Commercial Building Permit (New Construction) in Prescott Valley, Arizona
Required for new commercial building construction in Prescott Valley, reviewed against the 2018 IBC and Town of Prescott Valley amendments (Chapter 7 of the Town Code, effective January 1, 2020) plus ANSI A117.1-2009/2010 ADA accessibility standards. Applications use the Town's dedicated 'New Commercial Application' (part of the New Commercial Application Checklist packet, updated 12/2024), which is genuinely distinct from the Town's separate 'Commercial T.I. Application' used for interior tenant improvements to existing commercial space (see the Commercial Tenant Improvement Permit entry) — the two use different application forms, different submittal-deposit amounts ($321.00 New Commercial vs. $107.00 T.I.), and different document checklists (New Commercial requires a prior Engineering Permit, Special Inspections Agreement, Temporary Utility Agreement, and Water Meter/Water Tap applications that T.I. does not).
Verified 2026-08-01 · Source
When you need this permit
- Building permit required for new commercial building construction within Prescott Valley town limits, submitted on the Town's New Commercial Application
- Reviewed against the 2018 IBC and Town of Prescott Valley amendments, plus ANSI A117.1-2009 and the 2010 ADA Standards for Accessible Design
- Per the New Commercial Application Checklist (updated 12/2024), this step must start ONLY after a separate Engineering Permit has already been approved; applicants must contact the Permitting Office (928-759-5535) to discuss project permitting requirements and phasing — one New Commercial Application is required per building
- Plans (site plan, landscape plan, plumbing, electrical, lighting, mechanical) must be Architect- or Engineer-stamped if the project is over 3,000 square feet OR has an occupant load over 20
- A $321.00 non-refundable application deposit must be paid to the Permitting Office (928-759-5535) before the application proceeds, per the New Commercial Application Checklist and the Town of Prescott Valley Comprehensive Fee Schedule ('Deposits - Commercial/Industrial - New Construction')
- Per the Town's Temporary Utility for Construction Agreement (New Commercial/Residential Projects), the applicant must complete construction and obtain a Certificate of Occupancy within 365 calendar days of permit issuance, and may not allow 180 days to elapse without an inspection, per Chapter 7 of the Town of Prescott Valley ordinances
- Proof of Valid Contractor's License required (A.R.S. Title 32, Chapter 11, §§ 32-1168-1169) Contractor
- Apply via the Town's GoPost ePlan online portal (gopost-prescottvalley.eplansoftreview.com)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 11 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Special Inspections (if required)
Continuous on-site inspection per IBC Chapter 17 for projects with an approved Special Inspections and Testing Agreement
- 2
Foundation/Footing
Before concrete pour
- 3
Rough-In (Structural / MEP)
Framing, structural connections, and mechanical/electrical/plumbing rough-in before concealment
- 4
Final / Certificate of Occupancy
All work complete per approved plans; Certificate of Occupancy issued once Building, Public Works, Engineering, and Planning and Zoning requirements are met
See the full Prescott Valley inspection guide — scheduling & re-inspection fees →
Tips
- The Town's Standard, Fast Track, and Expedited Plan Review: Turnaround Times for 2026 (rev. 1/1/26) tiers 'Commercial Building Plans' strictly by SQUARE FOOTAGE, not by new-construction vs. tenant-improvement scope: Small (under 5,000 sf) is 40 business days SPR Goal / 45 SPR Average; Medium (5,000-50,000 sf) is 55/65; Large (50,000 sf and greater) is 65/75. Expedited Plan Review (EXPR) is a flat 15 business days across ALL three size tiers, but Fast Track (FTR) is listed as 'N/A' for every commercial tier — unlike residential, Prescott Valley does not offer an in-house Fast Track option for any commercial building permit regardless of size.
- All review timeframes operate within the outer statutory ceiling of the Town's A.R.S. § 9-835 Required Timeframe Posting (30 days Administrative Completeness / 60 days Substantive Review / 90-day overall statutory ceiling from submittal to final approval or denial).
- This permit type is for NEW commercial building construction and requires a prior approved Engineering Permit before the New Commercial Application can even be started — interior alterations to an EXISTING commercial building/tenant space use the separate, lighter-weight Commercial T.I. Application instead (lower $107 deposit, no Engineering Permit prerequisite, no Special Inspections/Temporary Utility/Water Meter-Tap forms).
- The $321.00 application deposit is paid directly to the Permitting Office by phone (928-759-5535), not through the GoPost portal itself.
- Per the Temporary Utility for Construction Agreement, failing to complete construction and obtain a Certificate of Occupancy within 365 calendar days, or allowing 180 days to elapse without an inspection, can result in penalties and permit expiration under Chapter 7 of the Town Code.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Prescott Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Prescott Valley.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Prescott Valley
Commercial Building Permit (New Construction) in other cities
Compare commercial building permit (new construction) fees across Arizona →
Look up this fee in a different city →
Now live
Build your Prescott Valley project checklist
Describe your project once and get every permit, document, and fee it triggers in Prescott Valley — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →