Skip to main content
PermitBase

Electric Vehicle (EV) Charger / EVSE Permit in Clarkdale, Arizona

The Town of Clarkdale has no dedicated EV charger/EVSE permit type -- confirmed against the Town's Building Division page and Forms page, which lists a 'Solar Permit Checklist' as a live document title (per the sibling solar-pv-permit entry in this file) but no corresponding EV/EVSE checklist or line item. An EVSE circuit installation is required to be permitted as standard electrical work, governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Article 7-5).

Reviewed 2026-07-20 · Source

When you need this permit

  • Electrical permit required for EVSE circuit installation, alteration, or repair work in the Town of Clarkdale
  • Governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Article 7-5), with narrow exemptions for minor/like-for-like work
  • No EV-charger-specific checklist, application, or fee line item was located, unlike the Town's published 'Solar Permit Checklist'

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit Fee -- Based on ValuationThe Town's underlying itemized electrical fee schedule (per-fixture/per-service dollar amounts) was not independently located in this review beyond the general valuation-based methodology confirmed in the Notice of Intention to Amend the Townwide Fee Schedule -- confirmed gap, not an assumption. No EV/EVSE-specific fee line was found. Re-chased exhaustively on 2026-07-20: confirmed via news coverage (Signals AZ, 'Townwide Fee Changes in Clarkdale') that the Town DID publish proposed Townwide Fee Schedule adjustments via a Civic Alert, but the Town's own DocumentCenter, Forms page, Codes & Plans page, Civic Alert detail page, and Building Permit Application PDF all returned HTTP 403 to direct fetch on this pass (a domain-wide bot-blocking pattern, not a missing-document gap); a Wayback Machine lookup for the same pages was also blocked. Confirmed the fee schedule document exists and is real, but the specific dollar figures could not be independently extracted in this pass -- contact Community Development at 928-639-2500 or visit 890 Main Street for the current itemized amount.
Calculated from ICC Building Safety Journal square-foot construction-cost tables / Table 1-A methodology, or itemized per the Town's fee schedule

Review timeline

Plan review
Not published — contact the department

How long did your Electric Vehicle (EV) Charger / EVSE Permit permit actually take in Clarkdale?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical Inspection

    Town electrical inspection of the EVSE circuit and connection

See the full Clarkdale inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike solar PV, which has a published 'Solar Permit Checklist,' Clarkdale has no equivalent EV/EVSE checklist -- apply using the Town's standard Electrical Permit Application and confirm the exact fee with the Building Division directly.

Frequently asked questions

Clarkdale requires an electric vehicle (ev) charger / evse permit for: Electrical permit required for EVSE circuit installation, alteration, or repair work in the Town of Clarkdale; Governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Article 7-5), with narrow exemptions for minor/like-for-like work; No EV-charger-specific checklist, application, or fee line item was located, unlike the Town's published 'Solar Permit Checklist'. If your project isn't listed, confirm with Town of Clarkdale Community Development Department — Building Safety Unit (Building Division) at 928-639-2500 before starting work.

No. Clarkdale has no dedicated EV/EVSE permit checklist or fee line, unlike its published Solar Permit Checklist. An EVSE circuit is billed as standard electrical work under the Town's valuation-based Electrical Permit fee.

Clarkdale does not publish a plan-review timeline for this permit. Contact Town of Clarkdale Community Development Department — Building Safety Unit (Building Division) at 928-639-2500 for current turnaround.

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Clarkdale requires 1 inspection(s) for an electric vehicle (ev) charger / evse permit, in order: Electrical Inspection. Schedule each through Town of Clarkdale Community Development Department — Building Safety Unit (Building Division) (928-639-2500).

Apply through Town of Clarkdale Community Development Department — Building Safety Unit (Building Division) at 890 Main Street, Clarkdale, AZ 86324 (mail: PO Box 308, Clarkdale, AZ 86324). Phone: 928-639-2500, email: communitydevelopment@clarkdale.az.gov. Office hours: Community Development Department: Monday - Thursday, 8:00 a.m. to 5:30 p.m.; Friday, 8:00 a.m. to 12:00 p.m. Building permit applications are mailed or emailed to communitydevelopment@clarkdale.az.gov, or submitted in person at 890 Main Street. Inspection requests must be made 24 hours in advance by calling 928-639-2500 or emailing inspections@clarkdale.az.gov; the Building Official can be reached directly for application questions.. Official information: https://www.clarkdale.az.gov/179/Building-Division.

Clarkdale, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Clarkdale independently created and administers its own Community Development Department / Building Safety Unit under Town Code Chapter 7 (Building), which adopts and amends its own construction codes; it does not defer permitting to Yavapai County. Source: Town of Clarkdale Building Division page (clarkdale.az.gov/179/Building-Division) and Town of Clarkdale Building Permit Application (communitydevelopment@clarkdale.az.gov, PO Box 308, Clarkdale, AZ 86324), which names a dedicated Building Official (Bob Pipkin, bob.pipkin@clarkdale.az.gov) and a Town-specific permit fee/valuation structure.; 2024 International Building Code (IBC), including Appendices B, C, D, E, F, G, H, I, J, K, N, O and P as published by the International Code Council, adopted by reference as Town Code Article 7-1, with Town of Clarkdale amendments. The Building Division's own page (as of this review) still describes the 2018 ICC codes/2017 NEC as the 'recently adopted' set, but the Town's own current Article 7-1 ordinance text (retrieved directly, Town of Clarkdale Ordinance amending Chapter 7) confirms the 2024 IBC is now the adopted and currently governing edition — a June 1, 2026 Building and Fire Code update was separately reported in Town news channels. Source: Town of Clarkdale Town Code Article 7-1, International Building Code (IBC), official PDF (clarkdale.az.gov/DocumentCenter/View/2516).; 2024 International Residential Code (IRC) for One- and Two-Family Dwellings, adopted by reference as Town Code Article 7-2, with Town of Clarkdale amendments (e.g., Section R105.2 exempt-work list; Seismic Design Category C per amended R301.2.2.1). Source: Town of Clarkdale Town Code Article 7-2, International Residential Code (IRC), official PDF (clarkdale.az.gov/DocumentCenter/View/2517).; 2024 International Plumbing Code (IPC), including Appendices B, C, D, E and F, adopted by reference as Town Code Article 7-3, with Town of Clarkdale amendments. Source: Town of Clarkdale Town Code Article 7-3, official PDF (clarkdale.az.gov/DocumentCenter/View/2518).; 2024 International Mechanical Code (IMC), including Appendices A, C, D, and E, adopted by reference as Town Code Article 7-4, with Town of Clarkdale amendments. Source: Town of Clarkdale Town Code Article 7-4, official PDF (clarkdale.az.gov/DocumentCenter/View/2519).; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference as Town Code Article 7-5 (one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag); Article 90.1(E)(1) cross-references Chapter 1 of the 2024 IRC/IBC for permit administration and fee collection procedures. Source: Town of Clarkdale Town Code Article 7-5, official PDF (clarkdale.az.gov/DocumentCenter/View/2509).; 2024 International Fuel Gas Code (IFGC), including Appendices A, B, C and D, adopted by reference as Town Code Article 7-6, with Town of Clarkdale amendments. Source: Town of Clarkdale Town Code Article 7-6, official PDF (clarkdale.az.gov/DocumentCenter/View/2510).; International Fire Code, 2012 Edition plus Appendix D, adopted as part of Town Code Chapter 7 (Building); the Verde Valley Fire District administers this code on behalf of the Town rather than the Building Division directly. Source: Town of Clarkdale Building Division page (clarkdale.az.gov/179/Building-Division).; 2024 International Existing Building Code (IEBC), including Appendices A, B, C, D and E, adopted by reference as Town Code Article 7-8, with Town of Clarkdale amendments (governs repair, alteration, change of occupancy, addition, relocation, and demolition of existing buildings — one- and two-family dwellings and townhouses up to 3 stories may alternatively comply with the IRC). Source: Town of Clarkdale Town Code Article 7-8, official PDF (clarkdale.az.gov/DocumentCenter/View/2512).; 2018 International Energy Conservation Code (IECC), adopted by reference in Town Code Article 7-9 and cross-referenced throughout the IBC/IRC amendments (e.g., Section 110.3.9/R109.1.6 energy-efficiency inspections cite 'Chapter 13 of the 2018 IECC') — NOT advanced to the 2024 edition alongside the other ICC codes, mirroring the same one-edition-behind pattern seen in neighboring Yavapai County jurisdictions (e.g., Cottonwood). Source: Town of Clarkdale Town Code Article 7-1 (IBC) Section 101.4.6 and Article 7-2 (IRC) energy-inspection sections, official PDFs.; 2012 International Property Maintenance Code (IPMC), adopted as Town Code Article 7-20. Source: Town of Clarkdale Building Division page (clarkdale.az.gov/179/Building-Division).; International Swimming Pool and Spa Code (ISPSC), adopted as Town Code Article 7-22 (edition not independently confirmed in this review). Source: Town of Clarkdale Community Development page document list (clarkdale.az.gov/178/Community-Development).; 2017 ICC A117.1 Accessible and Usable Buildings and Facilities standard, plus the 2010 ADA Standards (Title II regulations at 28 CFR 35.15 and Title III regulations at 28 CFR 36 subpart D, both referencing the 2004 ADAAG at 36 CFR part 1191, Appendices B and D), adopted as an amendment to IBC Chapter 11 / Section 1102.1 (Design). A separate IRC Chapter 11 (Accessibility) amendment in Article 7-1 deletes that chapter in its entirety for one- and two-family work. Source: Town of Clarkdale Town Code Article 7-1 (IBC), Section 1101/1102 amendments, official PDF.; Manufactured housing is separately regulated under Town Code Article 7-13 (Manufactured Housing Standards), which includes its own Manufactured Home Building Permit section (7-13-2); the Building Permit Application lists 'Manufactured Home' as a distinct project type. The full text of Article 7-13 could not be retrieved in this review (it is not mirrored on the Town's ordinances/DocumentCenter page alongside the ICC-code articles, and the third-party town.codes mirror blocked automated access) — treated as a confirmed gap rather than an assumption. Source: Town of Clarkdale Building Permit Application (clarkdale.az.gov/DocumentCenter/View/1154); Town Code table of contents (Article 7-13).. Local amendments apply — see the Clarkdale overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Clarkdale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.