EV Charger / EVSE Permit — Lindon, Utah · Requirements sheet
Reviewed 2026-07-20 · Source: https://www.lindon.gov/DocumentCenter/View/626/FY2025-26-Fee-Schedule-includes-all-Utility-Rates-and-Fees-PDF
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Lindon, Utah
Lindon's 2025-2026 Fee Schedule does not publish a distinct EV-charger or EVSE fee line item, and Lindon has no general electrical-permit category — standalone residential electrical work is only itemized as 'Service Panel Replacement (power)' under the Miscellaneous Residential Permit Fees line. A direct, full-text search of the fee schedule PDF found zero mentions of 'EV,' 'electric vehicle,' 'charging station,' or 'EVSE.' An EV charger install that requires a panel or service upgrade most closely resembles that $85 flat-fee category, but this has not been explicitly confirmed by the city as the governing fee for EV charger installs, so this entry is marked partial confidence rather than verified.
Reviewed 2026-07-20 · Source
When you need this permit
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential property
- Likely requires a building permit application through Lindon's CivicReview portal
- Confirm fee category directly with the Building Inspection Division before applying, since no EV-specific or general electrical-permit line item is published
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Lindon City 2025-2026 Fee Schedule, 'Miscellaneous Residential Permit Fees' (added 6/03/2024 with Ordinance 2024-8-O). Show full citationHide
Lindon City 2025-2026 Fee Schedule, 'Miscellaneous Residential Permit Fees' (added 6/03/2024 with Ordinance 2024-8-O). Not an EV-specific or confirmed EV-charger fee — Lindon has no distinct electrical-permit category, so this is the closest itemized fee for panel-related electrical work. Unconfirmed for EV charger installs specifically.Review timeline
Inspection process
- 1
Trade-Specific Final Inspection
Final inspection scheduled with the Building Department, (801) 785-7687, at least 24 hours in advance, per Lindon's standard inspection-scheduling requirement.
See the full Lindon inspection guide — scheduling & re-inspection fees →
Tips
- Lindon has no distinct EV charger / EVSE permit type or fee, and no general electrical-permit category at all — confirm the correct fee category with the Building Inspection Division, (801) 785-7687, before applying.
- If the install involves a panel or service change, the $85 'Service Panel Replacement (power)' Miscellaneous Residential Permit Fee is the closest published analog, though not explicitly confirmed for EV chargers.
- Underground electrical service work may require separate coordination with Rocky Mountain Power, (888) 221-7070, in addition to the city permit.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lindon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Lindon's permit history is searchable by address
4,003 permits on record for Lindon, 2016–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
73% of Lindon's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Lindon
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Lindon project checklist
Describe your project once and get every permit, document, and fee it triggers in Lindon — in one checklist. Free, for any city and any number of projects.
Get started →