Lindon building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Lindon, Utah.

Last verified 2026-07-13 · Source · Embed this page’s badge · Version history

Building department

Address
100 North State Street, Lindon, UT 84042
Phone
(801) 785-7687
Office hours

Inspection guide

See how inspections work in Lindon — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2021 International Residential Code (IRC), as amended by the State of Utah — adopted statewide under Utah Code Title 15A (State Construction and Fire Codes Act), § 15A-2-103. No Lindon-specific code-edition statement was found on lindon.gov's Building & Inspection page, Building Department Forms & Applications page, or in the current Fee Schedule; Lindon has not published a local amendment opting out of the statewide code, so the statutory statewide edition is used here rather than invented city-specific text.
  • 2024 International Building Code (IBC), as amended by the State of Utah — effective statewide July 1, 2026 per Utah Code § 15A-2-103 (2026 General Session update); no Lindon-specific IBC edition statement found on the city's own site.
  • 2023 National Electrical Code (NEC) — adopted statewide under Utah Code § 15A-2-103; no Lindon-specific NEC edition statement found on the city's own site.
  • 2015 International Plumbing Code (IPC), Table 403.1 — cited by name in Lindon City's own current Fee Schedule (Sewer Utility Fee and Water Utility Fee sections: 'Based on Table 403.1 in 2015 International Plumbing Code as currently adopted or as may be amended'), effective 07/01/2026 fee schedule. This is Lindon's own published reference to a specific plumbing-code edition/table used for utility base-rate sizing, distinct from the statewide construction-code IPC edition.
  • Other 2024 International Codes (IMC, IEBC, IECC) — adopted statewide alongside the 2024 IBC per Utah Code § 15A-2-103, effective July 1, 2026; not individually itemized by name on Lindon's own Building & Inspection page.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
1units

1 buildings · $468,018 valuation

Trailing 12 months
44units

12 of 12 months reported · #71 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
12units

12 buildings · $5.2M valuation

5 month(s) reported to Census

Full year 2025
88units

88 buildings · $30.8M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Lindon City does not require a building permit for a shed 200 square feet or smaller.
  • Lindon's Building Permit fee is valuation-based under the 1997 Uniform Building Code, Table 1-A (incorporated by reference, not published as a standalone dollar table in the city's own fee schedule) — valuation uses the prior February's ICC Building Valuation Data, with SFD/townhome/duplex valued at 95 percent.
  • New single-family dwellings, townhomes, detached ADUs, and duplexes pay a $500 Building Permit Application Fee; nearly everything else residential (additions, pools, detached garages, sheds, retaining walls, solar) pays a flat $100 application fee instead, per the city's 2025-2026 Fee Schedule.
  • Common trade permits (re-roof, furnace/A.C. replacement, electrical service panel replacement, water heater replacement) are each a flat $85 under Lindon's 'Miscellaneous Residential Permit Fees' line, added June 3, 2024 by Ordinance 2024-8-O — Lindon does not publish separate electrical/plumbing/mechanical permit fee categories the way some neighboring cities (e.g., Murray) do.
  • All building permit plans have been required to be submitted digitally through Lindon's online CivicReview portal since March 1, 2021.
  • Underground electrical service (temporary and permanent power) requires separate, direct coordination with Rocky Mountain Power, (888) 221-7070, in addition to the city building permit and inspections.
  • No jurisdiction-published plan-review turnaround time (in business/calendar days) was located for any Lindon permit type in official city sources as of 2026-07-08. Only the new-dwelling-construction Residential Building Permit type has a grounded, non-null reviewTimelineDays value — sourced from the statewide statutory floor at Utah Code § 10-20-909 (17 business days total: 3-day screening + 14-day plan review) rather than a Lindon-specific figure. All other permit types are honestly left null with a note rather than estimated, per PermitBase's zero-tolerance verified-data policy.
  • Lindon's Building Department doubles as the city's code enforcement office — the same building inspector who performs construction inspections also performs annual business-license inspections for code compliance.

Comparable nearby cities

American Fork
Both in Utah County10 shared permit types~5 mi away
Compare fees →
Saratoga Springs
Both in Utah County10 shared permit types~17 mi away
Compare fees →
Orem
Both in Utah County9 shared permit types~3 mi away
Compare fees →