Solar / Solar PV Installation Permit in Lindon, Utah
Lindon does not publish a distinct solar or solar-PV permit application, checklist, or fee. Solar installations (rooftop or ground-mounted) are explicitly named within the same 'Other Residential' Building Permit Application Fee category used for pools, additions, detached garages, sheds, and retaining walls — the city's 2025-2026 Fee Schedule (FY2025-26 Final Budget) lists this category's parenthetical as '(Pools, additions, detached garages, sheds, retaining walls, solar)' at a flat $100.00. A full-text search of the Building & Inspection department page and the site found zero dedicated solar checklist, application form, or solar-specific requirements published by the city.
Verified 2026-07-21 · Source
When you need this permit
- Building permit application submitted through Lindon's online CivicReview portal, same as other 'Other Residential' permit types (no solar-specific application form is published)
- Electrical plan showing PV system components (panels, inverter(s), disconnects, conductor sizing) sufficient for the Building Department's standard electrical review, since Lindon has no separate solar checklist to define scope-specific submittal requirements
- Site plan showing panel/array location for roof-mounted systems, or location and setbacks for ground-mounted arrays
- Utility interconnection agreement with Rocky Mountain Power for grid-tied systems — coordinated directly with the utility, (888) 221-7070, separately from the city building permit, consistent with how Lindon handles other utility-coordinated electrical work (temporary/permanent power)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Lindon City 2025-2026 Fee Schedule (FY2025-26 Final Budget Fee Schedule), 'Building Permit Application Fee,' 'Other Residential' line (last updated 6/03/2024 with Ordinance 2024-8-O): '$100.00… Show full citationHide
Lindon City 2025-2026 Fee Schedule (FY2025-26 Final Budget Fee Schedule), 'Building Permit Application Fee,' 'Other Residential' line (last updated 6/03/2024 with Ordinance 2024-8-O): '$100.00 (Pools, additions, detached garages, sheds, retaining walls, solar)' — solar is named explicitly in that category's own parenthetical list.Lindon City 2025-2026 Fee Schedule, 'Public Improvement Repair Assurance,' 'Other Residential' line: '$2,500.00 (Such as pools, additions, detached accessory structures, retaining walls, or any other… Show full citationHide
Lindon City 2025-2026 Fee Schedule, 'Public Improvement Repair Assurance,' 'Other Residential' line: '$2,500.00 (Such as pools, additions, detached accessory structures, retaining walls, or any other project that could damage public improvements).' Unlike the Building Permit Application Fee's 'Other Residential' category, this bond line does not explicitly name solar — it may apply to ground-mounted systems that disturb public improvements, but this has not been confirmed by the city for solar specifically. Confirm with the Building Department, (801) 785-7687, before budgeting for a bond on a solar project.Review timeline
Inspection process
- 1
Trade-Specific Final Inspection (Electrical / Building)
Final inspection scheduled with the Building Department, (801) 785-7687, at least 24 hours in advance, per Lindon's standard inspection-scheduling requirement. No solar-specific inspection checklist is published by the city.
See the full Lindon inspection guide — scheduling & re-inspection fees →
Tips
- Lindon has no distinct solar or solar-PV permit type, application, or fee — solar is one of six project types explicitly grouped under the flat $100 'Other Residential' Building Permit Application Fee, alongside pools, additions, detached garages, sheds, and retaining walls.
- Because Lindon has no separate electrical-permit category (see the EV-charger entry), a solar installation's electrical scope is reviewed as part of the same general building permit rather than a standalone electrical permit.
- Grid-tied systems require a separate utility interconnection agreement directly with Rocky Mountain Power, (888) 221-7070 — this is independent of, and in addition to, the city building permit.
- The $2,500 'Other Residential' Public Improvement Repair Assurance bond does not explicitly name solar in its own fee-schedule parenthetical (unlike the Application Fee's parenthetical, which does) — confirm with the Building Department whether it applies to your specific installation, especially for ground-mounted arrays.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fee schedules
Checklists & handouts
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lindon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Lindon's permit history is searchable by address
4,003 permits on record for Lindon, 2016–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
73% of Lindon's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Lindon
Solar / Solar PV Installation Permit in other cities
Compare solar / solar pv installation permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Lindon project checklist
Describe your project once and get every permit, document, and fee it triggers in Lindon — in one checklist. Free, for any city and any number of projects.
Get started →