Required for new single-family and two-family dwelling construction in the City of Eloy. Reviewed against the 2018 IRC, 2018 IBC (non-residential portions), and 2018 IECC as adopted and amended by the City under Chapter 5 of the Eloy City Code (Ordinance No. 20-900, effective December 14, 2020). Applications are submitted electronically through the City's iworq permit portal.

Verified 2026-07-07 · Source

When you need this permit

  • Building permit required for new single-family and two-family dwelling construction within Eloy city limits
  • Plans must comply with the 2018 IRC/IBC/IECC and City of Eloy amendments, including Climatic and Geographic Design Criteria (115 mph wind; Seismic Design Category B; 34°F winter design temperature; heavy termite potential; 12-inch minimum foundation/footing depth; 0-inch frost line depth)
  • Construction documents (cover sheet, site plan, foundation plan, floor plan, framing plans, elevations, sections, mechanical/electrical/plumbing plans, structural calculations) must be sealed by an Arizona-registered engineer or architect where required and submitted as flattened PDFs (50 MB max per file)
  • Water Availability Letter required from Public Works prior to submittal; Right-of-Way/On-Site Civil Permit required separately if within 400 feet of a public water/wastewater line
  • Pinal County Dust Control Permit required for earthmoving activity disturbing more than approximately 1,690 sq ft (City of Eloy is in the West Pinal Nonattainment Area)
  • Copy of approved Eloy Fire District Permit required as part of the submittal
  • 16 SEER minimum air conditioning efficiency and 78%/80% AFUE minimum gas heating efficiency (weatherized/non-weatherized) required per City-amended IECC criteria
  • Solar-ready zone (minimum 300 sq ft / 10% of roof area) and electrical panel reserved space for future solar required on new construction

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Residential Minimum ($1-$500 valuation)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (effective 2/16/2026, Resolution 26-1643), Residential and Commercial Permit Fees Based on Total Valuation table
$60.00
Building Permit Fee — $500.01 to $2,000City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$60.00 for the first $500.00 plus $4.45 for each additional $100.00 or fraction thereof, to and including $2,000.00
Building Permit Fee — $2,000.01 to $40,000City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$126.75 for the first $2,000.00 plus $15.00 for each additional $1,000.00 or fraction thereof, to and including $40,000.00
Building Permit Fee — $40,000.01 to $100,000City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$696.75 for the first $40,000.00 plus $12.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00
Building Permit Fee — $100,000.01 to $500,000City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$1,416.75 for the first $100,000.00 plus $7.85 for each additional $1,000.00 or fraction thereof, to and including $500,000.00
Building Permit Fee — $500,000.01 to $1,000,000City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$4,556.75 for the first $500,000.00 plus $6.60 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00
Building Permit Fee — over $1,000,000City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$7,856.75 for the first $1,000,000.00 plus $5.10 for each additional $1,000.00 to $5,000,000.00; $27,614.41 for the first $5,000,000.00 plus $4.00 per additional $1,000.00 above that
Residential Standard Plan Review (Standard Plans valid only while the City uses the same building code under which the plan was approved)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$1,200.00 plus the Building Permit Plan Review Fee
Plan Review Fee (general)City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule, Basic Plan Review Services section
65% of the calculated Building Permit Fee
Certificate of Occupancy — R-3 single-familyCity of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule
$30.00 per building

Review timeline

Plan reviewEloy’s published plan-review target
25–90 business days

How long did your Residential Building Permit (New Construction) permit actually take in Eloy?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Before concrete pour; verifies 12-inch minimum footing depth and reinforcing per City of Eloy amendments (R403.1 amended)

  2. 2

    Framing

    Structural framing, connections, and egress per 2018 IRC and City of Eloy design criteria

  3. 3

    Rough Mechanical/Electrical/Plumbing

    Ductwork, wiring, and piping inspected before concealment

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; Certificate of Occupancy issued per building ($30 R-3 single-family)

See the full Eloy inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's A.R.S. § 9-835 review timeframe table (eloyaz.gov/343/Building-Permits-checklists-and-forms), Residential permits carry a 25-staff-review-day Administrative (Completeness) Review plus a 65-staff-review-day Substantive Review — a 90-staff-review-day overall timeframe; Non-Residential/Subdivision work is longer at 35/95 staff review days.
  • All plan submittals must be electronic PDF (flattened layers, AutoCAD SHX text removed), black-and-white, on 11x17, 24x36, or 30x40 sheet sizes, oriented horizontally — non-compliant submittals are returned as Administratively Incomplete.
  • Standard Plans are valid only while the City is enforcing the same code edition under which the plan was originally approved — confirm current-cycle validity before relying on a previously-approved Standard Plan.
  • A Pinal County Dust Control Permit (separate from the City building permit) is required for earthmoving disturbing more than ~1,690 sq ft, since Eloy sits in the West Pinal Nonattainment Area.

Frequently asked questions

Eloy requires a residential building permit (new construction) for: Building permit required for new single-family and two-family dwelling construction within Eloy city limits; Plans must comply with the 2018 IRC/IBC/IECC and City of Eloy amendments, including Climatic and Geographic Design Criteria (115 mph wind; Seismic Design Category B; 34°F winter design temperature; heavy termite potential; 12-inch minimum foundation/footing depth; 0-inch frost line depth); Construction documents (cover sheet, site plan, foundation plan, floor plan, framing plans, elevations, sections, mechanical/electrical/plumbing plans, structural calculations) must be sealed by an Arizona-registered engineer or architect where required and submitted as flattened PDFs (50 MB max per file); Water Availability Letter required from Public Works prior to submittal; Right-of-Way/On-Site Civil Permit required separately if within 400 feet of a public water/wastewater line; Pinal County Dust Control Permit required for earthmoving activity disturbing more than approximately 1,690 sq ft (City of Eloy is in the West Pinal Nonattainment Area); Copy of approved Eloy Fire District Permit required as part of the submittal; 16 SEER minimum air conditioning efficiency and 78%/80% AFUE minimum gas heating efficiency (weatherized/non-weatherized) required per City-amended IECC criteria; Solar-ready zone (minimum 300 sq ft / 10% of roof area) and electrical panel reserved space for future solar required on new construction. If your project isn't listed, confirm with City of Eloy Community Development Department — Building Safety Division at 520-466-2578 before starting work.

In Eloy, the published Building Permit Fee — Residential Minimum ($1-$500 valuation) is: $60.00. Additional published fees: Building Permit Fee — $500.01 to $2,000 — $60.00 for the first $500.00 plus $4.45 for each additional $100.00 or fraction thereof, to and including $2,000.00; Building Permit Fee — $2,000.01 to $40,000 — $126.75 for the first $2,000.00 plus $15.00 for each additional $1,000.00 or fraction thereof, to and including $40,000.00; Building Permit Fee — $40,000.01 to $100,000 — $696.75 for the first $40,000.00 plus $12.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00; Building Permit Fee — $100,000.01 to $500,000 — $1,416.75 for the first $100,000.00 plus $7.85 for each additional $1,000.00 or fraction thereof, to and including $500,000.00; Building Permit Fee — $500,000.01 to $1,000,000 — $4,556.75 for the first $500,000.00 plus $6.60 for each additional $1,000.00 or fraction thereof, to and including $1,000,000.00; Building Permit Fee — over $1,000,000 — $7,856.75 for the first $1,000,000.00 plus $5.10 for each additional $1,000.00 to $5,000,000.00; $27,614.41 for the first $5,000,000.00 plus $4.00 per additional $1,000.00 above that; Residential Standard Plan Review (Standard Plans valid only while the City uses the same building code under which the plan was approved) — $1,200.00 plus the Building Permit Plan Review Fee; Plan Review Fee (general) — 65% of the calculated Building Permit Fee; Certificate of Occupancy — R-3 single-family — $30.00 per building. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the City of Eloy's A.R.S. § 9-835 review timeframe table, Residential permits carry a 25-staff-review-day Administrative Completeness Review plus a 65-staff-review-day Substantive Review, for an overall timeframe of 90 staff review days. Non-Residential/Subdivision work carries a longer 35/95-day timeframe.

You'll need: City of Eloy Building Permit Application; 2018 International Residential Code Minimum Submittal Checklist (One- and Two-Unit Residential Plans); Water Availability Letter; Soils Report. Depending on your project, Eloy may also ask for: Property Owner Authorization. See the required-documents checklist on this page for details on each.

Eloy requires 4 inspection(s) for a residential building permit (new construction), in order: Foundation/Footing, Framing, Rough Mechanical/Electrical/Plumbing, Final / Certificate of Occupancy. Schedule each through City of Eloy Community Development Department — Building Safety Division (520-466-2578).

Apply through City of Eloy Community Development Department — Building Safety Division at 595 N. C Street, Suite 102, Eloy, AZ 85131. Phone: 520-466-2578, email: Inspections@EloyAZ.gov. Office hours: Monday - Friday, 8 a.m. - 5 p.m. Building/electrical/mechanical/plumbing permit applications and Right-of-Way/On-Site Civil Permit applications are submitted electronically through the City's iworq permit portal (eloypermits.portal.iworq.net); plan submittals must be PDF format, layers flattened, 50 MB maximum file size. Inspection Line: 520-464-3179. Permit Technicians: Chris Encisco (cencisco@eloyaz.gov), Nadine Diaz (ndiaz@eloyaz.gov).. Official information: https://eloyaz.gov/138/Building-Safety.

Eloy, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. § 9-802, adoption of public records/technical codes by reference). The City of Eloy independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division under Chapter 5 (Building Regulations) of the Eloy City Code; it does not defer permitting to Pinal County. Source: City of Eloy Ordinance No. 20-900 (adopted December 14, 2020), adopting the City of Eloy Building Code pursuant to A.R.S. § 9-802; Eloy City Code § 5-3, Adoption of Codes.; 2018 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-3 and § 5-8, Amendments to the 2018 International Building Code). Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025), Part II.; 2018 International Residential Code (IRC), as published by the International Code Council, adopted by reference with City of Eloy amendments (Eloy City Code § 5-9, Amendments to the 2018 International Residential Code). Governs one- and two-family dwelling construction. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/22/2025-01/27/2025).; 2018 International Energy Conservation Code (IECC), adopted by reference with City of Eloy amendments; governs residential energy compliance (prescriptive, UA trade-off/RES-check, or performance path). Minimum HVAC efficiencies published by the Building Safety Division: 16 SEER minimum for air conditioning equipment (R403.3.1.2.1 amended, stricter than the unamended IECC baseline), 78% AFUE minimum for weatherized gas heating equipment and 80% AFUE for non-weatherized equipment. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part II §§ X.g-X.h and XV.a.; 2018 International Existing Building Code (IEBC), adopted and amended by the Mayor and Council of the City of Eloy; applies to reconstruction, alteration, relocation, enlargement, replacement, repair, equipment, use/occupancy, and demolition of existing buildings or structures. Source: City of Eloy Ordinance No. 20-900.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference; swimming pool/spa barrier and enclosure/safety-device requirements administered consistent with Arizona Revised Statutes § 36-1681, as amended. Source: City of Eloy Ordinance No. 20-900; City of Eloy 2018 IRC Minimum Submittal Checklist, Part II § I.y.; 2018 International Fire Code (IFC), enforced by the Eloy Fire District for fire sprinkler and life-safety requirements; a copy of the approved Eloy Fire District Permit is a required submittal item for residential building permits. Source: City of Eloy 2018 International Residential Code Minimum Submittal Checklist (rev. 01/27/2025), Part III item 23.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association (NFPA 70), adopted by reference with City of Eloy amendments (note: electrical code cycle is one edition behind the 2018 ICC set). Source: City of Eloy Building Safety Division page (eloyaz.gov/138/Building-Safety); City of Eloy Ordinance No. 20-900.; City of Eloy Code, Chapter 5 (Building Regulations), including § 5-3 (Adoption of Codes), § 5-5 (Building Code Administration), § 5-8 (Amendments to the 2018 International Building Code), and § 5-9 (Amendments to the 2018 International Residential Code) — the operative local amendment layer over the adopted ICC model codes. Copies of all amendments are kept on file with the City Clerk and the Community Development Department. Source: Eloy, AZ Code of Ordinances (codelibrary.amlegal.com/codes/eloyaz).; Manufactured/factory-built homes and park models are regulated by the State of Arizona Department of Housing for construction/installation standards and licensing (permit fees for mobile homes are adopted from and updated annually by the State of Arizona Department of Housing); the City of Eloy separately charges local hook-up fees (sewer, water, electrical connections) for site placement. Source: City of Eloy Amended 2025-2026 Consolidated Rate and Fee Schedule (effective February 16, 2026), Mobile Home Licensing Fees and Mobile Home hook-up sections.. Local amendments apply — see the Eloy overview page for the full list.

The 2018 IRC (and 2018 IBC for non-residential portions) and 2018 IECC, as adopted and amended by the City of Eloy under Ordinance No. 20-900 (effective December 14, 2020) and Chapter 5 of the Eloy City Code, plus the 2017 NEC for electrical work.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Eloy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.