Solar Photovoltaic (PV) Permit in North Las Vegas, Nevada

Required for installation of rooftop or ground-mounted solar photovoltaic systems on residential and commercial properties in the City of North Las Vegas. Requires both a Building Permit (structural) and a separate Electrical Permit (wiring). NLV has a dedicated Solar Permit Application.

Verified 2026-06-30 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based per Table 3-AVaries — valuation-based on total installed cost (contract price) of the solar system; fee per Table 3-ANLV has no flat solar permit fee. Per NLV MC 15.72.170B.2–B.3 (confirmed on Municode, Supp. 144): valuation = total value of all construction work; for items not listed in Table 3-E the Building Official uses the contract price inclusive of all labor, equipment, and contractor profit. Solar PV is not enumerated in Tables 3-E or 3-F, so the total installed cost is the valuation basis. No separate flat solar fee exists.
Administrative fee$75 per permit
Plan check fee65% of permit fee
Electrical permit fee (solar wiring)Itemized per Table 3-B or 18% of building permit feeSeparate electrical permit required for the wiring/inverter portion
Re-inspection fee$100

Review timeline

~521 business days

Typical estimate — confirm current times with the North Las Vegas building department

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final — Building

    Panel mounting, racking attachment, roof penetration sealing verified

  3. 3

    Final — Electrical

    Electrical connections, inverter installation, and interconnection point verified per 2023 NEC

Tips

Frequently asked questions

Do I need two separate permits for solar panels in North Las Vegas?
Yes. A Building Permit (using the Solar Permit Application form, for structural mounting) and a separate Electrical Permit (for wiring and inverter connections) are both required in NLV. Apply at the Permit Application Center.
Is there a flat fee for solar permits in North Las Vegas?
No. NLV has no flat solar permit fee. The building permit fee is valuation-based on the total installed cost of the solar system (contract price, inclusive of labor and equipment) per NLV MC 15.72.170B.2–B.3. The resulting valuation is applied to Table 3-A for the fee amount.

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the North Las Vegas building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in North Las Vegas

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.