Plumbing Permit — Golden, Colorado · Requirements sheet
Verified 2026-07-05 · Source: https://www.cityofgolden.gov/business/building_construction/building_permit.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Golden, Colorado
Required for installation, alteration, or repair of plumbing systems in Golden. Governed by the 2024 International Plumbing Code (IPC) plus Appendix CD (Piping Standards for Various Applications). Plumbing contractors must hold a Colorado Plumbing Board (DORA) state license AND a separate City of Golden Contractor License.
Verified 2026-07-05 · Source
When you need this permit
- Permit required for plumbing installation, alteration, or repair, including water heater installation/replacement (listed separately under Interior Projects in the Required Building Permits Guide) and gas piping
- Golden uses the IPC, not the Uniform Plumbing Code (UPC)
- Contractors must hold a current Colorado Plumbing Board (DORA) license AND a City of Golden Contractor License Contractor
- Lawn Sprinkler connection to the water supply (backflow) requires a permit, per the Required Building Permits Guide
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Building Permit Fee Table, Effective 05/01/11 (Resolution #1097/#1648/#2121), Additional Fees item 3 (Plan Review Fees, 65% of Permit Fees) with footnote ** waiving the separate sub-permit plan… Show full citationHide
Building Permit Fee Table, Effective 05/01/11 (Resolution #1097/#1648/#2121), Additional Fees item 3 (Plan Review Fees, 65% of Permit Fees) with footnote ** waiving the separate sub-permit plan review fee when the sub-permit valuation is included in the total building permit valuationReview timeline
Inspection process
- 1
Rough Plumbing
Requested after plumbing pipes are installed; underground plumbing, drains, vents, and water piping may be inspected together or separately
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
See the full Golden inspection guide — scheduling & re-inspection fees →
Tips
- Golden follows the IPC, not the UPC — verify fixture-unit and pipe-sizing calculations against IPC tables if you're used to a UPC jurisdiction.
- As with electrical, a state DORA plumbing license alone does not let a contractor pull permits in Golden — the separate City Contractor License is required. Contractor
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-05.
Fee schedules
Checklists & handouts
Online permit portal
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Golden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Golden's permit history is searchable by address
1,439 permits on record for Golden, 2026–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
83% of Golden's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Golden
Plumbing Permit in other cities
Compare plumbing permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Golden project checklist
Describe your project once and get every permit, document, and fee it triggers in Golden — in one checklist. Free, for any city and any number of projects.
Get started →