Residential Addition / Remodel / Basement Finish Permit — Lindon, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://www.lindon.gov/DocumentCenter/View/199
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Addition / Remodel / Basement Finish Permit in Lindon, Utah
Required for residential additions, remodels, and basement finishes in Lindon. Charged under the 'Other Residential' Building Permit Application Fee category (flat $100) with the same 1997 UBC Table 1-A valuation-based Building Permit Fee and 25% residential Plan Review Fee as new construction. Lindon has no separate solar-PV permit type or fee — the city's 2025-2026 Fee Schedule explicitly groups solar into this same 'Other Residential' category alongside pools, additions, detached garages, sheds, and retaining walls, so rooftop or ground-mounted solar installs are permitted and charged through this permit type.
Verified 2026-07-19 · Source
When you need this permit
- Additions to existing one- and two-family residential structures
- Basement finish work (framing, electrical, mechanical) in an existing home
- Digital plans required, drawn to 1/4-inch scale per Lindon's Remodel Checklist/Basement Finish document
- Site plan and building plans per Lindon's standard submittal requirements where applicable to the scope of work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Framing, Electrical, Mechanical, Plumbing
May be combined into a single inspection depending on scope, per Lindon's standard residential inspection sequence.
- 2
Final Building Inspection
Building Department final sign-off required before occupancy of the completed addition or remodeled/finished space.
See the full Lindon inspection guide — scheduling & re-inspection fees →
Tips
- Basement finish and remodel projects use the same 1/4-inch scale digital plan requirements as new construction but a shorter checklist (Remodel Checklist/Basement Finish) focused on floor plans, electrical, and mechanical details.
- The 'Other Residential' $100 application fee and $2,500 refundable Public Improvement Repair Assurance bond apply to additions, detached garages, sheds, retaining walls, and solar alike — check the Fee Schedule's Development section for the exact category your project falls under.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lindon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Lindon
Residential Addition / Remodel / Basement Finish Permit in other cities
Compare residential addition / remodel / basement finish permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Lindon project checklist
Describe your project once and get every permit, document, and fee it triggers in Lindon — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →