EV Charger / Electric Vehicle Charging Station Permit — Golden, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.cityofgolden.gov/business/building_construction/required_building_permits_guide.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / Electric Vehicle Charging Station Permit in Golden, Colorado
Installing a Level 2 (240V) home or commercial EV charging circuit in Golden requires a City of Golden Electrical Permit -- confirmed via the City's own Required Building Permits Guide, which lists 'Electrical Modifications' among Interior Projects that require a permit. Like solar PV, there is no EV-specific application, fee schedule, or checklist published; an EV charger circuit is billed under the same valuation-based Building Permit Fee Table used for standalone electrical work generally ($25.85 minimum).
Verified 2026-07-20 · Source
When you need this permit
- 'Electrical Modifications' are listed as a Permit-Required Interior Project on the City's Required Building Permits Guide -- a new dedicated EV charger circuit falls under this category
- Electrical contractors must hold a current Colorado Electrical Board (DORA) state license AND a separate City of Golden Contractor License (Municipal Code Chapter 15.01) before a permit can be issued Contractor
- No EV-specific application, checklist, or fee schedule is published on the City's Solar Energy Systems page, Required Building Permits Guide, or Building Permit Process page; applicants follow the standard building/electrical permit path via the Accela Citizen Access online permitting portal
- If the electrical work is bundled into a larger building permit's total valuation (e.g., part of a garage remodel), a separate sub-permit plan review fee is avoided per the fee table's footnote
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Requested once wiring is installed and any new panel/circuit work is completed, before concealment
- 2
Final Inspection
New circuit, breaker sizing, and disconnect (if required) verified before the charger is energized
See the full Golden inspection guide — scheduling & re-inspection fees →
Tips
- Golden's Required Building Permits Guide has no EV-charger-specific listing, but 'Electrical Modifications' is explicitly listed as a permit-required Interior Project -- a new dedicated EV charger circuit falls under this general category.
- Golden requires its OWN Contractor License in addition to the statewide DORA electrical license -- do not assume a valid state license alone is sufficient to pull an EV charger permit in Golden. Contractor
- Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, 2024) requires municipalities of 10,000+ population (which includes Golden, population approx. 20,700 per the 2020 Census) to take a compliance action by December 31, 2025 regarding LAND USE permitting standards for public/commercial EV charging stations -- this affects site-plan/land-use review for public charging installations, not the standard residential electrical permit described here. Confirm with the Planning Division which compliance path (if any) Golden adopted for commercial/public charging projects.
- If the EV charger installation is bundled into a larger remodel's building permit valuation, you avoid a separate sub-permit plan review fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Golden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Golden
EV Charger / Electric Vehicle Charging Station Permit in other cities
Compare ev charger / electric vehicle charging station permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Golden project checklist
Describe your project once and get every permit, document, and fee it triggers in Golden — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →