Residential Addition / Remodel / Basement Finish Permit in Lindon, Utah

Required for residential additions, remodels, and basement finishes in Lindon. Charged under the 'Other Residential' Building Permit Application Fee category (flat $100) with the same 1997 UBC Table 1-A valuation-based Building Permit Fee and 25% residential Plan Review Fee as new construction. Lindon has no separate solar-PV permit type or fee — the city's 2025-2026 Fee Schedule explicitly groups solar into this same 'Other Residential' category alongside pools, additions, detached garages, sheds, and retaining walls, so rooftop or ground-mounted solar installs are permitted and charged through this permit type.

Verified 2026-07-19 · Source

When you need this permit

  • Additions to existing one- and two-family residential structures
  • Basement finish work (framing, electrical, mechanical) in an existing home
  • Digital plans required, drawn to 1/4-inch scale per Lindon's Remodel Checklist/Basement Finish document
  • Site plan and building plans per Lindon's standard submittal requirements where applicable to the scope of work

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Application Fee (Other Residential)Lindon City 2025-2026 Fee Schedule, 'Building Permit Application Fee' — 'Other Residential' category explicitly includes additions, per the fee schedule's parenthetical list (pools, additions, detached garages, sheds, retaining walls, solar).
$100.00
Building Permit Fee — valuation-based (1997 UBC Table 1-A)Same valuation-based method as new construction; Lindon City 2025-2026 Fee Schedule, 'Building Permit' line.
Determined using 1997 Uniform Building Code, Table 1-A, applied to project valuation
Plan Review Fee (residential)Lindon City 2025-2026 Fee Schedule, 'Plan Review Fee' line.
25% of permit fee
Public Improvement Repair Assurance (refundable, Other Residential)Lindon City 2025-2026 Fee Schedule, 'Public Improvement Repair Assurance' — applies to 'pools, additions, detached accessory structures, retaining walls, or any other project that could damage public improvements.'
$2,500.00

Review timeline

Plan review
Not published — contact the department

How long did your Residential Addition / Remodel / Basement Finish Permit permit actually take in Lindon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Framing, Electrical, Mechanical, Plumbing

    May be combined into a single inspection depending on scope, per Lindon's standard residential inspection sequence.

  2. 2

    Final Building Inspection

    Building Department final sign-off required before occupancy of the completed addition or remodeled/finished space.

See the full Lindon inspection guide — scheduling & re-inspection fees →

Tips

  • Basement finish and remodel projects use the same 1/4-inch scale digital plan requirements as new construction but a shorter checklist (Remodel Checklist/Basement Finish) focused on floor plans, electrical, and mechanical details.
  • The 'Other Residential' $100 application fee and $2,500 refundable Public Improvement Repair Assurance bond apply to additions, detached garages, sheds, retaining walls, and solar alike — check the Fee Schedule's Development section for the exact category your project falls under.

Frequently asked questions

Lindon requires a residential addition / remodel / basement finish permit for: Additions to existing one- and two-family residential structures; Basement finish work (framing, electrical, mechanical) in an existing home; Digital plans required, drawn to 1/4-inch scale per Lindon's Remodel Checklist/Basement Finish document; Site plan and building plans per Lindon's standard submittal requirements where applicable to the scope of work. If your project isn't listed, confirm with Lindon City Building Department (Community Development) at (801) 785-7687 before starting work.

Lindon charges a flat $100 'Other Residential' Building Permit Application Fee, plus the standard valuation-based Building Permit Fee (1997 UBC Table 1-A) and a 25% residential Plan Review Fee, per the city's 2025-2026 Fee Schedule. A refundable $2,500 Public Improvement Repair Assurance bond also applies.

Lindon does not publish a plan-review timeline for this permit. Contact Lindon City Building Department (Community Development) at (801) 785-7687 for current turnaround.

You'll need: Remodel Checklist / Basement Finish; Building Permit Application. See the required-documents checklist on this page for details on each.

Lindon requires 2 inspection(s) for a residential addition / remodel / basement finish permit, in order: Rough Framing, Electrical, Mechanical, Plumbing, Final Building Inspection. Schedule each through Lindon City Building Department (Community Development) ((801) 785-7687).

Apply through Lindon City Building Department (Community Development) at 100 North State Street, Lindon, UT 84042. Phone: (801) 785-7687, email: building@lindon.gov. Official information: https://www.lindon.gov/251/Building-Inspection.

Lindon, Utah has adopted: 2021 International Residential Code (IRC), as amended by the State of Utah — adopted statewide under Utah Code Title 15A (State Construction and Fire Codes Act), § 15A-2-103. No Lindon-specific code-edition statement was found on lindon.gov's Building & Inspection page, Building Department Forms & Applications page, or in the current Fee Schedule; Lindon has not published a local amendment opting out of the statewide code, so the statutory statewide edition is used here rather than invented city-specific text.; 2024 International Building Code (IBC), as amended by the State of Utah — effective statewide July 1, 2026 per Utah Code § 15A-2-103 (2026 General Session update); no Lindon-specific IBC edition statement found on the city's own site.; 2023 National Electrical Code (NEC) — adopted statewide under Utah Code § 15A-2-103; no Lindon-specific NEC edition statement found on the city's own site.; 2015 International Plumbing Code (IPC), Table 403.1 — cited by name in Lindon City's own current Fee Schedule (Sewer Utility Fee and Water Utility Fee sections: 'Based on Table 403.1 in 2015 International Plumbing Code as currently adopted or as may be amended'), effective 07/01/2026 fee schedule. This is Lindon's own published reference to a specific plumbing-code edition/table used for utility base-rate sizing, distinct from the statewide construction-code IPC edition.; Other 2024 International Codes (IMC, IEBC, IECC) — adopted statewide alongside the 2024 IBC per Utah Code § 15A-2-103, effective July 1, 2026; not individually itemized by name on Lindon's own Building & Inspection page.. Local amendments apply — see the Lindon overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lindon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.