Solar PV Permit in Park City, Utah
Park City runs a genuinely distinct, streamlined solar photovoltaic (PV) permitting process, separate from the general Residential/Commercial Building Permit workflow — confirmed on the city's official 'Solar PV Permitting Info' page (Sustainability Department). Unlike other permit types, solar PV applications are NOT submitted through the City Inspect (MCI) online portal: a physical application using the Solar ABCs (Expedited Permit Process for PV Systems) template must be submitted in person to the Building Department at City Hall (445 Marsac Avenue). Systems under 15kW with complete, correct documentation qualify for permit issuance within two business days. Renewable energy system value (solar PV, ground source heat pumps, solar hot water) is excluded from the construction valuation used to calculate the Building Permit fee under Fee Schedule § 1.2.2 — the city's own solar page characterizes this as making solar systems 'eligible for a building permit fee waiver.' Solar thermal (as opposed to solar PV/solar electric) projects are handled separately; the city directs applicants to contact the Building Department directly for those.
Verified 2026-07-21 · Source
When you need this permit
- Solar photovoltaic (PV) / solar electric installation on a home or business within Park City Municipal Corporation (PCMC) city limits (solar thermal projects are handled separately — contact the Building Department directly)
- Physical (in-person or mailed) application submitted to the Building Department at City Hall, 445 Marsac Avenue, using the Solar ABCs (Expedited Permit Process for PV Systems) template — not submitted through the City Inspect (MCI) online portal used for other Park City permit types
- For the 2-business-day streamlined review: system must be under 15kW AND all required documents must be provided and correct AND no more than three applications may have been submitted by the same individual or company within the same calendar month
- Net Metering Agreement completed with Rocky Mountain Power (and appropriate meter set up) for all grid-connected solar installations, required before final project approval
- Planning Department zoning review of the solar permit submitted to the Building Department, to confirm compliance with local codes and ordinances
- Design Review (Planning Department) required in addition to the Building Department solar permit if the installation is on a historic structure or within Park City's Historic District
- Separate HOA review and approval if the property is part of a homeowners association — PCMC's process does not substitute for HOA sign-off
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Solar Installation Site Visit
Park City Building Department staff follow an inspection checklist as part of a site visit conducted during and/or after the solar installation process, to confirm all applicable codes have been followed, per the city's official Solar PV Permitting Info page.
- 2
Net Metering Final Sign-Off
Not a code inspection but a required prerequisite to final project approval: Rocky Mountain Power must complete the Net Metering Agreement and set up the appropriate meter for grid-connected systems before Park City grants final sign-off.
See the full Park City inspection guide — scheduling & re-inspection fees →
Tips
- Solar PV permits bypass the City Inspect (MCI) online portal used for every other Park City permit type in this dataset — a physical application (Solar ABCs template) must instead be delivered to the Building Department at City Hall, 445 Marsac Avenue.
- Keep the system under 15kW, submit complete and correct documentation, and stay at or below three applications per calendar month (per individual or company) to qualify for the published 2-business-day streamlined permit turnaround.
- Budget time for the Net Metering Agreement with Rocky Mountain Power — final city project approval is contingent on Rocky Mountain Power completing the meter set-up, which is outside the city's own control.
- Renewable energy system value is excluded from the valuation used to calculate the Building Permit fee (Fee Schedule § 1.2.2), which the city frames as a fee waiver — but confirm with the Building Department whether the schedule's $83.00 minimum Building Permit fee still applies to a solar-only project.
- Installations on a historic structure or within the Historic District require a separate Planning Department Design Review in addition to the Building Department's solar permit — budget for the $497/$1,518 Historic Review fee and additional review time.
- If the property is part of an HOA, secure the HOA's own review and approval before seeking final sign-off from Park City Municipal Corporation — HOA rules can be more restrictive than the city's.
- Solar thermal installations are NOT covered by this streamlined Solar ABCs process, which is scoped to solar PV/solar electric only — contact the Building Department directly for solar thermal permitting.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Park City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Park City
Solar PV Permit in other cities
Compare solar pv permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Park City project checklist
Describe your project once and get every permit, document, and fee it triggers in Park City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →