Electrical Permit in Pleasant View, Utah
Required for electrical work in Pleasant View regulated by the statewide-adopted National Electrical Code. Fee is a flat inspection charge per the Consolidated Fee Schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Consolidated Fee Schedule (as of July 1, 2026) does not publish a separate EV-specific fee line item. Residential rooftop and ground-mount solar PV installations likewise fall under the general valuation-based Building Permit Fee (Table for Permit Fees, Appendix L) plus this flat $75.00 Electrical Inspection fee for the electrical scope — a full-text review of the Consolidated Fee Schedule (as of July 1, 2026) found no separate solar-specific permit type or fee line item.
Verified 2026-07-19 · Source
When you need this permit
- New electrical circuits, wiring installations, or service upgrades
- Work regulated by the statewide-adopted NEC
- Building Permit Application submitted through the City Inspect online portal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Electrical Inspection.................................................................................................................... Show full citationHide
Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Electrical Inspection.................................................................................................................... $75.00.' If the electrical work is part of a larger valuation-based project, the general Building Permit Fee (Table for Permit Fees, Appendix L) and Plan Check Fee also apply; the $75.00 figure applies to standalone/minimum electrical permits, consistent with the fee schedule's 'Misc. permits... $100.00 minimum fee for any building permit' baseline for trade-only work.Review timeline
Inspection process
- 1
Electrical
Electrical inspection scheduled via City Inspect (pleasantview.cityinspect.com) or Sunrise Engineering (1-800-560-6151), per the city's official Inspections page.
See the full Pleasant View inspection guide — scheduling & re-inspection fees →
Tips
- Approved building plans must be on-site at the time of every inspection, per Pleasant View's official Permits page.
- Physical inspections are contracted to Sunrise Engineering (1-800-560-6151); the City Office (801-782-8529) does not perform electrical inspections directly.
- EV charger (EVSE) installations do not have their own permit type in Pleasant View — apply for this Electrical Permit and pay the flat $75.00 Electrical Inspection fee like any other standalone electrical work.
- Solar PV installations do not have a dedicated permit type or fee tier in Pleasant View either — the project is billed under the general valuation-based Building Permit Fee plus this $75.00 flat Electrical Inspection fee for the electrical scope; confirm current requirements with the Building Department, (801) 782-8529, before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Applications & forms
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant View building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Pleasant View's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Pleasant View yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Pleasant View lands. Privacy.
Other permits in Pleasant View
Electrical Permit in other cities
Compare electrical permit fees across Utah →
Look up this fee in a different city →
Related guides
Now live
Build your Pleasant View project checklist
Describe your project once and get every permit, document, and fee it triggers in Pleasant View — in one checklist. Free, for any city and any number of projects.
Get started →