Lindon's 2025-2026 Fee Schedule does not publish a distinct EV-charger or EVSE fee line item, and Lindon has no general electrical-permit category — standalone residential electrical work is only itemized as 'Service Panel Replacement (power)' under the Miscellaneous Residential Permit Fees line. A direct, full-text search of the fee schedule PDF found zero mentions of 'EV,' 'electric vehicle,' 'charging station,' or 'EVSE.' An EV charger install that requires a panel or service upgrade most closely resembles that $85 flat-fee category, but this has not been explicitly confirmed by the city as the governing fee for EV charger installs, so this entry is marked partial confidence rather than verified.

Reviewed 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential property
  • Likely requires a building permit application through Lindon's CivicReview portal
  • Confirm fee category directly with the Building Inspection Division before applying, since no EV-specific or general electrical-permit line item is published

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Closest published analog: Service Panel Replacement (power) — Miscellaneous Residential Permit FeeLindon City 2025-2026 Fee Schedule, 'Miscellaneous Residential Permit Fees' (added 6/03/2024 with Ordinance 2024-8-O). Not an EV-specific or confirmed EV-charger fee — Lindon has no distinct electrical-permit category, so this is the closest itemized fee for panel-related electrical work. Unconfirmed for EV charger installs specifically.
$85.00 flat

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Lindon?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Trade-Specific Final Inspection

    Final inspection scheduled with the Building Department, (801) 785-7687, at least 24 hours in advance, per Lindon's standard inspection-scheduling requirement.

See the full Lindon inspection guide — scheduling & re-inspection fees →

Tips

  • Lindon has no distinct EV charger / EVSE permit type or fee, and no general electrical-permit category at all — confirm the correct fee category with the Building Inspection Division, (801) 785-7687, before applying.
  • If the install involves a panel or service change, the $85 'Service Panel Replacement (power)' Miscellaneous Residential Permit Fee is the closest published analog, though not explicitly confirmed for EV chargers.
  • Underground electrical service work may require separate coordination with Rocky Mountain Power, (888) 221-7070, in addition to the city permit.

Frequently asked questions

Lindon requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential property; Likely requires a building permit application through Lindon's CivicReview portal; Confirm fee category directly with the Building Inspection Division before applying, since no EV-specific or general electrical-permit line item is published. If your project isn't listed, confirm with Lindon City Building Department (Community Development) at (801) 785-7687 before starting work.

Not published. Lindon's 2025-2026 Fee Schedule does not list an EV-charger, EVSE, or general electrical-permit fee category. The closest itemized fee is the $85 flat 'Service Panel Replacement (power)' line under Miscellaneous Residential Permit Fees, but the city has not explicitly confirmed this applies to EV charger installs — contact the Building Inspection Division to confirm before applying.

Lindon does not publish a plan-review timeline for this permit. Contact Lindon City Building Department (Community Development) at (801) 785-7687 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Lindon requires 1 inspection(s) for an ev charger / evse permit, in order: Trade-Specific Final Inspection. Schedule each through Lindon City Building Department (Community Development) ((801) 785-7687).

Apply through Lindon City Building Department (Community Development) at 100 North State Street, Lindon, UT 84042. Phone: (801) 785-7687, email: building@lindon.gov. Official information: https://www.lindon.gov/251/Building-Inspection.

Lindon, Utah has adopted: 2021 International Residential Code (IRC), as amended by the State of Utah — adopted statewide under Utah Code Title 15A (State Construction and Fire Codes Act), § 15A-2-103. No Lindon-specific code-edition statement was found on lindon.gov's Building & Inspection page, Building Department Forms & Applications page, or in the current Fee Schedule; Lindon has not published a local amendment opting out of the statewide code, so the statutory statewide edition is used here rather than invented city-specific text.; 2024 International Building Code (IBC), as amended by the State of Utah — effective statewide July 1, 2026 per Utah Code § 15A-2-103 (2026 General Session update); no Lindon-specific IBC edition statement found on the city's own site.; 2023 National Electrical Code (NEC) — adopted statewide under Utah Code § 15A-2-103; no Lindon-specific NEC edition statement found on the city's own site.; 2015 International Plumbing Code (IPC), Table 403.1 — cited by name in Lindon City's own current Fee Schedule (Sewer Utility Fee and Water Utility Fee sections: 'Based on Table 403.1 in 2015 International Plumbing Code as currently adopted or as may be amended'), effective 07/01/2026 fee schedule. This is Lindon's own published reference to a specific plumbing-code edition/table used for utility base-rate sizing, distinct from the statewide construction-code IPC edition.; Other 2024 International Codes (IMC, IEBC, IECC) — adopted statewide alongside the 2024 IBC per Utah Code § 15A-2-103, effective July 1, 2026; not individually itemized by name on Lindon's own Building & Inspection page.. Local amendments apply — see the Lindon overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lindon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.