Residential Building Permit in Unincorporated Tooele County, Utah
Required for new residential construction, additions, remodels, and any work regulated by the statewide-adopted 2024 IBC / 2021 IRC (per Utah Code §15A-2-103) in unincorporated Tooele County; the county's own application form still cites 2021-cycle editions (live-checked 2026-07-16). The county's own application form covers Building, Electrical, HVAC, Plumbing, Energy, Occupancy, Sign, Construction, and Demolition permits under a single combined application.
Verified 2026-07-03 · Source
When you need this permit
- New single-family residential construction, additions, remodels regulated by the statewide-adopted 2024 IBC / 2021 IRC (Utah Code §15A-2-103); Tooele County's own application form cites 2021 IRC/IBC
- Complete and submit all supporting documents at time of submittal — incomplete applications are not accepted
- Dimensioned site plan showing north direction, lot lines, adjacent streets/roads/rights-of-way, existing structures/wells/septic tanks, proposed construction, and motor vehicle access
- One complete set of construction plans (may include gas pipe sizing diagram, stucco specifications, proof of energy code compliance)
- Site Plan Approval from the Tooele County Fire Department
- Utility approval forms (gas, electric, sewer, water) if new service or additional load is being added
- For properties not connected to community water/sewer: certificate of approval from the Tooele County Health Department for water and septic, per Tooele County Land Use Ord. 4-16 (Ord. 2005-22, 9/13/2005)
- Architectural Control Committee approval where required in subdivisions
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour, per standard IRC/IBC inspection sequence.
- 2
Framing
After framing, sheathing, and MEP rough-in complete.
- 3
Progress Inspection
A progress inspection MUST be made within 180 days of building permit issuance or the permit becomes null and void, per the Building Permit Application and General Instructions form.
- 4
Final / Certificate of Occupancy
Final inspection required before occupancy.
See the full Unincorporated Tooele County inspection guide — scheduling & re-inspection fees →
Tips
- Unincorporated Tooele County uses a single combined 'Building Permit Application and General Instructions' form (building-permit-012225.pdf) that covers Building, Electrical, HVAC, Plumbing, Energy, Occupancy, Sign, Construction, and Demolition permits — not separate forms per trade.
- Site Plan Approval from the Tooele County Fire Department is required on the site plan itself before submittal — coordinate with the Fire Marshal's office (Anthony Bott, (435) 833-8125, anthony.bott@tooeleco.org) early.
- Fire Protection Criteria for Unincorporated Tooele County (Outside of North Tooele Fire District) impose specific fire-apparatus-access-road requirements (per IFC 503.1.1/Appendix D) — properties more than 150 feet from a fire apparatus access road have additional driveway requirements.
- Impact fees (Parks, Public Safety, Fire, Transportation, and district-specific fees like North Tooele Fire District or Stansbury Park Service Agency) are automatically bundled into the building permit fee — the department states it has no authority to waive any part of them.
- Permits become null and void if work is not commenced within 180 days of issuance, if a progress inspection does not occur within 180 days, or if work is suspended/abandoned for 180+ days after commencement.
- Tooele County Development Department is a distinct jurisdiction from Tooele City (tooelecity.gov) — verify sources are from tooeleco.gov (county) when researching unincorporated areas, not tooelecity.gov (city).
- Building & Zoning Questions: (435) 843-3160 (per the application form); Building Inspection and Code Compliance office: (435) 843-4737, fax (435) 843-3252, building@tooeleco.gov, 47 South Main Street Room 208 (per the Building Inspection page). Both numbers are published by the county for building-permit-related contact as of 2026-07-04.
- EV charger (EVSE) installation is treated as standard electrical work under this same combined permit — the county's official County-Wide Fee Schedule PDF (effective 5-19-26, tooeleco.gov, live-checked 2026-07-19) computes Building Permit fees by ICC valuation table with no separate electrical trade-permit line item and no EV-charger or electric-vehicle-charging line item anywhere in the document; the combined Building/Electrical/HVAC/Plumbing application form likewise lists no distinct EV-specific category. Contact Building & Zoning at (435) 843-3160 for a project-specific confirmation.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-03.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Tooele County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Tooele County
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Tooele County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Tooele County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →