Change of Use / Certificate of Compliance — Show Low, Arizona · Requirements sheet
Verified 2026-08-15 · Source: https://showlow.municipal.codes/Code/18.20
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Use / Certificate of Compliance in Show Low, Arizona
Covers a change in the use or occupancy of an existing building or space in the City of Show Low (for example converting a retail suite to a restaurant). The City publishes no application named 'Change of Use' — its complete permit inventory on the City Permits & Applications page is Accessory, Commercial, Fence, Short Term Rental Registration, Plumbing, Sign, Shed, Solar, Additions, Manufactured Home, Water/Sewer Connection and Residential, plus Conditional Use Permits, Temporary Permits, Business Permits and Other Applications (207 Waiver, Right of Way Permit, Special Inspection Certificate). A use change is instead handled through three existing City instruments, each independently grounded in the Show Low Municipal Code: (1) the Commercial Permit Application on its tenant-improvement track for the physical work; (2) a Certificate of Compliance under Municipal Code § 18.20.020, which the Code expressly ties to 'use change' in an existing structure, or a new Certificate of Occupancy under § 18.20.010; and (3) a Conditional Use Permit from Planning & Zoning where the new use is a conditional rather than permitted use in the zoning district.
Verified 2026-08-15 · Source
When you need this permit
- Show Low Municipal Code § 18.20.020 (Certificate of compliance): 'The certificate of compliance is for existing structures. It may be associated with removing, relocating, renovation, use change, addition and existing structure or housing code. A letter of certification (duplicate certification) may be for other than the original issue.' This is the only place in the Show Low code that names a use change as its own certificate trigger.
- Show Low Municipal Code § 18.20.010 (Certificate of occupancy): when final inspection indicates a building is in full compliance with applicable codes, a certificate of occupancy shall be issued; no building may be occupied for any reason or purpose until after a final inspection has been performed and the certificate of occupancy issued. A temporary certificate of occupancy may be issued for a specified period where uncompleted items are not a threat to occupant health and safety. Certificates of occupancy are not issued for accessory buildings.
- Physical work associated with a change of use is permitted on the City's Commercial Permit Application, which requires an Occupancy Classification, Type of Construction and number of stories to be stated on the form, plus a material cost valuation for all commercial jobs.
- Show Low Municipal Code § 18.15.060: a pre-application meeting is required for all new commercial construction and substantial commercial remodels or additions; a commercial tenant improvement submittal requires four (4) copies of plans and specifications (versus six (6) for new commercial).
- Show Low Municipal Code § 18.25.080 defines 'new development' to include 'any change in use of an existing building, structure or lot requiring any form of city building permit or approval and which increases the demand for one (1) or more public facilities' — so a change of use can trigger development (impact) fees.
- Show Low Municipal Code § 18.25.100(B)(2): 'Upon receipt of an application for a building permit, the city shall determine whether it is for a change in use. In such cases, the development fee due shall be based only on the incremental increase in the fee for the additional public facilities needed for the change in use.' Development fees are calculated by the City and paid before the building permit is issued.
- Where the proposed new use is a conditional use in the zoning district rather than a use permitted by right, a Conditional Use Permit is required from Planning & Zoning; the Planning and Zoning Commission is empowered to grant or deny applications for Conditional Use Permits and to impose conditions upon them, and the process runs application → public notice → public hearing → appeals.
- A change of use in a commercial building also triggers fire review by the Timber Mesa Fire and Medical District (the City adopts no fire code) — see this file's fire-sprinkler-alarm-permit entry; the District's Commercial Development Plan review fee is expressly for 'new and remodel projects'.
- Contractor licensing: § 18.15.030 bars issuance of a permit to anyone contracting regulated work who does not hold a valid, unexpired, unrevoked Arizona contractor's license, unless the applicant is the bona fide owner of the premises. Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In (Plumbing / Framing / Electrical / Mechanical)
Combined rough-in inspection on tenant-improvement work before wall closure, where the scope requires it
- 2
Fire District Inspection
Timber Mesa Fire and Medical District conducts final inspections of fire protection systems prior to issuance of a Certificate of Occupancy by the City Building Department; request a minimum of 48 business hours in advance
- 3
Final / Certificate of Occupancy or Certificate of Compliance
When final inspection indicates full compliance with applicable codes, Building Safety issues the certificate; the space may not be occupied for any purpose before it is issued (§ 18.20.010). For a use change in an existing structure the instrument the Code names is the Certificate of Compliance (§ 18.20.020).
See the full Show Low inspection guide — scheduling & re-inspection fees →
Tips
- There is no form called 'Change of Use Permit' in Show Low. The instrument the Code actually names for a use change in an existing structure is the Certificate of Compliance (§ 18.20.020) — ask Building Safety for it by that name.
- A change of use does not automatically mean full development-impact fees: § 18.25.100(B)(2) limits the development fee on a change in use to the INCREMENTAL increase for the additional public facilities needed, and § 18.25.090(C)(3) exempts activity that does not increase demand for public facilities at all.
- Check the zoning district use table before budgeting. If the new use is permitted by right, no Conditional Use Permit is needed and neither the $150 filing fee nor the public-hearing calendar applies; if it is a conditional use, the Planning and Zoning Commission — not staff — decides, and may attach conditions.
- A pre-application meeting is mandatory for substantial commercial remodels under § 18.15.060 — call 928-532-4040 before assembling a submittal; commercial tenant improvements need four (4) plan sets and a $200 deposit at submittal.
- Budget separately for the fire district. Show Low adopts no fire code, so any sprinkler, alarm, hood suppression or commercial remodel fire review is invoiced by Timber Mesa Fire and Medical District and paid directly to the District (see this file's fire-sprinkler-alarm-permit entry).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-15.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Show Low building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Show Low
Change of Use / Certificate of Compliance in other cities
Compare change of use / certificate of compliance fees across Arizona →
Look up this fee in a different city →
Now live
Build your Show Low project checklist
Describe your project once and get every permit, document, and fee it triggers in Show Low — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →