $124.30 for services over 600 volts or over 1,000 amps, plus the $30.00 electrical permit issuance fee. Services of 400 amps or larger require an Arizona-engineer-sealed plan and a $100.00 plan review fee.

Eloy's published plan-review target for an electrical permit is 25–90 business days.

You'll need: City of Eloy Building Permit Application (Electrical); Minimal Electrical Only Permit Checklist. See the required-documents checklist on this page for details on each.

Eloy requires 2 inspection(s) for an electrical permit, in order: Rough-In, Final. Schedule each through City of Eloy Community Development Department — Building Safety Division (520-466-2578).

Apply through City of Eloy Community Development Department — Building Safety Division at 595 N. C Street, Suite 102, Eloy, AZ 85131. Phone: 520-466-2578, email: Inspections@EloyAZ.gov. Office hours: Monday - Friday, 8 a.m. - 5 p.m. Building/electrical/mechanical/plumbing permit applications and Right-of-Way/On-Site Civil Permit applications are submitted electronically through the City's iworq permit portal (eloypermits.portal.iworq.net); plan submittals must be PDF format, layers flattened, 50 MB maximum file size. Inspection Line: 520-464-3179. Permit Technicians: Chris Encisco (cencisco@eloyaz.gov), Nadine Diaz (ndiaz@eloyaz.gov).. Official information: https://eloyaz.gov/138/Building-Safety.

Eloy, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. § 9-802, adoption of public records/technical codes by reference). The City of Eloy independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division under Chapter 5 (Building Regulations) of the Eloy City Code; it does not defer permitting to Pinal County. Source: City of Eloy Ordinance No. 20-900 (adopted December 14, 2020), adopting the City of Eloy Building Code pursuant to A.R.S. § 9-802; Eloy City Code § 5-3, Adoption of Codes.; 2018 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-3 and § 5-8, Amendments to the 2018 International Building Code). Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025), Part II.; 2018 International Residential Code (IRC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-9, Amendments to the 2018 International Residential Code). Governs one- and two-family dwelling construction. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025).; 2018 International Energy Conservation Code (IECC), adopted by reference with City of Eloy amendments; governs residential energy compliance (prescriptive, UA trade-off/RES-check, or performance path). Minimum HVAC efficiencies published by the Building Safety Division: 16 SEER minimum for air conditioning equipment (R403.3.1.2.1 amended, stricter than the unamended IECC baseline), 78% AFUE minimum for weatherized gas heating equipment and 80% AFUE for non-weatherized equipment. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part II §§ X.g-X.h and XV.a.; 2018 International Existing Building Code (IEBC), adopted and amended by the Mayor and Council of the City of Eloy; applies to reconstruction, alteration, relocation, enlargement, replacement, repair, equipment, use/occupancy, and demolition of existing buildings or structures. Source: City of Eloy Ordinance No. 20-900.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference; swimming pool/spa barrier and enclosure/safety-device requirements administered consistent with Arizona Revised Statutes § 36-1681, as amended. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 IRC Minimum Submittal Checklist, Part II § I.y.; 2018 International Fire Code (IFC), enforced by the Eloy Fire District for fire sprinkler and life-safety requirements; a copy of the approved Eloy Fire District Permit is a required submittal item for residential building permits. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part III item 23.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference with City of Eloy amendments (note: electrical code cycle is one edition behind the 2018 ICC set). Source: City of Eloy Building Safety Division page (eloyaz.gov/138/Building-Safety); City of Eloy Ordinance No. 20-900.; City of Eloy Code, Chapter 5 (Building Regulations), including § 5-3 (Adoption of Codes), § 5-5 (Building Code Administration), § 5-8 (Amendments to the 2018 International Building Code), and § 5-9 (Amendments to the 2018 International Residential Code) — the operative local amendment layer over the adopted ICC model codes. Copies of all amendments are kept on file with the City Clerk and the Community Development Department. Source: Eloy, AZ Code of Ordinances (codelibrary.amlegal.com/codes/eloyaz).; Manufactured/factory-built homes and park models are regulated by the State of Arizona Department of Housing for construction/installation standards and licensing (permit fees for mobile homes are adopted from and updated annually by the State of Arizona Department of Housing); the City of Eloy separately charges local hook-up fees (sewer, water, electrical connections) for site placement. Source: City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (effective February 16, 2026), Mobile Home Licensing Fees and Mobile Home hook-up sections.. Local amendments apply — see the Eloy overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.