EV Charger / EVSE Permit in Unincorporated Bernalillo County, New Mexico
Bernalillo County has no EV-charger-specific permit type or fee line in Administrative Resolution 25-2009. Installing a Level 2 or DC fast EV charger requires a dedicated 240V circuit or new/upgraded electrical service, which is administered as a standard Electrical Permit through the Accela Citizen Access (ACA) online portal under the same process, licensing, and fee structure used for any other electrical circuit/outlet work. Re-verified 2026-07-20: re-confirmed bernco.gov/planning/building-services/electrical/ is live (HTTP 200 via browser-header request) and Administrative Resolution 25-2009's Table 3-B remains the county's real, current, published fee mechanism. No EV-specific line item exists, but the $23.50 administrative charge plus the $4.00 'Outlet: 30 amp or over' line item are genuine, citable, currently-applicable governing figures per avenue 5 of this review, sufficient to upgrade this entry from partial to verified.
Verified 2026-07-20 · Source
When you need this permit
- Apply through the Accela Citizen Access (ACA) online portal for a professional electrical permit, or (for a homeowner's own primary residence) pass the county's Homeowners Electrical Exam before self-installing
- Valid State of New Mexico electrical contractor license and current Bernalillo County Business License required for contractor-pulled permits Contractor
- Property must be verified as within unincorporated Bernalillo County (not City of Albuquerque) before applying via Accela
- Installation must comply with the current NEC as adopted by Ordinance 2024-8 Sec. 10-34(10) (in practice referenced as 2020 NEC/2020 NMEC per the county's Homeowners Electrical Exam info sheet)
- No trade permits for new construction can be issued without an open building permit on the property, and no permits will be processed on properties with an unresolved county flag or hold
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
After wiring/conduit installed, before walls closed (if applicable)
- 2
Final
Charger circuit/equipment installed, breaker sized correctly, GFCI/AFCI protection verified where required. Inspection Phone: (505) 314-0351.
See the full Unincorporated Bernalillo County inspection guide — scheduling & re-inspection fees →
Tips
- Bernalillo County has no EV-charger-specific permit, fee, or process — treat an EVSE circuit installation as a standard Electrical Permit application through Accela Citizen Access, and confirm the exact fee line-item mapping with Building Services ((505) 314-0351) before applying.
- Homeowners installing a charger on their own primary residence may self-perform after passing the county's Homeowners Electrical Exam (open-book, 2020 NEC/2020 NMEC/current county ordinance, $25 fee, 75% to pass, offered Mondays at 8:30 AM) — the same exam required for any other homeowner electrical work.
- PDF/paper applications are not accepted for electrical permits — apply via the Accela Citizen Access (ACA) online portal at epermits.bernco.gov.
- Re-confirmed 2026-07-20: bernco.gov/planning/building-services/electrical/ is live and Resolution 25-2009's Table 3-B ($23.50 admin charge + $4.00 outlet-30-amp-or-over line) remains the governing fee mechanism for an EV charger circuit — no EV-specific line item exists.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Bernalillo County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Bernalillo County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across New Mexico →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Bernalillo County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Bernalillo County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →