Mechanical / HVAC Permit — Golden, Colorado · Requirements sheet
Verified 2026-07-05 · Source: https://www.cityofgolden.gov/business/building_construction/required_building_permits_guide.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in Golden, Colorado
Required for heating, cooling, ventilation, and fuel-gas equipment installation or replacement in Golden. Governed by the 2024 International Mechanical Code (IMC) as locally adopted.
Verified 2026-07-05 · Source
When you need this permit
- Permit required for: Air Conditioning Units, Attic Fans (whole house), Boiler Installation or Replacement, Furnace Installation or Replacement, Gas Logs Installation or Replacement, Swamp Coolers, Water Heater Installation or Replacement — per the Required Building Permits Guide
- Governed by the 2024 IMC as adopted by the City
- Contractors must hold applicable state licensure (where required) plus a City of Golden Contractor License Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Building Permit Fee Table, Effective 05/01/11 (Resolution #1097/#1648/#2121), Additional Fees item 3 (Plan Review Fees, 65% of Permit Fees) with footnote ** waiving the separate sub-permit plan… Show full citationHide
Building Permit Fee Table, Effective 05/01/11 (Resolution #1097/#1648/#2121), Additional Fees item 3 (Plan Review Fees, 65% of Permit Fees) with footnote ** waiving the separate sub-permit plan review fee when the sub-permit valuation is included in the total building permit valuationReview timeline
Inspection process
- 1
Rough Heating
Requested once all ductwork, flues, heating, hot water, and refrigeration lines are installed but not yet covered or concealed
- 2
Final Inspection
Equipment operational; combustion air and venting verified
See the full Golden inspection guide — scheduling & re-inspection fees →
Tips
- Furnace, boiler, and water heater replacements are each individually listed as requiring a permit in Golden's Required Building Permits Guide — don't assume like-for-like equipment swaps are exempt.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-05.
Fee schedules
Checklists & handouts
Online permit portal
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Golden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Golden's permit history is searchable by address
1,439 permits on record for Golden, 2026–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
83% of Golden's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Golden
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Golden project checklist
Describe your project once and get every permit, document, and fee it triggers in Golden — in one checklist. Free, for any city and any number of projects.
Get started →