Commercial Building Permit in Unincorporated Tooele County, Utah
Required for new commercial construction in unincorporated Tooele County, regulated by the statewide-adopted 2024 IBC (Utah Code §15A-2-103; the county's own Building Permits page still lists the 2021 IBC as of live re-check 2026-07-16). The Building Permit Fee follows the same Uniform Building Code valuation-based mechanism used for residential construction; commercial development also triggers the county's Transportation Impact Fee at a distinct 'Non-Residential/Commercial' per-square-foot rate.
Verified 2026-07-19 · Source
When you need this permit
- New commercial construction regulated by the statewide-adopted 2024 IBC (Utah Code §15A-2-103); Tooele County's own Building Permits page cites 2021-cycle editions (live-checked 2026-07-16 — see codesAdopted)
- Complete and submit all supporting documents at time of submittal — incomplete applications are not accepted
- Dimensioned site plan showing north direction, lot lines, adjacent streets/rights-of-way, existing structures, proposed construction, and motor vehicle access
- Site Plan Approval from the Tooele County Fire Department
- One complete set of construction plans, including structural, electrical, mechanical, and plumbing design
- Utility approval forms (gas, electric, sewer, water) if new service or additional load is being added
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Tooele County adopted Fee Schedule (effective 5-19-26): 'The Building Official shall determine valuations... Show full citationHide
Tooele County adopted Fee Schedule (effective 5-19-26): 'The Building Official shall determine valuations... using... Building Valuation Data publication issued... by the International Conference of Building Officials... The fee shall then be determined by reference to the Uniform Building Code provisions regarding the calculation of fees.' Same mechanism applies to commercial as to residential per the county's Fee Schedule — no separate valuation table specific to commercial occupancy classifications was found published (distinct from neighboring Iron County, which does publish per-occupancy-classification valuation rates).Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section, Transportation table: 'Non-Residential/Commercial... Show full citationHide
Tooele County adopted Fee Schedule (effective 5-19-26), Impact Fees section, Transportation table: 'Non-Residential/Commercial... $0.259 per square foot.' A separate, more granular land-use-category table (e.g., 'General Commercial/Shopping Center $1,360 per 1,000 square feet,' 'General Office $561 per 1,000 square feet') appears under a 'North Tooele Fire District' heading in the same Impact Fees section, with a note that 'Table 7.5 of the LRB IFFP Impact Fee Study will be used' for land uses not covered by the standard rate — reported here without asserting whether that granular table is scoped only to the North Tooele Fire District or applies more broadly, since the fee schedule's own formatting does not make the scope unambiguous.Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour, per standard IBC inspection sequence.
- 2
Structural / Framing
Framing and structural connections verified against submitted plans.
- 3
MEP Rough-In
Electrical, mechanical, and plumbing rough-in verified against submitted plans.
- 4
Final
Final building inspection prior to occupancy.
See the full Unincorporated Tooele County inspection guide — scheduling & re-inspection fees →
Tips
- Unincorporated Tooele County's Non-Residential/Commercial Transportation Impact Fee ($0.259/sq ft) is a simplified flat rate; the county's Fee Schedule also lists a more granular land-use-category table (Church, Convenience Store, Fast Food, General Office, Hospital, etc.) under a 'North Tooele Fire District' heading — confirm with the Development Department which table applies to a specific property and use.
- Site Plan Approval from the Tooele County Fire Department is required on the site plan itself before submittal for both residential and commercial projects.
- No separate per-occupancy-classification building valuation table (e.g., Assembly, Business, Mercantile) is published by Tooele County, unlike neighboring Iron County — the county's Fee Schedule states only that the Uniform Building Code provisions govern the fee calculation generally.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Online permit portal
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Tooele County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Tooele County.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Property Access
Unincorporated Tooele County's permit history is searchable by address
6,169 permits on record for Unincorporated Tooele County, 2016–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Unincorporated Tooele County
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Tooele County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Tooele County — in one checklist. Free, for any city and any number of projects.
Get started →