Required for residential and commercial solar PV and solar hot water installations (roof-mounted, ground/pole-mounted) in unincorporated Bernalillo County, per the county's Solar Packet (rev. 2/19/2024). Structural engineering may be exempted for roof-mount systems meeting specific weight/height/attachment criteria.

Verified 2026-07-02 · Source

When you need this permit

  • Rooftop, ground-mounted, or pole-mounted solar PV or solar hot water installation
  • Roof-mount systems: engineering calculations required UNLESS all exception criteria are met — typical residential rafter/truss construction (min. 2x4, max 24 in on-center spacing), single-layer roofing material per IRC Section R905 (excluding clay/concrete tile or slate), panels attached directly or via continuous rails at no more than 4 ft on-center, system weight not exceeding 5 psf or 45 lbs concentrated load per attachment point (200 lbs max per framing member), and maximum panel height 18 inches above the roof surface
  • Ground/pole-mount systems: engineering required if total structure height above grade (to top of panel) exceeds 6 feet
  • Roof-mounted arrays must maintain 3 feet of clearance around the array
  • All installations, markings, signage, and warning labels must comply with the current NEC, state codes, and the Uniform Solar Energy Code

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 4 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Solar Collectors — Related Piping/Ductwork/Regulating Devices (up to 1,000 sq ft)Resolution 25-2009, Table 3-C, Item 20 (tiered: $6.00 for 1,001–2,000 sq ft; $6.00 plus $1.50 per 1,000 sq ft over 2,000 sq ft)
$4.00
Solar Storage Tanks (up to 750 gallons)Resolution 25-2009, Table 3-C, Item 21 (tiered: $4.00 for 751–2,000 gal; $4.00 plus $1.50 per 1,000 gal over 2,000 gal)
$3.00
Solar Rock Storage (up to 1,500 cu ft)Resolution 25-2009, Table 3-C, Item 22 (tiered: $4.00 for 1,501–3,000 cu ft; $4.00 plus $1.50 per 1,000 cu ft over 3,000 cu ft)
$3.00
Building Permit Fee (valuation-based, for the array structure)Resolution 25-2009, Table 3-A — the solar packet's building permit application references 2015 IBC Sec. 108.3/109.3 valuation for setting the fee
$30.00 plus $4.00 per $1,000.00 of valuation

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Bernalillo County building department
~3–10 business days

How long did your Solar Panel Permit permit actually take in Unincorporated Bernalillo County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final/Structural

    Panel mounting, racking attachment, roof penetration weatherproofing, and electrical connections verified

See the full Unincorporated Bernalillo County inspection guide — scheduling & re-inspection fees →

Tips

  • A complete printed submission requires one copy of the site plan and one copy of all other drawings (minimum size 11x17), AND an electronic copy of all documents on CD or flash drive.
  • Roof-mounted arrays can be no more than 10 feet above the roof surface (measured from roof to top of array); the engineering-exception path caps panel height at 18 inches above the roof surface.
  • For commercial solar installations there is no exception to the engineering requirement — all commercial applications must have an engineer's stamp.
  • Battery storage systems must indicate number, size, location, and grounding of batteries on the electrical plan.

Frequently asked questions

Yes, for all residential and commercial roof-mounted, ground-mounted, or pole-mounted solar PV and solar hot water installations, per the county's Solar Packet (rev. 2/19/2024). Engineering may be exempted for roof-mount systems meeting specific weight, spacing, and height criteria.

In Unincorporated Bernalillo County, the published Solar Collectors — Related Piping/Ductwork/Regulating Devices (up to 1,000 sq ft) is: $4.00. Additional published fees: Solar Storage Tanks (up to 750 gallons) — $3.00; Solar Rock Storage (up to 1,500 cu ft) — $3.00; Building Permit Fee (valuation-based, for the array structure) — $30.00 plus $4.00 per $1,000.00 of valuation. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a solar panel permit in Unincorporated Bernalillo County typically runs 3–10 business days. This is an estimate, not a published figure — confirm current review times with Bernalillo County Planning & Development Services — Building Services (Building Safety Division) at (505) 314-0351 (Building Services / Inspection Line); (505) 314-0350 (Planning & Development Services main line / Permitting & Development Center).

You'll need: Building Permit Application (Solar Packet); Site Plan; Solar Array Weight and Loading Calculation Worksheet; Electrical One-Line Diagram. Depending on your project, Unincorporated Bernalillo County may also ask for: Footing Detail; Roof Framing Plan; Engineering Calculations (with PE/architect stamp). See the required-documents checklist on this page for details on each.

Unincorporated Bernalillo County requires 2 inspection(s) for a solar panel permit, in order: Rough Electrical, Final/Structural. Schedule each through Bernalillo County Planning & Development Services — Building Services (Building Safety Division) ((505) 314-0351 (Building Services / Inspection Line); (505) 314-0350 (Planning & Development Services main line / Permitting & Development Center)).

Apply through Bernalillo County Planning & Development Services — Building Services (Building Safety Division) at 415 Silver Ave SW, 2nd Floor, Albuquerque, NM 87102. Phone: (505) 314-0351 (Building Services / Inspection Line); (505) 314-0350 (Planning & Development Services main line / Permitting & Development Center), email: permits@bernco.gov (Building Services); zoning@bernco.gov (Planning & Development Services main). Office hours: Monday–Friday 8:00 AM – 4:30 PM (Building Services page separately lists 8–5 p.m.; the FAQ and Residential Building Packet both confirm 8:00 AM–4:30 PM for permit submittal). Official information: https://www.bernco.gov/planning/building-services/.

Unincorporated Bernalillo County, New Mexico has adopted: Bernalillo County Building Ordinance, Ordinance No. 2024-8 (adopted August 13, 2024; repeals and replaces prior Ordinance 2009-5) — Bernalillo County Code Chapter 10, Article II — GOVERNANCE MODEL: Bernalillo County operates its OWN Local Enforcement Agency (the Planning & Development Services Building Program, headed by a County Certified Building Official) for the unincorporated area, rather than defaulting to the New Mexico Construction Industries Division (CID) for plan review/inspection. However, Sec. 10-34 of the ordinance expressly adopts BY REFERENCE 'the current codes adopted by the State of New Mexico Construction Industries Division,' amended by the county's own Exhibit A amendments — so the substantive code editions in force track whatever CID has currently adopted statewide, layered with Bernalillo County-specific amendments.; International Building Code (IBC), including Appendix Chapters B, C, E, H, I, and J — adopted by reference to the current CID-adopted edition, per Ordinance 2024-8 Sec. 10-34(1); International Residential Code (IRC), including Appendix Chapters G, H, and K — adopted by reference to the current CID-adopted edition, per Ordinance 2024-8 Sec. 10-34(2); International Existing Building Code (IEBC), as published by ICC — Ordinance 2024-8 Sec. 10-34(3); International Energy Conservation Code (IECC) — Ordinance 2024-8 Sec. 10-34(4). NM CID's Construction Industries Commission voted to adopt the 2021 IECC/energy code family (per CID's own 2024 press release 'Construction Industries Commission votes to adopt new energy-efficient building codes' and CID's 2021 Residential Energy Code Fact Sheet), which is the edition presently in force through this reference chain.; New Mexico Earthen Building Materials Code — CID-adopted, effective July 1, 2011 — Ordinance 2024-8 Sec. 10-34(5); New Mexico Non-Load Bearing Straw Construction Building Standard — CID-adopted, effective July 1, 2011 — Ordinance 2024-8 Sec. 10-34(6); International Property Maintenance Code (IPMC), as published by ICC — Ordinance 2024-8 Sec. 10-34(7); Uniform Mechanical Code (UMC), as published by IAPMO (International Association of Plumbing and Mechanical Officials) — Ordinance 2024-8 Sec. 10-34(8). NOTE: Bernalillo County uses the IAPMO Uniform Mechanical/Plumbing/Solar/Pool code family rather than the ICC's IMC/IPC/IFGC family used by many other states.; Uniform Plumbing Code (UPC), as published by IAPMO — Ordinance 2024-8 Sec. 10-34(9). The county's own homeowner plumbing-test materials (Homeowners Plumbing/Electrical/Mechanical Work page, bernco.gov) cite the 2015 IAPMO Uniform Plumbing Code as the current test/reference edition in practice.; National Electrical Code (NEC), as published by NFPA — Ordinance 2024-8 Sec. 10-34(10). NOTE: The county's own Homeowners Electrical Exam information sheet (Electrical-HomeOwners-exam-info, rev. 8/2025) specifies the only code books permitted for the county's homeowner electrical exam are the '2020 N.E.C., 2020 N.M.E.C. [New Mexico Electrical Code], and the most current Bernalillo County Ordinance' — indicating 2020 NEC is the edition in practical current use for that exam, even though the ordinance text itself does not hard-code an edition year.; New Mexico Electrical Safety Code, as adopted by CID, effective January 1, 2008 — Ordinance 2024-8 Sec. 10-34(11); Uniform Swimming Pool, Spa and Hot Tub Code, as published by IAPMO — Ordinance 2024-8 Sec. 10-34(12); Uniform Solar Energy Code, as published by IAPMO — Ordinance 2024-8 Sec. 10-34(13); Bernalillo County amendments to the above International/Uniform/New Mexico codes are compiled as Exhibit A to Ordinance 2024-8 and together with the base codes are termed the 'Uniform Construction Codes of Bernalillo County,' controlling within the unincorporated area.. Local amendments apply — see the Unincorporated Bernalillo County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Bernalillo County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.