Certificate of Occupancy / Change of Use — Clarkdale, Arizona · Requirements sheet
Reviewed 2026-07-23 · Source: https://www.clarkdale.az.gov/179/Building-Division
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Certificate of Occupancy / Change of Use in Clarkdale, Arizona
The Town of Clarkdale has no stand-alone 'Change of Use Permit' or 'Certificate of Occupancy' application or fee product separate from its standard Building Permit process -- confirmed by inspecting the Town's own Building Permit Application, whose project-type checkboxes (Residential, Commercial, Accessory Structure, Deck, Demolition, Electrical, Fence, Fence Masonry, Grading, Manufactured Home, Mechanical, New Construction, Plumbing, Re-Roof, Remodel, Solar Electric, Solar Water, Swimming Pool, Temp. Use, Other) include no 'Change of Use' or 'Certificate of Occupancy' option. A change of occupancy/use in an existing building is instead processed as a standard Building Permit (Commercial and/or Remodel) governed by the Town's adopted 2024 International Existing Building Code (IEBC, Town Code Article 7-8), with a Certificate of Occupancy issued under the Town's adopted-by-reference (and locally unamended) 2024 IBC Section 111 following a final inspection. Separately, the Verde Valley Fire District charges its own distinct, named fee for a commercial change-of-use scenario.
Reviewed 2026-07-23 · Source
When you need this permit
- No standalone Change of Use or Certificate of Occupancy application/fee exists -- confirmed against the Town's Building Permit Application (DocumentCenter View 1154), whose 'TYPE OF PROJECT' section lists no such checkbox; a change of use is applied for as a Commercial and/or Remodel building permit.
- Town Code Article 7-1 (IBC), Section 101.4.7 (amended): 'The provisions of the 2024 Edition of the International Existing Building Code, as amended and adopted by Town of Clarkdale, shall apply to the repair, change of occupancy, and relocation of existing buildings and structures.' The 2024 IEBC is separately adopted by reference as Town Code Article 7-8, which itself states it governs 'the repair, alteration, change of occupancy, addition and relocation of existing buildings, including historic buildings.'
- Town Code Article 7-1, Section 110.3.17 (amended Final Inspection): 'Final inspection shall be made after all permitted work is completed and prior to occupancy. Final approvals from all other departments and agencies must be completed prior to scheduling a final inspection.' No amendment to IBC Section 111 (Certificate of Occupancy) itself was found in Article 7-1's amendment list, indicating the stock 2024 IBC Section 111 CO-issuance requirement applies as adopted by reference, without local modification.
- A change of use/occupancy that the Fire Official determines creates a greater fire or life-safety hazard (per Table A) can trigger a sprinkler-retrofit requirement even in an existing building that would otherwise be exempt from sprinklers -- Town Code Article 7-1 amendments to IBC Chapter 9 (Fire Protection Systems).
- The Verde Valley Fire District (VVFD), which independently administers fire-code review in Clarkdale, DOES charge a distinct, named fee for this exact scenario: 'Tenant Improvement w/Change of Use (Commercial) (plan review and 1 inspection) -- $250,' per VVFD's Fee Schedule (Resolution #2025-12, adopted 9/23/2025).
- Occupancy classification and use code are recorded by the Building Official in the permit's office-use-only fields (PARCEL NUMBER, ZONING, OCCUPANCY, CONST. TYPE, USE CODE) on the standard Building Permit Application.
- Certificate of Occupancy is a real, referenced gating mechanism elsewhere in Clarkdale's own Zoning Code -- e.g., the Manufactured Home Residential (R4) and Manufactured Home Residential Alternate (R4A) zoning district provisions state that 'no certificate of occupancy or business license shall be issued unless and until' specified district standards are met.
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection
Made after all permitted work is completed and prior to occupancy, per Town Code Article 7-1's amended Section 110.3.17; a Certificate of Occupancy is then issued under the Town's adopted (and locally unamended) 2024 IBC Section 111.
- 2
VVFD Fire Plan Review & Inspection (if applicable)
Required for a commercial tenant improvement involving a change of use, per the Verde Valley Fire District Fee Schedule's 'Tenant Improvement w/Change of Use (Commercial)' line item.
See the full Clarkdale inspection guide — scheduling & re-inspection fees →
Tips
- Clarkdale has no distinct 'Change of Use Permit' or 'Certificate of Occupancy Permit' product -- a change of occupancy/use is processed through the Town's standard Building Permit Application (checking Commercial and/or Remodel), governed by the 2024 IEBC (Article 7-8).
- The Verde Valley Fire District, which independently reviews fire-code compliance in Clarkdale, DOES charge a distinct, named $250 fee specifically for a 'Tenant Improvement w/Change of Use (Commercial)' -- budget for this separately from the Town's building-permit fee.
- A change of use that the Fire Official determines creates a greater fire or life-safety hazard can trigger a sprinkler retrofit requirement even in an existing building that would otherwise be sprinkler-exempt (Town Code Article 7-1 amendments to IBC Chapter 9).
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clarkdale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Clarkdale
Certificate of Occupancy / Change of Use in other cities
Compare certificate of occupancy / change of use fees across Arizona →
Look up this fee in a different city →
Now live
Build your Clarkdale project checklist
Describe your project once and get every permit, document, and fee it triggers in Clarkdale — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →