Skip to main content
PermitBase

Plumbing Permit in Pleasant View, Utah

Required for plumbing installations and alterations in Pleasant View regulated by the statewide-adopted International Plumbing Code. Fee is a flat inspection charge per the Consolidated Fee Schedule; sewer and water lateral work carries a separate lateral inspection fee.

Verified 2026-07-08 · Source

When you need this permit

  • New plumbing fixture installations, water heater installation/replacement, or water/sewer/gas line work
  • Work regulated by the statewide-adopted IPC
  • Building Permit Application submitted through the City Inspect online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Inspection FeePleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Plumbing Inspection ................................................................................................................... $75.00.'
$75.00
Sewer Lateral Inspection FeePleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Sewer Lateral Inspection............................................................................................................. $75.00.'
$75.00
Water Lateral Inspection FeePleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Water Lateral Inspection ............................................................................................................. $75.00.'
$75.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Pleasant View building department
~14–14 business days

How long did your Plumbing Permit permit actually take in Pleasant View?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Plumbing

    Scheduled via City Inspect (pleasantview.cityinspect.com) or Sunrise Engineering (1-800-560-6151).

  2. 2

    Sewer/Water Lateral

    For water or sewer lateral inspections, contact the City Office directly at 801-782-8529 (not Sunrise Engineering), per Pleasant View's official Permits page.

See the full Pleasant View inspection guide — scheduling & re-inspection fees →

Tips

  • Water and sewer lateral inspections are scheduled with the City Office (801-782-8529) directly, not through Sunrise Engineering or the standard City Inspect building inspection flow.
  • Cost of a 3/4-inch or 1-inch water meter is $525.00 flat per the Consolidated Fee Schedule; larger meters are billed at actual cost of meter and installation.

Frequently asked questions

Pleasant View requires a plumbing permit for: New plumbing fixture installations, water heater installation/replacement, or water/sewer/gas line work; Work regulated by the statewide-adopted IPC; Building Permit Application submitted through the City Inspect online portal. If your project isn't listed, confirm with Pleasant View City Planning, Zoning & Building Department at (801) 782-8529 before starting work.

Per Pleasant View's Consolidated Fee Schedule (as of July 1, 2026), the Plumbing Inspection fee is a flat $75.00; sewer and water lateral inspections are each a separate flat $75.00.

Plan review for a plumbing permit in Pleasant View typically runs 14–14 business days. This is an estimate, not a published figure — confirm current review times with Pleasant View City Planning, Zoning & Building Department at (801) 782-8529.

You'll need: Building Permit Application (City Inspect). See the required-documents checklist on this page for details on each.

Pleasant View requires 2 inspection(s) for a plumbing permit, in order: Plumbing, Sewer/Water Lateral. Schedule each through Pleasant View City Planning, Zoning & Building Department ((801) 782-8529).

Apply through Pleasant View City Planning, Zoning & Building Department at 520 W Elberta Dr, Pleasant View, UT 84414. Phone: (801) 782-8529. Office hours: Mon–Thu 8:00 AM – 5:00 PM; Fri 8:00 AM – 12:00 PM. Official information: https://www.pleasantviewut.gov/168/Planning-Zoning-Building.

Pleasant View, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide code per Utah Code § 15A-2-103(1)(a), in force since July 1, 2026, under the statewide preemption mandate of § 15A-1-204 (State Construction and Fire Codes Act); Pleasant View's own codified Title 15.04 text still references the 2000 IBC (Ord. 2002-10), but that codification is stale and superseded by the mandatory statewide cycle.; 2021 International Residential Code (IRC) — current statewide code per Utah Code § 15A-2-103(1)(b) (unchanged by the July 1, 2026 code cycle flip); Pleasant View's Consolidated Fee Schedule (as of July 1, 2026) still labels its Table for Permit Fees 'Appendix L, 2015 IRC,' which is stale fee-table boilerplate, not evidence the city enforces an outdated code edition — plan review and inspections apply the current statewide IRC per § 15A-1-204.; 2024 International Plumbing Code (IPC) — current statewide code per Utah Code § 15A-2-103(1)(d); Pleasant View's codified Title 15.16.010 references the 2000 IPC (stale codification), superseded by § 15A-1-204.; 2024 International Mechanical Code (IMC) / International Fuel Gas Code (IFGC) — current statewide code per Utah Code § 15A-2-103(1)(e)/(f); Pleasant View's codified Title 15.12.010 references the 2000 IMC (stale codification), superseded by § 15A-1-204.; 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide code per Utah Code § 15A-2-103(1)(h) (a single edition applies statewide, no separate residential/commercial split); Pleasant View's codified Title 15.28.010 references the 2000 IECC (stale codification), superseded by § 15A-1-204.; 2023 National Electrical Code (NEC) — current statewide code per Utah Code § 15A-2-103(1)(g) (unchanged by the July 1, 2026 code cycle flip); Pleasant View's codified Title 15.20.010 references the 1999 NEC (stale codification), superseded by § 15A-1-204.. Local amendments apply — see the Pleasant View overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant View building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.