Solar PV / Solar Energy System Permit in Unincorporated Tooele County, Utah
Tooele County does not publish a distinct rooftop/on-site solar PV permit type or fee line item. A residential or commercial solar PV installation is treated as standard structural (roof-mount attachment) and electrical (wiring, inverter, interconnection) work under the same combined Building Permit Application and General Instructions form used for all other permit types — the county's official adopted Fee Schedule (effective 5-19-26) computes Building Permit fees via the Uniform Building Code valuation mechanism with no separate solar, solar PV, or photovoltaic line item anywhere in the 21-page document (confirmed by a page-by-page read of the full PDF, 2026-07-21); the combined Building/Electrical/HVAC/Plumbing application form likewise lists no distinct solar-specific category. Large, utility-scale 'Solar Energy Systems' feeding off-site users are instead a land-use/zoning matter under the county's Land Use Ordinance (a required siting buffer from Residential District boundaries), which is a separate process from this building-permit entry and is not addressed here.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a roof-mounted or ground-mounted (accessory, on-site) solar PV system at a residential or commercial property in unincorporated Tooele County — falls under the structural and electrical scope of the county's combined Building Permit Application
- Complete and submit all supporting documents at time of submittal — incomplete applications are not accepted
- One complete set of construction/installation plans, including structural attachment details and electrical wiring/interconnection diagram
- Utility approval form (electric — Rocky Mountain Power or the applicable local utility) for interconnection/net-metering, since the installation adds new electrical service or generation
- Compliance with the 2023 NEC, governing per Utah Code §15A-2-103(1)(g), and the statewide-adopted 2024 IBC/2021 IRC structural provisions for roof or ground-mount attachment
- Utility-scale, off-site-serving 'Solar Energy System' facilities are a separate Conditional Use matter under the county's Land Use Ordinance, subject to a siting buffer from Residential District boundaries — out of scope for this building-permit entry, which covers on-site residential/commercial rooftop or accessory PV only
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Structural / Roof Attachment
Verifies roof or ground-mount attachment against submitted structural plans; not separately published by the county for solar, follows the standard building inspection sequence.
- 2
Electrical
Verifies wiring, inverter, and utility interconnection against the 2023 NEC; not separately published for solar PV by the county, follows the standard electrical inspection sequence documented for this jurisdiction's residential-building-permit entry.
See the full Unincorporated Tooele County inspection guide — scheduling & re-inspection fees →
Tips
- Tooele County treats solar PV installation as ordinary structural and electrical work under the same combined Building/Electrical/HVAC/Plumbing application form used for all other permit types — there is no dedicated solar or photovoltaic permit type, application, or fee category, the same pattern already documented for this jurisdiction's EV-charger-permit entry.
- The Building Permit Fee is valuation-based (Uniform Building Code provisions via the annual ICC Building Valuation Data publication) — contact Building Inspection at (435) 843-4737 or building@tooeleco.gov for a project-specific estimate.
- A utility interconnection/net-metering approval form is required from the serving electric utility (e.g., Rocky Mountain Power) since a solar PV system adds new electrical generation/service.
- Large, utility-scale 'Solar Energy System' facilities that feed off-site users are regulated separately under the county's Land Use Ordinance as a Conditional Use, with a required siting buffer from Residential District boundaries — this is a distinct zoning process from the on-site residential/commercial rooftop or accessory PV installations covered by this entry; confirm with Building & Zoning, (435) 843-3160, which process applies to a given project.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Tooele County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Tooele County
Solar PV / Solar Energy System Permit in other cities
Compare solar pv / solar energy system permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Tooele County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Tooele County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →