EV Charger / EVSE Permit in Murray, Utah

Murray City publishes a distinct "EV Chargers" line item in its Building Permit Fee Sheet, separate from the flat $100 Electrical/Service Upgrade fee, for installing electric vehicle charging equipment (EVSE) at residential and commercial properties.

Verified 2026-07-19 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel capacity to serve the charger
  • Any change to electrical service within the Murray City Power service area requires separate Murray Power approval in addition to the city building permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

EV Chargers (Residential)Murray City Building Permit Fees table, effective 07/01/2026: "EV Chargers — Residential: $300 + $20 ea addtl."
$300 + $20 per additional charger
EV Chargers (Commercial)Murray City Building Permit Fees table, effective 07/01/2026: "EV Chargers — Commercial: $300 + $20 ea addtl + 65% *PRF."
$300 + $20 per additional charger + 65% Plan Review Fee

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Murray?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Building, Electrical, Mechanical & Plumbing

    Combined trade inspection administered by the Building Inspection Division (801-270-2431), per the Certificate of Occupancy Requirements form.

See the full Murray inspection guide — scheduling & re-inspection fees →

Tips

  • Murray prices EV chargers as their own fee category ($300 base + $20 per additional unit), separate from the $100 flat Electrical/Service Upgrade fee — do not file an EV charger install under the general electrical fee category.
  • If the charger installation requires a panel or service upgrade, also complete the Murray City Electrical Permit Questionnaire and, within the Murray Power service area, the Murray City Power Request for Electrical Service Information form.
  • Commercial EV charger installations pay an additional 65% Plan Review Fee on top of the base $300 + $20/unit fee; residential installations do not.

Frequently asked questions

If the installation requires a change to electrical service within the Murray City Power service area, yes — Murray Power approval is required in addition to the city building permit, per Murray's Electrical Permit process.

Yes. Per the Murray City Building Permit Fees table (effective July 1, 2026), EV Chargers have their own fee category: $300 plus $20 for each additional charger for residential, and the same base fee plus a 65% Plan Review Fee for commercial installations — distinct from the $100 flat Electrical/Service Upgrade fee.

Murray does not publish a plan-review timeline for this permit. Contact Murray City Building Inspection Division (Community & Economic Development Department) at (801) 270-2431 for current turnaround.

You'll need: Building Permit Application (eProcess 360). Depending on your project, Murray may also ask for: Murray City Electrical Permit Questionnaire; Request for Electrical Service Information (Murray City Power). See the required-documents checklist on this page for details on each.

Murray requires 1 inspection(s) for an ev charger / evse permit, in order: Building, Electrical, Mechanical & Plumbing. Schedule each through Murray City Building Inspection Division (Community & Economic Development Department) ((801) 270-2431).

Apply through Murray City Building Inspection Division (Community & Economic Development Department) at 10 E 4800 S, Suite 260, Murray, UT 84107. Phone: (801) 270-2431, email: permits@murray.utah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.murray.utah.gov/167/Building-Division.

Murray, Utah has adopted: 2024 International Building Code (IBC) — per Murray's own 'Notice of Building Code Adoption' (effective July 1, 2026) on the Building Division page; Utah Code § 15A-2-103(1)(a); superseded the 2021 IBC that had been in effect since July 1, 2023; 2021 International Residential Code (IRC) — Murray's Building Division page (Notice of Building Code Adoption, eff. 7/1/2026) states the IRC 'will remain 2021'; Utah Code § 15A-2-103(1)(b); unchanged by the 7/1/2026 code cycle; 2024 International Plumbing Code (IPC) — per Murray's Notice of Building Code Adoption (effective July 1, 2026); Utah Code § 15A-2-103(1)(d); superseded the 2021 IPC that had been in effect since July 1, 2023; 2024 International Mechanical Code (IMC) — per Murray's Notice of Building Code Adoption (effective July 1, 2026); Utah Code § 15A-2-103(1)(e); superseded the 2021 IMC that had been in effect since July 1, 2023; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective 2026-07-01, superseded the 2021 edition. NOTE: Murray's own city notice does not separately enumerate the IFGC (it lists IBC, IPC, IMC, IEBC, IECC, and NEC only) — this entry is sourced directly from the statute, which applies statewide regardless of whether a given city's own notice names it.; 2024 International Existing Building Code (IEBC) — per Murray's Notice of Building Code Adoption (effective July 1, 2026); Utah Code § 15A-2-103(1)(i); superseded the 2021 IEBC that had been in effect since July 1, 2023; 2024 International Energy Conservation Code (IECC), as amended by the State of Utah — per Murray's Notice of Building Code Adoption (effective July 1, 2026); Utah Code § 15A-2-103(1)(h); superseded the 2021 IECC that had been in effect since July 1, 2023; 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective 2026-07-01, superseded the 2021 edition. NOTE: Murray's own city notice does not separately enumerate the ISPSC — this entry is sourced directly from the statute, which applies statewide regardless of whether a given city's own notice names it.; 2023 National Electrical Code (NEC) — per Murray City Building Division page, adopted and unchanged by the July 1, 2026 update; Utah Code § 15A-2-103(1)(g); NOTE (verified 2026-07-16): Confirmed directly against Murray's own live 'Notice of Building Code Adoption' banner (murray.utah.gov/167/Building-Division, effective date July 1, 2026), which lists the 2024 IBC, IPC, IMC, IEBC, and IECC (Utah-amended), the 2023 NEC, and states the IRC 'will remain 2021.' Also confirmed directly against Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027) at le.utah.gov. CAUTION: the same Murray page also retains an older, unremoved 'Overview' paragraph further down stating 'As of July 1st 2023, the state of Utah has adopted the 2021 I Codes and the 2023 NEC' — that leftover sentence is stale and contradicts the page's own current banner; see tipsAndGotchas for this discrepancy.. Local amendments apply — see the Murray overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Murray building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.