EV Charger / EVSE Permit — Unincorporated Tooele County, Utah · Requirements sheet
Verified 2026-07-20 · Source: https://www.tooeleco.gov/Document%20Center/Department/Administration/County%20Manager/Fee%20Schedule%20-%20Effective%205-19-26.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated Tooele County, Utah
Tooele County does not publish a distinct EV charger / EVSE permit type or fee line item. EV charger (EVSE) installation is treated as standard electrical work under the same combined Building Permit Application and General Instructions form used for all other permit types — the county's official adopted Fee Schedule (effective 5-19-26) computes Building Permit fees via the Uniform Building Code valuation mechanism with no separate electrical trade-permit line item and no EV-charger or electric-vehicle-charging line item anywhere in the 21-page document (confirmed by direct text search, re-checked 2026-07-19); the combined Building/Electrical/HVAC/Plumbing application form likewise lists no distinct EV-specific category.
Verified 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Tooele County — falls under the electrical scope of the county's combined Building Permit Application
- Complete and submit all supporting documents at time of submittal — incomplete applications are not accepted
- Utility approval forms (electric) if new service or additional load is being added
- Compliance with the 2023 NEC, governing per Utah Code §15A-2-103(1)(g)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical
Not separately published for EV chargers by the county; follows the standard electrical inspection sequence documented for this jurisdiction's residential-building-permit entry.
See the full Unincorporated Tooele County inspection guide — scheduling & re-inspection fees →
Tips
- Tooele County treats EV charger installation as ordinary electrical work under the same combined Building/Electrical/HVAC/Plumbing application form used for all other permit types — there is no dedicated EV-charger permit type, application, or fee category.
- The Building Permit Fee is valuation-based (Uniform Building Code provisions via the annual ICC Building Valuation Data publication) — contact Building Inspection at (435) 843-4737 or building@tooeleco.gov for a project-specific estimate.
- Utility approval forms are required if the EV charger installation adds new electrical service or additional load.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Tooele County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Tooele County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →