Sign Permit in Show Low, Arizona
Required for installation of signage in the City of Show Low, administered by the Planning & Zoning Department under Title 19.100 of the Show Low Zoning Ordinance, with its own dedicated flat fee table separate from the Building Safety Department's valuation-based fee model.
Verified 2026-07-06 · Source
When you need this permit
- Sign Permit Application required per Title 19.100 of the Show Low Zoning Ordinance, administered by Planning & Zoning (928-532-4040)
- Two (2) copies of a detailed site plan required, including sign size/height/shape sketch, adjacent streets and rights-of-way, setbacks, dimensioned drawings, allowable sign area calculation, building lineal frontage measurement, materials/mounting/lighting description, and footing/engineering details for freestanding or monument signs
- Fees are not required to be submitted with the application but must be paid prior to permit issuance
- Incomplete applications are not considered received and may delay consideration
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final
Installed sign verified against approved dimensions, placement, and footing/engineering details
See the full Show Low inspection guide — scheduling & re-inspection fees →
Tips
- The City's own Sign Permit Submittal Checklist states the standard review period for a complete sign permit submittal is 10 business days — a faster, dedicated timeline distinct from the general 30/40-working-day building-permit framework.
- Fees do not need to be paid at application time, only before the permit is actually issued.
- Portable signs (A-frame/sandwich-board) are the only sign type with a recurring (annual) fee — all other sign fees are one-time flat charges per sign.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Show Low building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Show Low
Sign Permit in other cities
Compare sign permit fees across Arizona →
Look up this fee in a different city →