Residential Building Permit (New Construction) — Show Low, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.showlowaz.gov/o/cosl/page/city-permits-and-applications
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Construction) in Show Low, Arizona
Required for new single-family, multi-family, and recreational-vehicle dwelling-unit construction in the City of Show Low. Reviewed against the 2018 IRC/IBC and City of Show Low amendments (Show Low Municipal Code Title 18). Applications are submitted in person at City Hall, 180 N. 9th Street.
Verified 2026-07-06 · Source
When you need this permit
- Building permit required for new residential construction within Show Low city limits
- Plans must comply with the 2018 IRC/IBC and City of Show Low Climatic and Geographic Design Criteria (90 mph wind, Exposure C; Seismic Zone B; 50 psf ground snow load; 18-inch frost line)
- Two (2) copies of plans and specifications required at submittal (Show Low Municipal Code § 18.15.070)
- Applicant selects either Standard Plan Review (30 working days) or Non-Standard Plan Review (two sequential 20-working-day phases, 40 working days total) per § 18.15.070
- A $200 non-refundable-if-forfeited deposit is required at application and plan submittal, applied to the plan review fee (20% of the Building Permit Fee)
- Contractor must hold a valid Arizona ROC license, or the applicant must be the bona fide property owner Contractor
- Assessor's Parcel Number and a scaled site plan (24"x36" max, showing actual — not minimum — setbacks on all four sides) required with the application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Footings
Before concrete pour; no footing/foundation inspection approved without clearly delineated, accurate property lines and yard setbacks
- 2
Stem Wall / Slab Reinforcement
Verifies stem wall construction and slab reinforcement (fiber mesh, woven wire mesh, or 3/8-inch rebar at 30 in O.C.)
- 3
Under-Floor Framing
Framing beneath the floor system prior to enclosure
- 4
Roof Sheathing/Nail
Roof sheathing and nailing pattern before roofing material application
- 5
Framing
Structural framing, connections, and egress per 2018 IRC/IBC and City design criteria
- 6
Insulation
Wall (R-11 minimum) and ceiling (R-19 minimum) insulation, per City amendment to IRC Chapter 11
- 7
Drywall Nail
Fastening pattern verification prior to taping/finishing
- 8
Water Service/Sewer Service, Underground Plumbing
Underground utility connections before backfill
- 9
Rough Plumbing/Framing/Electrical/Heating Ducts/Vents
Combined rough-in inspection prior to wall closure
- 10
Gas Yard Line, Final Gas Test
Gas piping test at minimum 3 lb PSI for 10 minutes on a 1/10-lb-increment gauge
- 11
Electric Service
Service entrance and panel verification
- 12
Final
All work complete per approved plans; Certificate of Occupancy or Temporary Certificate of Occupancy issued by Building Safety
See the full Show Low inspection guide — scheduling & re-inspection fees →
Tips
- Per Show Low Municipal Code § 18.15.070, Standard Plan Review targets 30 working days for all city approvals; Non-Standard Plan Review (the A.R.S. § 9-835-compliant two-phase process) takes 20 working days for Administrative Review plus 20 working days for Substantive Review, for 40 working days total. Neither clock includes time the applicant spends responding to city comments.
- The $200 deposit for single-family residential plan review is forfeited to the City if the permit is not issued within 180 days of application.
- Inspections must be called in 24 hours in advance; as of October 1, 2024, requests made after 3:00 p.m. are scheduled two business days later rather than the next business day.
- IRC Chapter 11 (Energy Efficiency) is explicitly excluded from the City's adopted IRC — City-set minimums of R-11 walls / R-19 ceiling govern instead.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Show Low building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Show Low
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Arizona →
Look up this fee in a different city →
Now live
Build your Show Low project checklist
Describe your project once and get every permit, document, and fee it triggers in Show Low — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →