Solar Panel Permit in Unincorporated Bernalillo County, New Mexico
Required for residential and commercial solar PV and solar hot water installations (roof-mounted, ground/pole-mounted) in unincorporated Bernalillo County, per the county's Solar Packet (rev. 2/19/2024). Structural engineering may be exempted for roof-mount systems meeting specific weight/height/attachment criteria.
Verified 2026-07-02 · Source
When you need this permit
- Rooftop, ground-mounted, or pole-mounted solar PV or solar hot water installation
- Roof-mount systems: engineering calculations required UNLESS all exception criteria are met — typical residential rafter/truss construction (min. 2x4, max 24 in on-center spacing), single-layer roofing material per IRC Section R905 (excluding clay/concrete tile or slate), panels attached directly or via continuous rails at no more than 4 ft on-center, system weight not exceeding 5 psf or 45 lbs concentrated load per attachment point (200 lbs max per framing member), and maximum panel height 18 inches above the roof surface
- Ground/pole-mount systems: engineering required if total structure height above grade (to top of panel) exceeds 6 feet
- Roof-mounted arrays must maintain 3 feet of clearance around the array
- All installations, markings, signage, and warning labels must comply with the current NEC, state codes, and the Uniform Solar Energy Code
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final/Structural
Panel mounting, racking attachment, roof penetration weatherproofing, and electrical connections verified
See the full Unincorporated Bernalillo County inspection guide — scheduling & re-inspection fees →
Tips
- A complete printed submission requires one copy of the site plan and one copy of all other drawings (minimum size 11x17), AND an electronic copy of all documents on CD or flash drive.
- Roof-mounted arrays can be no more than 10 feet above the roof surface (measured from roof to top of array); the engineering-exception path caps panel height at 18 inches above the roof surface.
- For commercial solar installations there is no exception to the engineering requirement — all commercial applications must have an engineer's stamp.
- Battery storage systems must indicate number, size, location, and grounding of batteries on the electrical plan.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-02.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Bernalillo County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Bernalillo County
Solar Panel Permit in other cities
Compare solar panel permit fees across New Mexico →
Look up this fee in a different city →
Now live
Build your Unincorporated Bernalillo County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Bernalillo County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →