Commercial Tenant Improvement / Tenant Finish Permit in Murray, Utah
Required for tenant improvement and tenant finish work in existing commercial buildings in Murray, per the city's own published Commercial Tenant Improvement checklist. Valuation for tenant finish work can be computed using the ICC Building Valuation Data February 2026 supplemental rate for occupancy classification M (Mercantile) 'Mall Tenant Finish' — $65.55 per square foot — run through the same 'Building Permit Fees, Commercial/Residential' valuation table used for new commercial construction.
Verified 2026-07-19 · Source
When you need this permit
- Commercial tenant improvement / tenant finish work — Community Development (Planning & Zoning) approval signature required before Building Department submittal, per Murray's official Commercial Tenant Improvement checklist
- Building permits cannot be accepted for plan review until the submittal is complete, per the checklist
- Spaces over 3,000 sq ft, and any medical facility or restaurant regardless of size, require a Utah State registered architect's stamp, signature, and date on the plans
- Projects at Fashion Place Mall require a landlord approval letter
- Contractor state license numbers required for general, electrical, mechanical, and plumbing contractors
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Murray City Building Permit Fees packet, 'Additions to this Table' section: 'M...............................Mall Tenant Finish.............................65.55' — a supplemental per-square-foot… Show full citationHide
Murray City Building Permit Fees packet, 'Additions to this Table' section: 'M...............................Mall Tenant Finish.............................65.55' — a supplemental per-square-foot valuation rate (beyond the standard ICC Building Valuation Data table) that Murray applies specifically to mall tenant finish projects. This valuation is then run through the same 'Building Permit Fees, Commercial/Residential' table used for new commercial construction to compute the permit fee.Murray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, effective July 1, 2026) — the same table used for new commercial construction and residential permits; Show full citationHide
Murray City 'Building Permit Fees, Commercial/Residential' table (dated 06.22.26, effective July 1, 2026) — the same table used for new commercial construction and residential permits; Murray does not publish a fee tier specific to tenant improvement beyond the Mall Tenant Finish valuation rate noted above.Murray City Code Sec. 15.08.030(C)(2) (codified at codelibrary.amlegal.com): 'The plan review fee for commercial buildings or structures is the lesser of actual costs incurred to review the plan or… Show full citationHide
Murray City Code Sec. 15.08.030(C)(2) (codified at codelibrary.amlegal.com): 'The plan review fee for commercial buildings or structures is the lesser of actual costs incurred to review the plan or sixty five percent (65%) of the building permit fee.' Buildings or structures identical (except for site considerations) to those previously reviewed and approved: the lesser of cost incurred or ten percent (10%). A plan review DEPOSIT is taken at submittal under Sec. 15.08.030(C)(1) and is credited against this fee: $200.00 for valuations $100K-$300K, $1,000.00 for $301K-$500K, $2,000.00 for $501K-$1M, $5,000.00 over $1M, $10,000.00 over $10M. The generic 65% rate is codified in Title 15 and is independently corroborated by the City's Building Permit Fees packet (which lists PRF percentages only for narrow categories), applying BOV + 65% PRF to pole signs, cell towers, racking, swimming pools, solar and EV chargers.Review timeline
Inspection process
- 1
Framing / Fire-Rated Assembly
Wall construction and any fire-rated/occupancy separation assemblies verified before close-in, per the Commercial Tenant Improvement checklist.
- 2
MEP Rough-In
Electrical (lighting, fire alarm/smoke detectors), mechanical (exhaust fans, fire/smoke dampers), and plumbing (fixture locations) rough-in verified against the submitted plans.
- 3
Final
Exit signage, emergency lighting, and all finishes verified complete before occupancy.
See the full Murray inspection guide — scheduling & re-inspection fees →
Tips
- Community Development (Planning & Zoning) approval signature is required on the Commercial Tenant Improvement checklist before the Building Department will accept the submittal for plan review.
- Spaces over 3,000 sq ft, and any medical facility or restaurant regardless of size, require a Utah State registered architect's stamp — smaller general retail/office tenant finishes do not.
- Tenant improvement projects at Fashion Place Mall specifically require a landlord approval letter, per Murray's own checklist.
- Murray's fee sheet publishes a specific ICC Building Valuation Data supplemental rate for 'Mall Tenant Finish' (occupancy M) of $65.55 per square foot — call the Building Division (801-270-2431) to confirm the applicable per-square-foot rate for tenant finish types other than mall space.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fee schedules
Checklists & handouts
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Murray building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Murray.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Murray's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Murray yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Murray lands. Privacy.
Other permits in Murray
Commercial Tenant Improvement / Tenant Finish Permit in other cities
Compare commercial tenant improvement / tenant finish permit fees across Utah →
Look up this fee in a different city →