Fire Sprinkler System Permit — Murray, Utah · Requirements sheet
Verified 2026-07-22 · Source: https://www.murray.utah.gov/DocumentCenter/View/15106/Fire-and-Life-Safety-Fee-Schedule
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fire Sprinkler System Permit in Murray, Utah
Murray operates its own independent municipal Fire Department (not the Unified Fire Authority) — new fire sprinkler system installations and additions/modifications to existing systems require a distinct plan submittal and permit from the Murray City Fire Marshals Office, per the department's own 'Fire Suppression System Submittal' requirements and 'Fire and Life Safety Fee Schedule,' separate from the Building Division's trade-permit fee sheet.
Verified 2026-07-22 · Source
When you need this permit
- All new commercial fire sprinkler (fire suppression) system installations and existing-system additions or modifications require a plan submittal and permit from the Murray City Fire Marshals Office
- Fire sprinkler systems where more than twenty (20) sprinkler appliances (heads) are added, removed, or relocated require an approved third-party review by a company approved by the Murray City Fire Marshals Office
- Design and installation via the most recent version of NFPA 13, NFPA 13-R, or NFPA 13-D adopted by the State of Utah
- Working plans drawn to an indicated scale, on uniform-size sheets, with a plan of each floor; manufacturer cut sheets and hydraulic calculations submitted with the plans
- Any structure (except one- and two-family dwellings) with a fire sprinkler system installed must have off-site monitoring
- All Fire Department Connection caps and standpipe connections must be Knox-brand locking caps
- System designer must be NICET Level III or better ('Water-Based Fire Protection Systems Layout'), a Fire Protection Engineer, or a licensed engineer with specific additional fire protection system training; plans must show the designer's NICET certification number with signature, or an engineer stamp with signature
- A new permit and third-party plan review are required whenever the fire sprinkler system's hazard classification design changes
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Fire Sprinkler Flow Test / Riser Inspection
Per the Fire and Life Safety Fee Schedule, administered by the Murray City Fire Marshals Office (801-264-2780).
- 2
Fire Sprinkler 200lbs Test
Per the Fire and Life Safety Fee Schedule.
- 3
Fire Sprinkler Above the Grid and Bracing Inspection
Per the Fire and Life Safety Fee Schedule.
- 4
Fire Sprinkler Final Inspection
Per the Fire and Life Safety Fee Schedule; required before off-site monitoring and building final sign-off.
See the full Murray inspection guide — scheduling & re-inspection fees →
Tips
- Murray Fire Department is Murray's own independent municipal fire department — confirmed via the department's official pages (murray.utah.gov/172/Fire-Department, murray.utah.gov/2193/Murray-Fire-Marshal) — it is not served by the Unified Fire Authority (UFA), which covers many other Salt Lake County municipalities.
- Murray's third-party-review trigger for sprinklers is 'more than 20 sprinkler appliances added, removed, or relocated' — a different threshold than the fire alarm permit's 'more than 5 horns/strobes' trigger. Don't assume the same number applies to both permit types.
- Off-site monitoring is required for any structure's fire sprinkler system except one- and two-family dwellings.
- All Fire Department Connection caps and standpipe connections must use Knox-brand locking caps.
- This is a separate Fire Marshals Office permit and fee track from the Building Division's 'Building Permit Fees' sheet — the $150 plan review plus $50 per inspection line items are not part of the Building Division's valuation-based fee table.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Murray building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Murray
Fire Sprinkler System Permit in other cities
Compare fire sprinkler system permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Murray project checklist
Describe your project once and get every permit, document, and fee it triggers in Murray — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →