Electrical Permit in Park City, Utah

Required for electrical work in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation) rather than a flat per-Utah-municipality rate. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the currently effective Fee Schedule (10/20/2025) excludes only on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water) from the building-permit valuation base, and does not list a separate EV-charger fee exemption. Park City's Environmental Sustainability program has separately advertised (in older, no-longer-live outreach pages) that 'building permit fees for installing EV charging equipment... are waived' — but this is not reflected in the current codified Fee Schedule, so it is noted here for transparency rather than applied as a guaranteed fee waiver.

Verified 2026-07-08 · Source

When you need this permit

  • New electrical circuits, wiring installations, or service upgrades not covered under an active building permit
  • Application submitted through the City Inspect (MCI) online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit FeePark City Fee Schedule (effective October 20, 2025) § 1.2.5 'Electrical Permit.'
1.32% of the total valuation of construction, plus 1% state surcharge

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Park City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough and Final Electrical

    Scheduled through City Inspect; next-day inspection available when scheduled by 3 p.m. the prior business day. AM inspections 8 a.m.–noon, PM inspections noon–4 p.m., per Park City's official Inspections page.

See the full Park City inspection guide — scheduling & re-inspection fees →

Tips

  • Electrical work performed as part of new construction or an addition is typically reviewed under the associated Building Permit's trade plan review rather than requiring a separate standalone Electrical Permit — confirm scope with the Building Department (435-615-5101) before applying separately.
  • Before applying, ask the Environmental Sustainability office (435-615-5193, celia.peterson@parkcity.org) whether an EV-charger permit-fee waiver is currently being honored — the program was publicly advertised on the city's sustainability pages but is not written into the codified Fee Schedule, so it may be discretionary or no longer active.

Frequently asked questions

Park City requires an electrical permit for: New electrical circuits, wiring installations, or service upgrades not covered under an active building permit; Application submitted through the City Inspect (MCI) online portal. If your project isn't listed, confirm with Park City Building Department (Community Development) at (435) 615-5101 before starting work.

Per Park City's Fee Schedule (effective October 20, 2025), the Electrical Permit fee is 1.32% of the total valuation of construction, plus a 1% state surcharge.

Park City does not publish a plan-review timeline for this permit. Contact Park City Building Department (Community Development) at (435) 615-5101 for current turnaround.

You'll need: City Inspect (MCI) Permit Application. See the required-documents checklist on this page for details on each.

Park City requires 1 inspection(s) for an electrical permit, in order: Rough and Final Electrical. Schedule each through Park City Building Department (Community Development) ((435) 615-5101).

Apply through Park City Building Department (Community Development) at 445 Marsac Avenue, PO Box 1480, Park City, UT 84060. Phone: (435) 615-5101. Office hours: Monday–Friday 8:00 AM – 5:00 PM. Official information: https://www.parkcity.org/services/building/index.php.

Park City, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J, with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here. Park City's Building Department Forms, Codes & Resources page (live-checked 2026-07-16) states 'All codes to include Utah Amendments' and links to the State of Utah's code list rather than publishing a separate locally-itemized edition, consistent with the statewide adoption model used by other Utah jurisdictions in this corpus (e.g., Murray, Coalville).; 2021 International Residential Code (IRC) with Utah amendments — REMAINS CURRENT; Utah Code § 15A-2-103(1)(b) did not change this edition in the 7/1/2026 statewide transition.; Appendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not separately itemized on Park City's own Forms, Codes & Resources page, added here per statute.; 2024 International Plumbing Code (IPC) with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here.; 2024 International Mechanical Code (IMC) with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here.; 2024 International Fuel Gas Code (IFGC) — statewide per Utah Code § 15A-2-103(1)(f); not itemized on Park City's own Forms, Codes & Resources page, added here per statute since the City's own materials omit it.; 2024 International Energy Conservation Code (IECC), single unsplit statewide edition, with Utah amendments — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here.; 2023 National Electrical Code (NEC) — REMAINS CURRENT; Utah Code § 15A-2-103(1)(g) did not change this edition in the 7/1/2026 statewide transition.; 2024 International Existing Building Code (IEBC) — statewide per Utah Code § 15A-2-103(1)(i); not itemized on Park City's own Forms, Codes & Resources page, added here per statute since the City's own materials omit it.; Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on Park City's own Forms, Codes & Resources page, added here per statute since the City's own materials omit it.; International Wildland-Urban Interface Code (IWUIC), 2006 edition with State of Utah amendments, further amended and locally adopted by Park City in June 2020 — codified at Park City Municipal Code Sec. 11-21-1. Genuine local amendment: compliance is a required part of the building permit plan review process for applicable properties, per the city's official Wildland Urban Interface Code FAQ page. NOTE: the IWUIC is adopted under Utah Code § 15A-2-103(2), a distinct provision from the Subsection (1) code list above that allows local compliance agencies to adopt the 2006 IWUIC by local ordinance as a local amendment — it is unaffected by the Subsection (1) edition transition on 7/1/2026 and was not touched by this re-verification.; NOTE (2026-07-16 re-verification): Utah Code § 15A-2-103, version effective 7/1/2026 (superseded 1/1/2027), took effect 15 days before this re-verification. IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now 2024 statewide; IRC (2021) and NEC (2023) did NOT change. Park City's Forms, Codes & Resources page (parkcity.org/services/building/forms/index.php) was live-checked 2026-07-16 and does not itemize specific code edition years at all — it states generically 'All codes to include Utah Amendments' and links to the state code, so no page-vs-statute lag could be detected; the statute is cited directly as governing throughout. Park City's substantial resort-town local amendments (WUI Code, Land Management Code Title 15, Fee Schedule) are unaffected and left untouched.. Local amendments apply — see the Park City overview page for the full list.

Park City's Environmental Sustainability office has advertised (in outreach pages, including an archived 'Electric Vehicle Charger Incentives' page) that building permit fees for EV charging equipment are waived. This is not reflected in the currently effective codified Fee Schedule, which only excludes on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water) from the building-permit valuation base — confirm current treatment with the Building Department or Environmental Sustainability office before assuming a fee waiver applies.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Park City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.