Plumbing Permit in Prescott Valley, Arizona

Required for plumbing installation, alteration, or repair work in Prescott Valley, governed by the 2018 International Plumbing Code (IPC) as adopted by the Town. Applications are submitted via the Town's GoPost ePlan portal using the Miscellaneous Plumbing Application.

Verified 2026-07-06 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, water/gas piping, and gas appliances
  • Governed by the 2018 IPC and 2018 IFGC as adopted by the Town of Prescott Valley
  • Adding, removing, altering, or replacing piping (water or gas) requires a Site Plan with 1-Line Diagram showing pipe size, lengths, burial depth, type of piping, and BTU/CFH calculations for gas
  • Adding, removing, or altering a propane tank, gas fire pit, gas-fueled generator, or gas appliance requires manufacturer's specifications
  • A water meter application located in Yavapai County (outside Town water service) requires an issued New Residential Permit from Yavapai County
  • Water Heater replacement uses a dedicated Water Heater Application; manufacturer's specifications required only if changing water heater type
  • Apply via the Town's GoPost ePlan online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Permit FeeTown of Prescott Valley Comprehensive Fee Schedule, Development Services: Mechanical, Electrical, and Plumbing Fees; charged in addition to any applicable building permit fee
Greater of $53.50 or $0.03 per square foot

Review timeline

Plan reviewPrescott Valley’s published plan-review target
30–90 business days

How long did your Plumbing Permit permit actually take in Prescott Valley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts, burial depth

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures, water heater, and gas connections verified, no leaks; scheduled via IVR inspection line

See the full Prescott Valley inspection guide — scheduling & re-inspection fees →

Tips

  • Plumbing is not separately itemized on the Town's 2026 Plan Review Turnaround Times document; as a Miscellaneous permit type it is bound by the Town's A.R.S. § 9-835 Required Timeframe Posting (30 days Administrative Completeness / 60 days Substantive Review / 90-day overall statutory ceiling).
  • A water heater 'like-for-like' replacement application requires manufacturer specifications only if the water heater TYPE is changing (e.g., tank to tankless) — otherwise the base Water Heater Application alone is sufficient.
  • If your water meter application is for a property in unincorporated Yavapai County rather than inside Town water service, you must first obtain a New Residential Permit from Yavapai County before the Town will process the plumbing permit.

Frequently asked questions

Yes, a plumbing permit (using the Water Heater Application) is required; manufacturer's specifications are only needed if you are changing the water heater type. The plumbing permit fee is the greater of $53.50 or $0.03 per square foot.

In Prescott Valley, the published Plumbing Permit Fee is: Greater of $53.50 or $0.03 per square foot. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plumbing is a Miscellaneous permit type not separately itemized in the Town's plan-review turnaround document, so it is governed by the Town's A.R.S. § 9-835 Required Timeframe Posting: 30 days for administrative completeness, 60 days for substantive review after completeness, and no greater than 90 days total from submittal to final approval or denial.

You'll need: Plumbing Application / Miscellaneous Plumbing Application Checklist; Site Plan with 1-Line Diagram. Depending on your project, Prescott Valley may also ask for: Water Heater Application (2025 revised); Manufacturer's Specifications. See the required-documents checklist on this page for details on each.

Prescott Valley requires 3 inspection(s) for a plumbing permit, in order: Underground/Slab, Rough-In, Final. Schedule each through Town of Prescott Valley Development Services Department — Building Safety / Permitting (928-759-3050 (Development Services main); 928-759-5535 (Permitting); 928-759-3060 (Inspection scheduling/IVR)).

Apply through Town of Prescott Valley Development Services Department — Building Safety / Permitting at 7501 E. Skoog Blvd. (Civic Center), Prescott Valley, AZ 86314. Phone: 928-759-3050 (Development Services main); 928-759-5535 (Permitting); 928-759-3060 (Inspection scheduling/IVR), email: permitting@prescottvalley-az.gov (permit applications); devserv@prescottvalley-az.gov (general Development Services). Office hours: Monday - Friday, 8 a.m. - 5 p.m. (Development Services Counter payment window 8 a.m. - 4 p.m.; permit pickup 8 a.m. - 5 p.m.). Applications are submitted through the Town's GoPost ePlan online portal (gopost-prescottvalley.eplansoftreview.com); walk-in/paper submittal is not the standard path.. Official information: https://www.prescottvalley-az.gov/departments/development_services/permit_center.php.

Prescott Valley, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-jurisdiction authority under state enabling statutes (A.R.S. Title 9 for municipalities). The Town of Prescott Valley runs its own Development Services Department and independently adopts and administers its own construction codes under Chapter 7 (Building Regulations) of the Town Code; it does not defer permitting to Yavapai County. Source: Town of Prescott Valley Development Services Department page and 2018 Code Design Requirements memo (Building Safety - Plans Examination, Senior Certified Plans Examiner Russ Harsh).; 2018 International Building Code (IBC), as published by the International Code Council, adopted by the Town of Prescott Valley effective January 1, 2020, under Chapter 7 of the Town Code, with Town amendments. Source: Town of Prescott Valley Development Services Department page (prescottvalley-az.gov) and 2018 Code Design Requirements memo.; 2018 International Residential Code (IRC), adopted effective January 1, 2020, with Town amendments. Source: 2018 Code Design Requirements memo, Town of Prescott Valley Development Services Department — Building Safety, Plans Examination.; 2018 International Plumbing Code (IPC), adopted effective January 1, 2020. Source: 2018 Code Design Requirements memo.; 2018 International Mechanical Code (IMC), adopted effective January 1, 2020. Source: 2018 Code Design Requirements memo.; 2018 International Fuel Gas Code (IFGC), adopted effective January 1, 2020. Source: 2018 Code Design Requirements memo.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted effective January 1, 2020 (one code cycle behind the 2018 ICC set, consistent with the NEC's separate 3-year publication cycle). Source: 2018 Code Design Requirements memo.; 2006 International Energy Conservation Code (IECC), Residential Only — the Town has NOT adopted a newer IECC edition; the 2006 edition remains the current residential energy code baseline as of this review. Source: 2018 Code Design Requirements memo (explicitly lists '2006 International Energy Conservation Code (Residential Only)').; ANSI A117.1-2009 American National Standard (Accessible and Usable Buildings and Facilities) and the 2010 ADA Standards for Accessible Design are adopted as the Town's accessibility standards. Source: 2018 Code Design Requirements memo.; As of this review, the Town has NOT adopted the 2024 ICC code suite. The Town's own Permit Center document library includes a form titled 'Acknowledging 2024 ICC Codes Not Yet Adopted,' confirming the 2018-cycle codes listed above remain current and in force; applicants must sign this acknowledgment on certain submittals. Source: Town of Prescott Valley Permit Center page (Acknowledging 2024 ICC Codes Not Yet Adopted.pdf).; Manufactured/mobile homes are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for construction/installation standards; the Town issues its own separate Manufactured/Mobile Home permit for placement, foundation/tie-down, and site improvements (listed among the Town's Building Permit categories). Source: Town of Prescott Valley Permit Center page (Manufactured Mobile Permit Application.pdf).. Local amendments apply — see the Prescott Valley overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Prescott Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.