Plumbing Permit in Eloy, Arizona

Required for plumbing installation, alteration, or repair work in Eloy, including gas piping and water heater work, governed by the 2018 IRC plumbing provisions as adopted by the City.

Verified 2026-08-21 · Source

When you need this permit

  • Plumbing permit required for interior plumbing repair/replacement, new/replacement gas yard lines, new gas appliances, water heater fuel-type changes, and water/sewer yard line repair or replacement
  • Governed by the 2018 IRC plumbing provisions as adopted by the City of Eloy
  • Correct ROC license class must be listed for the specific plumbing work being performed Contractor
  • Gas repairs require BTU ratings and total developed length of piping at all gas appliances; gas yard line work requires dielectric union and house-side shutoff details
  • Water heater replacement includes a processing fee; storage-tank water heaters require a drain pan and drain line except where no drain is readily available for a replacement unit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Minimal Permit — Plumbing permit, improvement valuation less than $500
City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees — the FY 2025-2026 plumbing issuance fee and per-fixture Unit Fee Schedule… Show full citationCity of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees — the FY 2025-2026 plumbing issuance fee and per-fixture Unit Fee Schedule (fixtures, sewers, gas piping, water heater replacement lines) were deleted in their entirety in the FY 2026-2027 schedule ('Deleted to simplify the Fee Schedule and incorporated into the Minimal Permits') and replaced by flat minimal-permit fees plus the general valuation table for larger jobs
$70.00
Combination Building Permit (any combination of Building, Electrical, Mechanical, or Plumbing permit types), improvement valuation less than $1,000City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Minimal Permit Fees
$92.50
Plumbing work with improvement valuation of $500 or moreCity of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026) — with the former per-fixture plumbing Unit Fee Schedule deleted, plumbing permits above the minimal-permit threshold are billed on the general valuation-based Building Permit Fee table
Per the Residential and Commercial Permit Fees valuation table ($70.00 minimum for $1-$500; $70.00 + $4.50 per $100 to $2,000; scaling tiers as published)

Review timeline

Plan reviewEloy’s published plan-review target
25–90 business days

How long did your Plumbing Permit permit actually take in Eloy?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground/Rough-In

    Sewer, drainage, vent, water, and gas distribution systems inspected before burial or concealment

  2. 2

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

See the full Eloy inspection guide — scheduling & re-inspection fees →

Tips

  • The FY 2026-2027 fee schedule (effective July 1, 2026) deleted the former plumbing issuance fee and per-fixture Unit Fee Schedule entirely: minor plumbing work under $500 valuation is now a flat $70.00 Minimal Permit ($92.50 combined with other trades under $1,000 valuation), and larger jobs are billed on the general valuation-based permit fee table.
  • The former dedicated water-heater replacement fee lines were removed in FY 2026-2027 — a typical water heater replacement now falls under the flat $70.00 Minimal Plumbing Permit (improvement valuation under $500) or the valuation table.
  • Minimal/single-trade plumbing permits fall under the City's general 'Residential' A.R.S. § 9-835 timeframe (25 administrative + 65 substantive staff review days) absent a published faster single-trade track.

Frequently asked questions

Eloy requires a plumbing permit for: Plumbing permit required for interior plumbing repair/replacement, new/replacement gas yard lines, new gas appliances, water heater fuel-type changes, and water/sewer yard line repair or replacement; Governed by the 2018 IRC plumbing provisions as adopted by the City of Eloy; Correct ROC license class must be listed for the specific plumbing work being performed; Gas repairs require BTU ratings and total developed length of piping at all gas appliances; gas yard line work requires dielectric union and house-side shutoff details; Water heater replacement includes a processing fee; storage-tank water heaters require a drain pan and drain line except where no drain is readily available for a replacement unit. If your project isn't listed, confirm with City of Eloy Community Development Department — Building Safety Division at 520-466-2578 before starting work.

Under the City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026) there is no longer a dedicated water-heater fee line — the work is billed as a Minimal Plumbing Permit at a flat $70.00 when the improvement valuation is under $500 (or $92.50 as a combination permit under $1,000 valuation, or on the general valuation-based fee table above that).

Eloy's published plan-review target for a plumbing permit is 25–90 business days.

You'll need: City of Eloy Building Permit Application (Plumbing); Minimal Plumbing Permit Only Checklist. See the required-documents checklist on this page for details on each.

Eloy requires 2 inspection(s) for a plumbing permit, in order: Underground/Rough-In, Final. Schedule each through City of Eloy Community Development Department — Building Safety Division (520-466-2578).

Apply through City of Eloy Community Development Department — Building Safety Division at 595 N. C Street, Suite 102, Eloy, AZ 85131. Phone: 520-466-2578, email: Inspections@EloyAZ.gov. Office hours: Monday - Friday, 8 a.m. - 5 p.m. Building/electrical/mechanical/plumbing permit applications and Right-of-Way/On-Site Civil Permit applications are submitted electronically through the City's iworq permit portal (eloypermits.portal.iworq.net); plan submittals must be PDF format, layers flattened, 50 MB maximum file size. Inspection Line: 520-464-3179. Permit Technicians: Chris Encisco (cencisco@eloyaz.gov), Nadine Diaz (ndiaz@eloyaz.gov).. Official information: https://eloyaz.gov/138/Building-Safety.

Eloy, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. § 9-802, adoption of public records/technical codes by reference). The City of Eloy independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division under Chapter 5 (Building Regulations) of the Eloy City Code; it does not defer permitting to Pinal County. Source: City of Eloy Ordinance No. 20-900 (adopted December 14, 2020), adopting the City of Eloy Building Code pursuant to A.R.S. § 9-802; Eloy City Code § 5-3, Adoption of Codes.; 2018 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-3 and § 5-8, Amendments to the 2018 International Building Code). Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025), Part II.; 2018 International Residential Code (IRC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-9, Amendments to the 2018 International Residential Code). Governs one- and two-family dwelling construction. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025).; 2018 International Energy Conservation Code (IECC), adopted by reference with City of Eloy amendments; governs residential energy compliance (prescriptive, UA trade-off/RES-check, or performance path). Minimum HVAC efficiencies published by the Building Safety Division: 16 SEER minimum for air conditioning equipment (R403.3.1.2.1 amended, stricter than the unamended IECC baseline), 78% AFUE minimum for weatherized gas heating equipment and 80% AFUE for non-weatherized equipment. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part II §§ X.g-X.h and XV.a.; 2018 International Existing Building Code (IEBC), adopted and amended by the Mayor and Council of the City of Eloy; applies to reconstruction, alteration, relocation, enlargement, replacement, repair, equipment, use/occupancy, and demolition of existing buildings or structures. Source: City of Eloy Ordinance No. 20-900.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference; swimming pool/spa barrier and enclosure/safety-device requirements administered consistent with Arizona Revised Statutes § 36-1681, as amended. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 IRC Minimum Submittal Checklist, Part II § I.y.; 2018 International Fire Code (IFC), enforced by the Eloy Fire District for fire sprinkler and life-safety requirements; a copy of the approved Eloy Fire District Permit is a required submittal item for residential building permits. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part III item 23.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference with City of Eloy amendments (note: electrical code cycle is one edition behind the 2018 ICC set). Source: City of Eloy Building Safety Division page (eloyaz.gov/138/Building-Safety); City of Eloy Ordinance No. 20-900.; City of Eloy Code, Chapter 5 (Building Regulations), including § 5-3 (Adoption of Codes), § 5-5 (Building Code Administration), § 5-8 (Amendments to the 2018 International Building Code), and § 5-9 (Amendments to the 2018 International Residential Code) — the operative local amendment layer over the adopted ICC model codes. Copies of all amendments are kept on file with the City Clerk and the Community Development Department. Source: Eloy, AZ Code of Ordinances (codelibrary.amlegal.com/codes/eloyaz).; Manufactured/factory-built homes and park models are regulated by the State of Arizona Department of Housing for construction/installation standards and licensing (permit fees for mobile homes are adopted from and updated annually by the State of Arizona Department of Housing); the City of Eloy separately charges local hook-up fees (sewer, water, electrical connections) for site placement. Source: City of Eloy Adopted FY 2026-2027 Consolidated Rate and Fee Schedule (effective July 1, 2026), Mobile Home Licensing Fees and Mobile Home hook-up sections.. Local amendments apply — see the Eloy overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-08-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Eloy's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Eloy yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Eloy lands. Privacy.