Roofing Permit (Re-Roof / Re-Shingle) in Morrison, Colorado

Required for re-roofing (re-shingle) work in Morrison. Governed by the 2015 IRC/IBC as adopted; billed as a flat Single Stop Fee rather than the full valuation-based Building Permit Fee when the scope is a standalone re-roof.

Verified 2026-07-06 · Source

When you need this permit

  • Governed by the 2015 IRC/IBC as adopted by Morrison Municipal Code Section 9-1-2
  • A standalone re-roof (re-shingle) qualifies for the Town's flat Single Stop Fee rather than the full valuation-based Building Permit Fee
  • Roof plan/material specifications would be expected as part of the permit application, consistent with the Structural and Architectural Details category (roof, eaves, overhangs, rake, gables) in the general Residential Plans Submittal Check List for projects where roofing is part of a larger scope

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Single Stop Fee — Roof (re-shingle)Resolution 2025-13, Section B, Single Stop Fees list
$100.00

Review timeline

Plan review
Not published — contact the department

How long did your Roofing Permit (Re-Roof / Re-Shingle) permit actually take in Morrison?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (roof)

    Completed roof — material and flashing/valley compliance verified

See the full Morrison inspection guide — scheduling & re-inspection fees →

Tips

  • A standalone re-shingle project bills as Morrison's flat Single Stop Fee ($100.00) rather than the full valuation-based Building Permit Fee — confirm with the Building Department that your project qualifies as a standalone re-roof rather than a larger structural re-roof (e.g., changing roof structure/pitch), which would likely require the full building-permit process instead.

Frequently asked questions

Morrison requires a roofing permit (re-roof / re-shingle) for: Governed by the 2015 IRC/IBC as adopted by Morrison Municipal Code Section 9-1-2; A standalone re-roof (re-shingle) qualifies for the Town's flat Single Stop Fee rather than the full valuation-based Building Permit Fee; Roof plan/material specifications would be expected as part of the permit application, consistent with the Structural and Architectural Details category (roof, eaves, overhangs, rake, gables) in the general Residential Plans Submittal Check List for projects where roofing is part of a larger scope. If your project isn't listed, confirm with Town of Morrison Building Department at 303-697-8749 before starting work.

A standalone re-shingle project is billed at a flat $100.00 Single Stop Fee per Resolution 2025-13, rather than the full valuation-based Building Permit Fee that applies to new construction or additions.

Morrison does not publish a plan-review timeline for this permit. Contact Town of Morrison Building Department at 303-697-8749 for current turnaround.

You'll need: Morrison Building Permit Application — Re-Roof scope. See the required-documents checklist on this page for details on each.

Morrison requires 1 inspection(s) for a roofing permit (re-roof / re-shingle), in order: Final Inspection (roof). Schedule each through Town of Morrison Building Department (303-697-8749).

Apply through Town of Morrison Building Department at 321 Highway 8, Morrison, CO 80465 (Town Hall); Building Department contract administration address listed as 4704 Harlan St, Suite 684, Lakeside, CO 80212. Phone: 303-697-8749, email: building@morrisonco.us. Office hours: Monday - Friday, 8:30 AM - 4:30 PM (Town of Morrison general hours, per website footer). Inspection requests must be submitted by 4:00 PM on the business day prior to the requested inspection date via the Town's online scheduling form.. Official information: https://www.morrisonco.us/140/Building-Department.

Morrison, Colorado has adopted: 2015 International Building Code (IBC), chapters 1-35 inclusive and appendix chapter I — Morrison Municipal Code Section 9-1-2 (Codes Adopted By Reference), current through 2026 S-15 supplement; 2015 International Residential Code (IRC), chapters 1-44 inclusive and appendix chapter H — Section 9-1-2; 2015 International Mechanical Code (IMC), chapters 1-15 inclusive — Section 9-1-2; 2015 International Fuel Gas Code (IFGC), chapters 1-8 inclusive — Section 9-1-2; 2015 International Plumbing Code (IPC), chapters 1-15 inclusive — Section 9-1-2; 2015 International Fire Code (IFC), chapters 1-80 inclusive — Section 9-1-2; 2015 International Energy Conservation Code (IECC), Residential and Commercial chapters 1-6 — Section 9-1-2; 2015 International Existing Building Code (IEBC), chapters 1-16 inclusive with all appendices — Section 9-1-2; 2015 International Swimming Pool and Spa Code, chapters 1-11 inclusive with all appendices — Section 9-1-2; 2015 International Property Maintenance Code, chapters 1-8 inclusive with all appendices — Section 9-1-2; National Electrical Code (NEC), 'the most current edition adopted by the Colorado State Electrical Board, Department of Regulatory Agencies' — Morrison's own code text ties its NEC edition to whichever edition the Colorado State Electrical Board (DORA) currently has in force, rather than fixing a specific year itself; as of this review the Colorado State Electrical Board's currently adopted edition is the 2023 NEC (per DORA Division of Professions and Occupations rules), so 2023 NEC is the effective edition in Morrison, subject to change automatically if DORA updates its adopted edition; Colorado Wildfire Resiliency Code, 2025 edition, adopted and published by the Wildfire Resiliency Code Board within the Division of Fire Prevention and Control, Colorado Department of Public Safety — adopted by reference as the Town of Morrison wildfire resiliency code (Section 9-1-2, subsection M); HB22-1362 (Colorado statewide building greenhouse-gas-emissions / energy code law) note: HB22-1362 only obligates a municipality or county to adopt an equivalent-or-better energy code WHEN it next updates one or more of its building codes — it does not retroactively force an update on jurisdictions that haven't touched their codes. Morrison's adopted energy code is still the 2015 IECC (per Section 9-1-2, unchanged since original codification), so the HB22-1362 floor (2021 IECC-equivalent performance from 7/1/2023-6/30/2026; Model Low Energy and Carbon Code-equivalent performance from 7/1/2026 onward) has NOT yet been triggered for Morrison because the Town has not updated its building code since adopting the 2015 cycle. This is a genuine, current compliance gap/lag relative to HB22-1362's intent, not an omission by this file — confirmed against the Colorado Energy Office's published HB22-1362 timeline.. Local amendments apply — see the Morrison overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Morrison building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.