Skip to main content
PermitBase

Sign Permit in Lindon, Utah

Required for permanent sign installation in Lindon. Fee is tiered by sign type (wall, monument, pole, billboard); painted/laminated signs not requiring a physical on-site inspection use a separate, lower Administrative Sign Fee.

Verified 2026-07-08 · Source

When you need this permit

  • Wall sign (adhered, painted, or similar) or structurally attached wall sign
  • Monument sign, pole sign, or billboard sign
  • Administrative Sign Fee applies instead for painted, laminated, or similar signs not requiring a physical on-site inspection

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit FeeLindon City 2025-2026 Fee Schedule, 'Sign Permit' (added 6/03/2024 with Ordinance 2024-8-O). The PDF's tiered $100/$150/$300/$400/$550 values map to listed categories 'Wall sign (adhered, painted, or similar)', 'Wall sign (structurally attached)', 'Monument sign', 'Pole sign', 'Billboard sign' respectively, though the source PDF's column alignment could not be independently confirmed value-by-value against each category label due to PDF text-extraction layout limitations; all five dollar figures and all five category labels are directly quoted from the same fee-schedule line item.
$100.00 (tier 1) / $150.00 (tier 2) / $300.00 (tier 3) / $400.00 (wall sign, structurally attached) / $550.00 (monument or pole sign / billboard)
Administrative Sign FeeLindon City 2025-2026 Fee Schedule: 'For painted, laminated or similar signs that do not require a physical on-site inspection.'
$25.00

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Lindon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Sign Inspection

    Physical on-site inspection required for wall, monument, pole, and billboard signs; not required for painted/laminated signs charged the Administrative Sign Fee.

See the full Lindon inspection guide — scheduling & re-inspection fees →

Tips

  • Painted or laminated signs that do not require a physical on-site inspection qualify for the lower $25 Administrative Sign Fee instead of the tiered Sign Permit Fee.

Frequently asked questions

Lindon requires a sign permit for: Wall sign (adhered, painted, or similar) or structurally attached wall sign; Monument sign, pole sign, or billboard sign; Administrative Sign Fee applies instead for painted, laminated, or similar signs not requiring a physical on-site inspection. If your project isn't listed, confirm with Lindon City Building Department (Community Development) at (801) 785-7687 before starting work.

Per Lindon's 2025-2026 Fee Schedule, sign permit fees are tiered from $100 to $550 depending on sign type (wall, monument, pole, or billboard); painted or laminated signs not requiring on-site inspection instead pay a flat $25 Administrative Sign Fee.

Lindon does not publish a plan-review timeline for this permit. Contact Lindon City Building Department (Community Development) at (801) 785-7687 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Lindon requires 1 inspection(s) for a sign permit, in order: Sign Inspection. Schedule each through Lindon City Building Department (Community Development) ((801) 785-7687).

Apply through Lindon City Building Department (Community Development) at 100 North State Street, Lindon, UT 84042. Phone: (801) 785-7687, email: building@lindon.gov. Official information: https://www.lindon.gov/251/Building-Inspection.

Lindon, Utah has adopted: 2021 International Residential Code (IRC), as amended by the State of Utah — adopted statewide under Utah Code Title 15A (State Construction and Fire Codes Act), § 15A-2-103. No Lindon-specific code-edition statement was found on lindon.gov's Building & Inspection page, Building Department Forms & Applications page, or in the current Fee Schedule; Lindon has not published a local amendment opting out of the statewide code, so the statutory statewide edition is used here rather than invented city-specific text.; 2024 International Building Code (IBC), as amended by the State of Utah — effective statewide July 1, 2026 per Utah Code § 15A-2-103 (2026 General Session update); no Lindon-specific IBC edition statement found on the city's own site.; 2023 National Electrical Code (NEC) — adopted statewide under Utah Code § 15A-2-103; no Lindon-specific NEC edition statement found on the city's own site.; 2015 International Plumbing Code (IPC), Table 403.1 — cited by name in Lindon City's own current Fee Schedule (Sewer Utility Fee and Water Utility Fee sections: 'Based on Table 403.1 in 2015 International Plumbing Code as currently adopted or as may be amended'), effective 07/01/2026 fee schedule. This is Lindon's own published reference to a specific plumbing-code edition/table used for utility base-rate sizing, distinct from the statewide construction-code IPC edition.; Other 2024 International Codes (IMC, IEBC, IECC) — adopted statewide alongside the 2024 IBC per Utah Code § 15A-2-103, effective July 1, 2026; not individually itemized by name on Lindon's own Building & Inspection page.. Local amendments apply — see the Lindon overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lindon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.