EV Charger / EVSE Permit in Pleasant View, Utah

Pleasant View has no distinct EV charger/EVSE permit type or fee line item — EV charger (EVSE) installation is billed under the city's standard Electrical Permit, using the same flat $75.00 Electrical Inspection fee that applies to any other standalone electrical work. Pleasant View's own Electrical Permit entry explicitly states: 'EV charger (EVSE) installations do not have their own permit type in Pleasant View — apply for this Electrical Permit and pay the flat $75.00 Electrical Inspection fee like any other standalone electrical work.' A direct check of the city's Consolidated Fee Schedule (as of July 1, 2026) confirms this flat fee and found no separate 'EV' or 'electric vehicle' line item.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Pleasant View
  • Work regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g))
  • Building Permit Application submitted through the City Inspect online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Inspection Fee (covers EV charger/EVSE circuit work)Pleasant View Consolidated Fee Schedule (as of July 1, 2026): 'Electrical Inspection $75.00.' EV charger (EVSE) installations do not have their own permit type in Pleasant View — the standard flat Electrical Inspection fee applies. Confirmed via existing Pleasant View Electrical Permit entry in this dataset, which explicitly documents this treatment.
$75.00
Misc. Permits Minimum Fee (general building permit floor, where applicable)Pleasant View Consolidated Fee Schedule: 'Misc. permits — $100.00 minimum fee for any building permit.'
$100.00 minimum fee for any building permit

Review timeline

Plan reviewTypical estimate — confirm current times with the Pleasant View building department
~14–14 business days

How long did your EV Charger / EVSE Permit permit actually take in Pleasant View?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Electrical

    Electrical inspection scheduled via City Inspect (pleasantview.cityinspect.com) or Sunrise Engineering (1-800-560-6151), per the city's official Inspections page.

See the full Pleasant View inspection guide — scheduling & re-inspection fees →

Tips

  • EV charger (EVSE) installations do not have their own permit type in Pleasant View — apply for the standard Electrical Permit and pay the flat $75.00 Electrical Inspection fee like any other standalone electrical work.
  • Approved building plans must be on-site at the time of every inspection, per Pleasant View's official Permits page.
  • Physical inspections are contracted to Sunrise Engineering (1-800-560-6151); the City Office (801-782-8529) does not perform electrical inspections directly.

Frequently asked questions

Pleasant View requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Pleasant View; Work regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g)); Building Permit Application submitted through the City Inspect online portal. If your project isn't listed, confirm with Pleasant View City Planning, Zoning & Building Department at (801) 782-8529 before starting work.

No. Pleasant View does not have a distinct EV-charger permit type. Per the city's Consolidated Fee Schedule (as of July 1, 2026), EV charger/EVSE installations are billed under the standard Electrical Permit's flat $75.00 Electrical Inspection fee, the same fee used for any other standalone electrical work.

Plan review for an ev charger / evse permit in Pleasant View typically runs 14–14 business days. This is an estimate, not a published figure — confirm current review times with Pleasant View City Planning, Zoning & Building Department at (801) 782-8529.

You'll need: Building Permit Application (City Inspect). See the required-documents checklist on this page for details on each.

Pleasant View requires 1 inspection(s) for an ev charger / evse permit, in order: Electrical. Schedule each through Pleasant View City Planning, Zoning & Building Department ((801) 782-8529).

Apply through Pleasant View City Planning, Zoning & Building Department at 520 W Elberta Dr, Pleasant View, UT 84414. Phone: (801) 782-8529. Office hours: Mon–Thu 8:00 AM – 5:00 PM; Fri 8:00 AM – 12:00 PM. Official information: https://www.pleasantviewut.gov/168/Planning-Zoning-Building.

Pleasant View, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — current statewide code per Utah Code § 15A-2-103(1)(a), in force since July 1, 2026, under the statewide preemption mandate of § 15A-1-204 (State Construction and Fire Codes Act); Pleasant View's own codified Title 15.04 text still references the 2000 IBC (Ord. 2002-10), but that codification is stale and superseded by the mandatory statewide cycle.; 2021 International Residential Code (IRC) — current statewide code per Utah Code § 15A-2-103(1)(b) (unchanged by the July 1, 2026 code cycle flip); Pleasant View's Consolidated Fee Schedule (as of July 1, 2026) still labels its Table for Permit Fees 'Appendix L, 2015 IRC,' which is stale fee-table boilerplate, not evidence the city enforces an outdated code edition — plan review and inspections apply the current statewide IRC per § 15A-1-204.; 2024 International Plumbing Code (IPC) — current statewide code per Utah Code § 15A-2-103(1)(d); Pleasant View's codified Title 15.16.010 references the 2000 IPC (stale codification), superseded by § 15A-1-204.; 2024 International Mechanical Code (IMC) / International Fuel Gas Code (IFGC) — current statewide code per Utah Code § 15A-2-103(1)(e)/(f); Pleasant View's codified Title 15.12.010 references the 2000 IMC (stale codification), superseded by § 15A-1-204.; 2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide code per Utah Code § 15A-2-103(1)(h) (a single edition applies statewide, no separate residential/commercial split); Pleasant View's codified Title 15.28.010 references the 2000 IECC (stale codification), superseded by § 15A-1-204.; 2023 National Electrical Code (NEC) — current statewide code per Utah Code § 15A-2-103(1)(g) (unchanged by the July 1, 2026 code cycle flip); Pleasant View's codified Title 15.20.010 references the 1999 NEC (stale codification), superseded by § 15A-1-204.. Local amendments apply — see the Pleasant View overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant View building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.