Solar PV Permit in Park City, Utah
Park City runs a genuinely distinct, streamlined solar photovoltaic (PV) permitting process, separate from the general Residential/Commercial Building Permit workflow — confirmed on the city's official 'Solar PV Permitting Info' page (Sustainability Department). Unlike other permit types, solar PV applications are NOT submitted through the City Inspect (MCI) online portal: a physical application using the Solar ABCs (Expedited Permit Process for PV Systems) template must be submitted in person to the Building Department at City Hall (445 Marsac Avenue). Systems under 15kW with complete, correct documentation qualify for permit issuance within two business days. Renewable energy system value (solar PV, ground source heat pumps, solar hot water) is excluded from the construction valuation used to calculate the Building Permit fee under Fee Schedule § 1.2.2 — the city's own solar page characterizes this as making solar systems 'eligible for a building permit fee waiver.' Solar thermal (as opposed to solar PV/solar electric) projects are handled separately; the city directs applicants to contact the Building Department directly for those.
Verified 2026-08-15 · Source
When you need this permit
- Solar photovoltaic (PV) / solar electric installation on a home or business within Park City Municipal Corporation (PCMC) city limits (solar thermal projects are handled separately — contact the Building Department directly)
- Physical (in-person or mailed) application submitted to the Building Department at City Hall, 445 Marsac Avenue, using the Solar ABCs (Expedited Permit Process for PV Systems) template — not submitted through the City Inspect (MCI) online portal used for other Park City permit types
- For the 2-business-day streamlined review: system must be under 15kW AND all required documents must be provided and correct AND no more than three applications may have been submitted by the same individual or company within the same calendar month
- Net Metering Agreement completed with Rocky Mountain Power (and appropriate meter set up) for all grid-connected solar installations, required before final project approval
- Planning Department zoning review of the solar permit submitted to the Building Department, to confirm compliance with local codes and ordinances
- Design Review (Planning Department) required in addition to the Building Department solar permit if the installation is on a historic structure or within Park City's Historic District
- Separate HOA review and approval if the property is part of a homeowners association — PCMC's process does not substitute for HOA sign-off
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Park City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' renewable-energy valuation exclusion, as characterized by the city's own Solar PV Permitting Info page ('Costs' section). Show full citationHide
Park City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' renewable-energy valuation exclusion, as characterized by the city's own Solar PV Permitting Info page ('Costs' section). Because § 1.2.2 separately lists an $83.00 minimum fee for the Building Permit line item, a nominal minimum fee may still apply to a solar-only project reduced to $0 valuation — this is not explicitly reconciled on the city's solar page, which frames the treatment simply as a fee waiver; confirm the exact amount charged (if any) with the Building Department (435-615-5101) at time of application.Park City Fee Schedule § 1.1.7 'Historic Review' — applies only if the solar installation is on a historic structure or within the Historic District; Show full citationHide
Park City Fee Schedule § 1.1.7 'Historic Review' — applies only if the solar installation is on a historic structure or within the Historic District; not a Building Department fee. Cross-referenced from the commercial-building-permit and commercial-tenant-improvement-permit entries in this same file, which cite the identical fee line item.The Solar PV Permitting Info page's 'Financial Incentives' section links a separate 'Building Permit Fee Waiver' document advertising a permitting fee waiver of up to $1,000 per project. Show full citationHide
The Solar PV Permitting Info page's 'Financial Incentives' section links a separate 'Building Permit Fee Waiver' document advertising a permitting fee waiver of up to $1,000 per project. That document is no longer available on parkcity.gov and predates the current § 1.2.2 fee schedule. It is noted here because the city still advertises it, but treat it as unconfirmed and distinct from the codified § 1.2.2 valuation exclusion above. Confirm current status with the Building Department or the Sustainability office before relying on a specific dollar cap.Review timeline
Inspection process
- 1
Solar Installation Site Visit
Park City Building Department staff follow an inspection checklist as part of a site visit conducted during and/or after the solar installation process, to confirm all applicable codes have been followed, per the city's official Solar PV Permitting Info page.
- 2
Net Metering Final Sign-Off
Not a code inspection but a required prerequisite to final project approval: Rocky Mountain Power must complete the Net Metering Agreement and set up the appropriate meter for grid-connected systems before Park City grants final sign-off.
See the full Park City inspection guide — scheduling & re-inspection fees →
Tips
- Solar PV permits bypass the City Inspect online portal used for every other Park City permit type — a physical application on the Solar ABCs template must be delivered to the Building Department at City Hall, 445 Marsac Avenue. Do not expect to file this one online.
- Keep the system under 15kW, submit complete and correct documentation, and stay at or below three applications per calendar month (per individual or company) to qualify for the published 2-business-day streamlined permit turnaround.
- Budget time for the Net Metering Agreement with Rocky Mountain Power — final city project approval is contingent on Rocky Mountain Power completing the meter set-up, which is outside the city's own control.
- Renewable energy system value is excluded from the valuation used to calculate the Building Permit fee (Fee Schedule § 1.2.2), which the city frames as a fee waiver — but confirm with the Building Department whether the schedule's $83.00 minimum Building Permit fee still applies to a solar-only project.
- Installations on a historic structure or within the Historic District require a separate Planning Department Design Review in addition to the Building Department's solar permit — budget for the $497/$1,518 Historic Review fee and additional review time.
- If the property is part of an HOA, secure the HOA's own review and approval before seeking final sign-off from Park City Municipal Corporation — HOA rules can be more restrictive than the city's.
- Solar thermal installations are NOT covered by this streamlined Solar ABCs process, which is scoped to solar PV/solar electric only — contact the Building Department directly for solar thermal permitting.
- Rocky Mountain Power's net metering programs (Utah Schedule 135 'Grandfathered Net Metering Program' and Schedule 136 'Transition Program') are closed to new applicants. New grid-connected residential solar customers are served under Utah Schedule 137 'Net Billing Service' (effective April 25, 2025), which requires the customer to have executed an 'Interconnection Agreement for Net Billing Service' — not the 'Net Metering Agreement' named elsewhere in this entry. The underlying requirement is unchanged: Rocky Mountain Power must complete an agreement and set up the appropriate meter before Park City grants final sign-off. Only Rocky Mountain Power's own program and document name changed. Confirm the current agreement name and process with Rocky Mountain Power; Park City's own page describing this requirement is not currently reachable (see confidenceNote).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-15.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Park City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Park City's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Park City yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Park City lands. Privacy.
Other permits in Park City
Solar PV Permit in other cities
Compare solar pv permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Park City project checklist
Describe your project once and get every permit, document, and fee it triggers in Park City — in one checklist. Free, for any city and any number of projects.
Get started →