Skip to main content
PermitBase

West Haven building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for West Haven, Utah.

Last verified 2026-07-07 · Source · Embed this page’s badge · Version history

Building department

Address
4150 S 3900 W, West Haven, UT 84401
Phone
385-389-2690
Office hours
Monday–Thursday, 7:00 AM – 5:00 PM (closed Friday), per the city's official Building Department page. Building permit submittal and inspection requests are handled online via the CityInspect portal (registration required) or by email to the Building Department.

Inspection guide

See how inspections work in West Haven — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — current statewide code per Utah Code § 15A-2-103(1)(a), in force since July 1, 2026 (superseded the 2021 IBC). Show full text

    2024 International Building Code (IBC), including Appendices C and J — current statewide code per Utah Code § 15A-2-103(1)(a), in force since July 1, 2026 (superseded the 2021 IBC). NOTE: West Haven City's own official Building Department page has NOT been updated for this flip — re-checked live 2026-07-16, it still reads '2021 International Building Code (IBC) (Effective July 1, 2026, the 2024 codes will be required)', future-tense language that is now stale since that date has passed. The statewide-adopted 2024 edition governs regardless of the city's unrevised page.

  • 2021 International Residential Code (IRC) — current statewide code per Utah Code § 15A-2-103(1)(b), unchanged by the July 1, 2026 code cycle flip
  • 2024 International Mechanical Code (IMC) — current statewide code per Utah Code § 15A-2-103(1)(e), in force since July 1, 2026 (superseded the 2021 IMC). the statewide-adopted 2024 edition governs.
  • 2024 International Plumbing Code (IPC) — current statewide code per Utah Code § 15A-2-103(1)(d), in force since July 1, 2026 (superseded the 2021 IPC). NOTE: West Haven's official Building Department page uses the same stale future-tense '2021... (Effective July 1, 2026, the 2024 codes will be required)' phrasing; the statewide-adopted 2024 edition governs.
  • 2024 International Fuel Gas Code (IFGC) — current statewide code per Utah Code § 15A-2-103(1)(f), in force since July 1, 2026 (superseded the 2021 IFGC). Show full text

    2024 International Fuel Gas Code (IFGC) — current statewide code per Utah Code § 15A-2-103(1)(f), in force since July 1, 2026 (superseded the 2021 IFGC). NOTE: West Haven's official Building Department page uses the same stale future-tense phrasing. The city's Residential Basement Finish guide separately cites IFGC 406.4 (concealed gas piping air test) as an active code reference, unaffected by the edition-number update.

  • 2024 International Energy Conservation Code (IECC) — current statewide code per Utah Code § 15A-2-103(1)(h), in force since July 1, 2026 (superseded the 2021 IECC; one edition applies statewide, no separate residential/commercial split).
  • 2023 National Electrical Code (NEC) — current statewide code per Utah Code § 15A-2-103(1)(g), unchanged by the July 1, 2026 code cycle flip. Show full text

    2023 National Electrical Code (NEC) — current statewide code per Utah Code § 15A-2-103(1)(g), unchanged by the July 1, 2026 code cycle flip. NOTE: this is a SEPARATE, pre-existing error on West Haven's official Building Department page (unrelated to the July 1, 2026 code-cycle flip) — the page states '2020 National Electrical Code (NEC) remains in effect,' re-confirmed live 2026-07-16. The 2023 NEC has been the statewide-adopted edition since before the prior verification (2026-07-07); the city's page has not been corrected.

  • Utah Code Title 15A, Chapter 3 (State Amendments to the adopted construction codes) — referenced directly by the city's Building Department page via a 'Utah State Amendments' link to the Utah Legislature's own code text.

Permit types & fees

West Haven's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for West Haven yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when West Haven lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
3units

3 buildings · $1.7M valuation

Trailing 12 months
134units

12 of 12 months reported · #52 in Utah coverage by units

Year to date (2026 YTD through 2026-07)
60units

60 buildings · $30.5M valuation

7 month(s) reported to Census

Full year 2025
215units

215 buildings · $94M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • West Haven City Building Department is open Monday–Thursday, 7:00 AM – 5:00 PM (closed Fridays), per the official Building Department page. All permit submittals and inspection requests go through the CityInspect online portal or by direct email to the department.
  • West Haven publishes an explicit plan-review turnaround on its Building Department page: 7-14 working days for residential permits and 14-21 working days for commercial permits.
  • Unlike a flat or valuation-based fee table, West Haven's core Building Permit Fee is set by reference to WHCC § 151.15 (as amended) — the fee schedule does not itemize the underlying dollar amounts for that section; Plan Review Fees are calculated as a percentage (20% residential / 65% commercial) of that Building Permit Fee.
  • Since July 1, 2026, West Haven (per statewide Utah adoption, Utah Code § 15A-2-103) is governed by the 2024 IBC/IMC/IPC/IFGC/IECC editions and the 2021 IRC (unchanged).
  • Sheds/detached garages under 200 sq. ft. need NO building permit UNLESS electrical, mechanical, or plumbing is added — a common point of confusion, since the city's own guide heading references a different '120 square feet' threshold in one subheading while the operative rule text says 200 square feet throughout; the 200 sq. ft. figure is used consistently in the body text of the official 'Shed & Detached Garage Guide' and is treated as authoritative here.
  • The Consolidated Fees & Fines Schedule (adopted 9/17/2025) contains an internal inconsistency on the Emergency excavation fee ($500 per the dedicated Excavation Permit Application form vs. $125 in one row of the consolidated table) and on the general Reinspection Fee ($50 in the main BUILDING/ENGINEERING list vs. $100 under the separate 'Re-inspection Fees' subsection) — both published figures are retained rather than silently resolved, since no superseding clarification was found.
  • The Accessory Dwelling Unit or Short-Term Rental Permit is published in the fee schedule at $0.00, but no standalone ADU/STR application form, ordinance, or standards document was locatable on westhavenut.gov as of 2026-07-07 — marked 'partial' confidence rather than omitted, since it is a real, named, fee-schedule-tracked permit category.

Comparable nearby cities

Pleasant View
Both in Weber County9 shared permit types~8 mi away
Compare fees →
Roy
Both in Weber County8 shared permit types~3 mi away
Compare fees →
Farr West
Both in Weber County8 shared permit types~6 mi away
Compare fees →